Publicación: Modelo de planeación y ejecución de proyectos de perforación estratigráfica
| dc.contributor.advisor | Santos Santos, Nicolás | |
| dc.contributor.author | Correa Montoya, Cindy | |
| dc.contributor.author | Mayor Vera, Alejandra | |
| dc.date.accessioned | 2024-03-03T18:20:37Z | |
| dc.date.available | 2010 | |
| dc.date.available | 2024-03-03T18:20:37Z | |
| dc.date.created | 2010 | |
| dc.date.issued | 2010 | |
| dc.description.abstract | Fundamentado en los lineamientos del Project Management Institute, el presente documento expone un Modelo de Plan de Proyecto para la administración operacional de la perforación del pozo estratigráfico profundo: “ANH-B/VTURA-1-ST-P” En primera instancia se contextualiza el Proyecto en el Convenio de la Universidad Industrial de Santander y la Agencia Nacional de Hidrocarburos, de forma seguida, se presentan los antecedentes del Proyecto, se referencian aspectos teóricos del Pozo estratigráfico Profundo ANH-B/VTURA-ST-1-P tales como localización geográfica y geopolítica, se presentan las características ambientales y una breve descripción a nivel geológico y geofísico del mismo. Posteriormente se describen sistemáticamente los aspectos funcionales del proyecto, recomendando en el marco de la ética, las estrategias del diseño de integración y alcance, los planes de Costos, Tiempo, Riesgos, Procura, Calidad, Comunicaciones y la propuesta de gestión para los recursos humanos. Finalmente, se anexan documentos que contienen los diseños, planos, presupuestos y tarifas, propios de la operación de perforación, que se recomiendan como base para la ejecución del proyecto. Basándose en una amplia revisión bibliográfica, en previos estudios similares en Colombia, en recomendaciones de personal experto y en su propia experiencia laboral, las autoras pretenden con esta monografía entregar a la Escuela de Ingeniería de Petróleos, un Documento Guía para la Planeación, Ejecución y Control del Proyecto de Perforación de pozos estratigráficos, de tal forma que el documento sirva como referencia para otros proyectos de esta índole, que se ejecuten entre la escuela con la Agencia Nacional de Hidrocarburos. | |
| dc.description.abstractenglish | Based on the guidelines of Project Management Institute this document shows a Model Plan Project for operational management of drilling a deep stratigraphic well: “ANH-B/VTURA-1-STP”1 First of all, it is contextualized the project in the Agreement between Industrial University of Santander (UIS) and the National Hydrocarbon Agency (ANH), afterwards, are presented the background of the project, are referenced theorical aspects of deep stratigraphic well ANHB/VTURA-1-ST- P such as geographical and geopolitical location, also are presented the environmental characteristics and a brief geological and geophysical description of the well. Subsequently, are described systematically the functional aspects of the project, recommending under the ethical framework the strategies of integration design and scope, cost plans, time, risks, quality, communications and also the management proposal for human resources. Finally, are attached the documentation about design, plans, budgets and rates which are recommended as a basis for project implementation. Based on an extensive literature review on previous similar studies carried out in Colombia and according to some recommendations from expert personnel, and their own experiences, the authors through this monograph pretend to provide for School of Petroleum Engineering, a guidance paper for planning, implementation and project control of a drilling stratigraphic well. Therefore, this paper will serve as reference for other projects, which can be executed between the university (UIS) and the National Hydrocarbons Agency (ANH). | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Hidrocarburos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/24732 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Especialización en Gerencia de Hidrocarburos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Pozos estratigráficos | |
| dc.subject | Planeación | |
| dc.subject | Ejecución y control. | |
| dc.subject.keyword | Stratigraphic wells | |
| dc.subject.keyword | Planning | |
| dc.subject.keyword | execution and control. | |
| dc.title | Modelo de planeación y ejecución de proyectos de perforación estratigráfica | |
| dc.title.english | Model for planning and execution of projects stratigraphic drilling | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 130.07 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 45.49 KB
- Formato:
- Adobe Portable Document Format
