Publicación: Evaluación de la productividad del campo escuela colorado mediante software especializado de producción
| dc.contributor.advisor | Calvete González, Fernando Enrique | |
| dc.contributor.advisor | Fonseca Castro, Jose Luis | |
| dc.contributor.advisor | Pérez Reyes, Carlos Andrés | |
| dc.contributor.author | Mora Torres, Jhon Fredy | |
| dc.contributor.author | Sierra Corzo, Yuly Catherine | |
| dc.date.accessioned | 2024-03-03T20:37:42Z | |
| dc.date.available | 2014 | |
| dc.date.available | 2024-03-03T20:37:42Z | |
| dc.date.created | 2014 | |
| dc.date.issued | 2014 | |
| dc.description.abstract | Este proyecto tiene como finalidad evaluar la productividad del Campo escuela Colorado mediante la ayuda del software especializado de producción PIPESIM de la empresa SCHLUMBERGER. Mediante la recolección, verificación y análisis de la información disponible del campo, se modelan 19 pozos seleccionados del colector norte y colector sur, para los cuales se calcula la densidad óptima de las perforaciones mediante el método de Perez y Kelkar, obteniendo un nuevo caudal el cual se procede a modelar en el software, posteriormente se realiza el análisis nodal sensibilizando la tubería de producción, variando su diámetro y analizando el comportamiento que presento con cada escenario, de igual manera se sensibiliza el caudal nominal de cada uno de los sistemas de levantamiento artificial. En cuanto al sistema de recolección se le realiza un estudio de la hidráulica que presenta el campo con los nuevos caudales, analizando parámetros como son; velocidad de la mezcla bifásica menor que el 7% de la velocidad de erosión, gradiente de presión por fricción en los tramos de tubería menor a 1 psi/100ft, evitar en lo posible el régimen de flujo tipo tapón, basados en la norma de diseño API RP14E. Por último se realizó el análisis financiero de los escenarios anteriormente mencionados, para determinar la viabilidad económica del proyecto, dando como resultado que el proyecto de recañoneo conjunto de los 19 pozos no es económicamente viable, pero los valores obtenidos en la evaluación financiera individual muestran que los pozos Colorado 44, Colorado 55 y Colorado 67 cumplen de manera positiva la totalidad de los criterios analizados en dicha evaluación. | |
| dc.description.abstractenglish | This project aims to evaluate the productivity of Colorado School field through SCHLUMBERGER’S company specialized production software Pipesim. Through collection, verification and analysis of the available information from Colorado field, 19 wells previously selected from north and south collector are modeled, its best drilling density it’s calculated through Perez and Kelkar's method, getting a new flow which is applicable to model by the software, the nodal analysis is subsequently performed by sensitizing production tubing, varying diameter and analyzing the behavior presented in each scenario; likewise the nominal flow of each artificial lift system is sensitized. For the collection system a study of field’s hydraulic is performed due to new flows, analyzing some parameters like: biphasic mixture velocity lower than 7% of the erosion velocity, frictional pressure gradient in the pipe sections lower than 1 psi/100ft, avoiding as much as possible plug type flow regime based on standard design API RP14E. Finally, the financial analysis of the above mentioned scenarios was performed to establish if the project was economically viable, Giving as score the general recanoneo Project from 19 wells It realized that isn’t economically feasible, but the values 44, Colorado 55 and Colorado 67 it fulfill in the positive way in all standards analyzed inside financial test. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/30057 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Producción | |
| dc.subject | Optimización | |
| dc.subject | Análisis Nodal | |
| dc.subject | Pipesim | |
| dc.subject | Productividad. | |
| dc.subject.keyword | Production | |
| dc.subject.keyword | Optimization | |
| dc.subject.keyword | Nodal Analysis | |
| dc.subject.keyword | Pipesim | |
| dc.subject.keyword | Productivity. | |
| dc.title | Evaluación de la productividad del campo escuela colorado mediante software especializado de producción | |
| dc.title.english | Productivity evaluation of colorado school field through specialized production software. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 587.5 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 495.83 KB
- Formato:
- Adobe Portable Document Format
