Publicación: Revisión hidráulica y actualización de los sistema de relevo a la tea no7 de la planta de cracking catalítico uopii, complejo Barrancabermeja (Ecopetrol S.A)
| dc.contributor.advisor | Alvarez Cifuentes, Mario | |
| dc.contributor.advisor | Angulo Pedrozo, Nelson Fernando | |
| dc.contributor.author | Bello Zapata, Iván Darío | |
| dc.date.accessioned | 2024-03-03T18:13:27Z | |
| dc.date.available | 2010 | |
| dc.date.available | 2024-03-03T18:13:27Z | |
| dc.date.created | 2010 | |
| dc.date.issued | 2010 | |
| dc.description.abstract | En ECOPETROL S.A. como parte de la coordinación de Integridad Técnica, se tiene como objetivo verificar el buen funcionamiento de los sistemas de seguridad del Complejo Barrancabermeja, específicamente para este proyecto, la planta de Cracking Catalítico UOP II. Para lograr este objetivo se realiza, como primera instancia, una recopilación de la información del proceso y de los equipos e instrumentos existentes en la planta. Posteriormente se realiza una revisión visual en campo de los sistemas de alivio de presión (Válvulas de Seguridad) y se encontraron algunas no conformidades al comparar los datos encontrados en la revisión en campo con la información del fabricante. Con base a estas no conformidades se elabora un informe en el que se dan ciertas conclusiones y recomendaciones para tener en cuenta en inspecciones futuras. Finalmente con base a las consideraciones dadas por las Normas API 520 y 521, se elabora una hoja de cálculo para determinar la capacidad de relevo de las válvulas de seguridad y una hoja de cálculo para el dimensionamiento de PSV`s, para 5 equipos diferentes de la planta de Cracking UOP II, esto con el fin de asegurar que dichas válvulas se encuentran capacitadas para relevar la cantidad requerida de flujo durante la contingencia gobernante y afirmar que el área de orificio de las mismas fue correctamente establecida. Al observar los resultados obtenidos con las hojas de cálculo y compararlos con los datos contenidos en los datasheets de las válvulas de los equipos estudiados, se puede confirmar la efectividad de estas hojas y su correcto funcionamiento para el dimensionamiento de PSV`s. | |
| dc.description.abstractenglish | In ECOPETROL SA as part of the coordination of technical integrity, is aimed to verify the proper functioning of security systems of the Barrancabermeja Complex, specifically for this work, the Catalytic Cracking UOP II Plant. To achieve this goal is realized as the first instance, an information gathering process and the equipment and instruments in the plant. Later we made a visual check on field of pressure relief systems (safety valve) and non-conformities were found when comparing the data found in the review on the field with the manufacturer data. Based on these non-conformities a report shall be make with recommendations and comments for consideration in future inspections. Finally, based on the considerations given by the API Standards 520 and 521, were produced a spreadsheet to determine the capacity of relief safety valve and a spreadsheet for sizing of PSV `s, for 5 different vessels of Cracking UOP II Plant, this to ensure that these valves are capable of releasing the required amount of flow during the contingency ruling and affirm that the effective orifice was properly established. Looking at the results from the spreadsheet and compare them with data in the datasheets of the valves studied, we can confirm the effectiveness of these forms and their proper functioning for the sizing of PSV `s. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Químico | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/24160 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería Química | |
| dc.publisher.school | Escuela de Ingeniería Química | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Craqueo catalítico | |
| dc.subject | Sistemas de relevo | |
| dc.subject | Válvulas de Seguridad | |
| dc.subject | UOP II | |
| dc.subject | ECOPETROL. | |
| dc.subject.keyword | Catalytic Cracking | |
| dc.subject.keyword | Relief systems | |
| dc.subject.keyword | Safety Valve | |
| dc.subject.keyword | UOP II | |
| dc.subject.keyword | ECOPETROL. | |
| dc.title | Revisión hidráulica y actualización de los sistema de relevo a la tea no7 de la planta de cracking catalítico uopii, complejo Barrancabermeja (Ecopetrol S.A) | |
| dc.title.english | Hydraulic review and update of systems release of tea no. 7 of catalytic cracking uop ii plant | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 96.81 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 133.36 KB
- Formato:
- Adobe Portable Document Format