Publicación: Evaluación económica del desarrollo de fracturamientos hidráulicos realizados en el campo cantagallo 2005-2008 Ecopetrol S.A.
| dc.contributor.advisor | Calvete González, Fernando Enrique | |
| dc.contributor.advisor | Bravo Mendoza, Oscar | |
| dc.contributor.advisor | Sarmiento, Luis Enrique | |
| dc.contributor.author | Lobo Criado, Eduardo Antonio | |
| dc.date.accessioned | 2024-03-03T18:20:35Z | |
| dc.date.available | 2010 | |
| dc.date.available | 2024-03-03T18:20:35Z | |
| dc.date.created | 2010 | |
| dc.date.issued | 2010 | |
| dc.description.abstract | Una de las alternativas que hoy en día ha demostrado ser exitosa y que es de amplia aplicación a nivel mundial para maximizar la rentabilidad de los campos, consiste en el fracturamiento hidráulico. Desde el año 2005 proyectos de fracturamiento se aplicaron al campo Cantagallo (Ecopetrol S.A.), con una producción esperada incremental que justificara la inversión. Teniendo como base el proyecto de Fracturamiento hidráulico iniciado en el año 2005, se evaluó el flujo de caja existente y se evidenció muchas faltantes a tener en cuenta. Se partió con datos básicos de la fecha y se construyeron flujos de caja de cada pozo, obteniendo valores presentes netos y tasas internas de retornos bastante altos. Con esta información se incluyeron datos reales de producción incremental del proyecto, al igual que los costos reales, obteniéndose en los flujos de caja una diferencia bastante grande entre lo estimado para el proyecto y lo real. Debido a lo anterior, y como valor agregado se realizó un análisis de riesgo mostrando las variable críticas que permiten percibirse en una matriz de riesgos del proyecto. En cada riesgo se posee sus respectivas acciones de mitigación. Se realiza un análisis de sensibilidad plasmado en graficas tipo tornado y tipo araña, visualizando los riesgos más críticos del proyecto. Finalmente, el estudio permite apreciar que aunque el proyecto en general tuvo ganancias que permitieron rápidamente recuperar la inversión, vemos que no se obtuvo los resultados pronosticados; existieron muchas variables no tenidas en cuenta desde sus inicios. | |
| dc.description.abstractenglish | One of the alternatives that nowadays that has demonstrated to be successful and it is of ample application at world-wide level to maximize the yield of the fields, consists of the hydraulic fracturamiento. From the year 2005 projects of fracturamiento were applied to the Cantagallo field (Ecopetrol S.A.), with an incremental awaited production that justified the investment. Having as it bases the project of initiated hydraulic Fracturamiento in 2005, the flow of existing box was evaluated and it demonstrated many missing ones to consider. One was divided with initial dates of the date and values present net and internal rates of quite high returns were constructed to flows of box of each well, obtaining. With this information real data of incremental production of the project were included, like the real costs, obtaining in the box flows one differentiate quite great between considered for the project and the real thing. Due to the previous thing, and as added value were realized a risk analysis showing the variable critics that allow to perceive themselves in a matrix of risks of the project. In each risk their respective actions of mitigation are controlled. A shaped sensitivity analysis is realized more in graphic returned type and type spider, visualizing the risks critics of the project. Finally, the study allows to appreciate that although the project generally had gains that quickly allowed to recover the investment, we see that did not obtain the foretold results; many variables no considered existed from their beginnings | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Hidrocarburos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/24724 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Especialización en Gerencia de Hidrocarburos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Fracturamiento hidráulico | |
| dc.subject | Valor presente neto | |
| dc.subject | Tasa interna de retorno | |
| dc.subject | Análisis de riesgo. | |
| dc.subject.keyword | Hydraulic Fracturamiento | |
| dc.subject.keyword | Net present value | |
| dc.subject.keyword | Internal rate of return | |
| dc.subject.keyword | Analysis of risk. | |
| dc.title | Evaluación económica del desarrollo de fracturamientos hidráulicos realizados en el campo cantagallo 2005-2008 Ecopetrol S.A. | |
| dc.title.english | fieconomic evaluation of the development of hydraulic fracturamientos realized in field cantagallo 2005-2008. ecopetrol s.a.fl | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 461.38 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Documento.pdf
- Tamaño:
- 20.26 MB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 63.99 KB
- Formato:
- Adobe Portable Document Format
