Publicación: Optimización de la producción del campo Galán de Ecopetrol S.A mediante un sistema de evaluación de desempeño
| dc.contributor.advisor | Sáchica Ávila, Jorge Andrés | |
| dc.contributor.advisor | Bolaños Rodríguez, Edwinder | |
| dc.contributor.author | Marín Hurtado, Luis Ernesto | |
| dc.contributor.author | Anaya Mancipe, Jose Andres | |
| dc.date.accessioned | 2024-03-03T19:59:35Z | |
| dc.date.available | 2013 | |
| dc.date.available | 2024-03-03T19:59:35Z | |
| dc.date.created | 2013 | |
| dc.date.issued | 2013 | |
| dc.description.abstract | El Campo Galán, ubicado al Norte de la Concesión de Mares, en la Cuenca del Valle Medio del Magdalena. Produce principalmente crudo de la Formación Mugrosa B y C con un espesor promedio de 1800 pies, ésta zona tiene importancia comercial cerca a la Falla Casabe que acumulan cantidad de hidrocarburos al constituirse una trampa estructural entre la Falla Casabe y las fallas laterales. Cuenta con 122 pozos de los cuáles 45 fueron abandonados por motivo del proyecto de la ampliación de la refinería de Barranca Bermeja. Se le han realizado estimulaciones a 11 pozos, en los años 1989, 1990, 1991 y 1992, a 7 pozos, inyección de CO2 y en el año 2008 a 4 pozos fracturamientos; en 1974 se inició un piloto de inyección de agua y de acuerdo al resultado se decidió extender el piloto a la zona A, iniciando en Julio 1977 terminando en 1978. Durante su vida productiva ha presentado arenamientos. Debido a esto se decidió desarrollar este trabajo que tiene como fin implementar alternativas que permitan mejorar la producción del campo Galán mediante un análisis de ingeniería. Basado en la aplicación de diversos procesos y herramientas como el Oil Field Manager (OFM). Estas alternativas están sujetas a seleccionar pozos candidatos para trabajos de workover como cañoneos, recañoneos, estimulaciones, entre otros y ubicación de pozos infill que permitan drenar las zonas que aún no han sido alcanzadas. Se hizo necesario realizar un análisis financiero que permita la viabilidad de la aplicación de las alternativas en el campo, logrando así conocer las variables económicas como el valor presente neto, la tasa interna de retorno, la relación costo beneficio y teniendo en cuenta la tasa de oportunidad para el desarrolló de la inversión en la Empresa Colombiana de Petróleos Ecopetrol S.A. | |
| dc.description.abstractenglish | The Galán field located north of the Concesión de Mares in the basin of Valle Medio del Magdalena. It mainly produces crude Mugrosa Formation B and C with an average depth of 1800 [ft]. This área has commercial importance close to the Casabe fault that accumulating oil in a structural trap between Casabe fault and lateral faults. It has 122 wells of which 45 were abandoned due to the proposed expansión of the refinery Barrancabermeja. Between 1989 and 1992, stimulations have been performed in 7 wells, injection of CO2 and in 2008 hydraulic fracturing to 4 wells, for a total of 11 wells. In 1974 pilot water injection was performed and due to its results it was extended to zone A beginning in July 1997 to 1978. During its life screenouts presented. For all the above it was decided to develop this work that aims primarily to improve Galán field production by an engineering analysis based on the application of various processes and tools such as the Oil Field Manager (OFM). This analysis is subject to the selection of candidate wells for workover as shelling, re-shelling, stimulations, among others and location of infill wells to allow drainage áreas that have not yet been reached. It was necessary to conduct a financial analysis to determine the viability of each of the alternatives in the field, thus knowing the economic variables, the net present value, internal rate of return and the cost-benefit ratio, taking into account the rate of opportunity for the development of investment in Colombian oil company Ecopetrol SA. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/28283 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Análisis Avanzado De Ingeniería | |
| dc.subject | Campo Galán | |
| dc.subject | Trabajos De Reacondicionamiento | |
| dc.subject | Pozos Infill | |
| dc.subject | Oil Field Manager (Ofm) | |
| dc.subject | Evaluación Económica. | |
| dc.subject.keyword | Advanced Engineering Analysis | |
| dc.subject.keyword | Galán Oilfield | |
| dc.subject.keyword | Workover Operation | |
| dc.subject.keyword | Infill Well | |
| dc.subject.keyword | Oil Field Manager (Ofm) | |
| dc.subject.keyword | Economical Evaluation | |
| dc.title | Optimización de la producción del campo Galán de Ecopetrol S.A mediante un sistema de evaluación de desempeño | |
| dc.title.english | Production optimization of the galán oilfield of Ecopetrol s. a.; through a performance evaluation system2 | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 331.84 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Documento.pdf
- Tamaño:
- 10.06 MB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 563.52 KB
- Formato:
- Adobe Portable Document Format