Publicación: Diseño e implementación de una metodología para el seguimiento y posterior Análisis operativo de un pozo estratigráfico, aplicado al pozo anh-patia-1-st-p
| dc.contributor.advisor | Pérez Angulo, Julio Cesar | |
| dc.contributor.advisor | Machuca Boada, Werney de Jesús | |
| dc.contributor.author | Álvarez Zapata, Hernán Antonio | |
| dc.contributor.author | Rojas Torres, Diana Carolina | |
| dc.date.accessioned | 2024-03-03T19:59:31Z | |
| dc.date.available | 2013 | |
| dc.date.available | 2024-03-03T19:59:31Z | |
| dc.date.created | 2013 | |
| dc.date.issued | 2013 | |
| dc.description.abstract | En este trabajo se presentan algunas generalidades sobre la perforación de pozos estratigráficos, la descripción de las actividades planeadas más comunes, posibles actividades no planeadas y sus causas y las más frecuentes fallas de equipos presentes durante una perforación, se muestran cada uno de los pasos necesarios para desarrollar la perforación, además de la localización y descripción de las actividades planeadas para la ejecución de la perforación del pozo ANH-PATIA 1-ST-P, la duración de estas y el tiempo proyectado para su desarrolló. Con base en la planeación previa de la perforación del pozo ANH-PATIA 1-ST-P se desarrolla un análisis operacional basados en el diseño e implementación de una metodología que permitió el seguimiento de la operación y recopilación de información desde el día de inicio de operaciones hasta la desmovilización del equipo, facilitando el análisis de las operaciones aquí desarrolladas, clasificándolas fase a fase, realizando la distribución de tiempo general y porcentual de cada una, de manera gráfica facilitando su asimilación. Por medio de este análisis se pudo identificar los principales problemas operacionales presentados durante el desarrolló del proyecto ANH-PATIA 1-ST-P, causados por las diversas fallas de equipos básicos responsabilidad de las empresas contratistas de servicios, la causa y correcciones tomadas, además se identificaron también operaciones no planeadas debido a las exigencias propias del pozo las cuáles no estaban programadas en el plan de perforación. También se identificaron las actividades que nos permitieron recuperar tiempo perdido y las actividades donde se perdió tiempo mediante el análisis de la desviación de tiempos planeados contra tiempos ejecutados de cada operación y el análisis global de los tiempos totales de operación. | |
| dc.description.abstractenglish | In this paper we present some generalities about stratigraphic drilling, the description of the most common planned activities, possible unplanned activities, their causes, and the most common equipment failures coming up during drilling. It shows every step to develop drilling, the location and description of the planned activities for the execution of the drilling in well ANH-PATIA 1-ST-P, the length of these and the projected time for development. Based on previous planning of the drilling in well ANH-PATIA 1-ST-P, we developed an operational analysis based on the design and implementation of a methodology that allowed monitoring the operation and data collection from the first day operations to the demobilization of equipment. In that way we facilitated operations analysis developed here, classified phase to phase the procedure, made the overall time distribution and percentage of each one of them, and in a graphical form, we facilitated their absorption. Through this analysis we were able to identify the major operational problems presented during the project development PATIA ANH-1-ST-P. They were caused by the various basic equipment failures that were responsibility of service contractors, the causes and corrections made. In addition, some unplanned operations were identified due to the demands of the well, which were not scheduled in the drilling plan. We also identified the activities that allowed us to recover time and activities in which time was wasted by analyzing the deviation of planned times against execution time of each operation and the overall analysis of the total operating time. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/28261 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Pozos Estratigráficos | |
| dc.subject | Clasificación De Tiempos | |
| dc.subject | Anh-Patía 1-St-P | |
| dc.subject | Actividades Planeadas | |
| dc.subject | No Planeadas | |
| dc.subject | Fallas De Equipos | |
| dc.subject | Desviación De Tiempos | |
| dc.subject | Perforación | |
| dc.subject | Metodología. | |
| dc.subject.keyword | Stratigraphic Well | |
| dc.subject.keyword | Classification Of Time | |
| dc.subject.keyword | Anh-Patia 1-St-P | |
| dc.subject.keyword | Planned Activities | |
| dc.subject.keyword | No Planned | |
| dc.subject.keyword | Equipment Failures | |
| dc.subject.keyword | Deviation Of Times | |
| dc.subject.keyword | Drilling | |
| dc.subject.keyword | Methodology. | |
| dc.title | Diseño e implementación de una metodología para el seguimiento y posterior Análisis operativo de un pozo estratigráfico, aplicado al pozo anh-patia-1-st-p | |
| dc.title.english | Design and implementation of a methodology for monitoring and subsequent operational analysis of a stratigraphic well, applied to well anh-patia-st-p | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 133.92 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Documento.pdf
- Tamaño:
- 13.28 MB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 578.87 KB
- Formato:
- Adobe Portable Document Format
