Publicación: Optimización de la producción en la formación carbonra inferios, yacimientos llanos nortes, mediante un sistema de evaluación de desempeño
| dc.contributor.advisor | Pineda Gómez, Cesar Augusto | |
| dc.contributor.advisor | Palma Bustamante, Jorge Mario | |
| dc.contributor.author | Urquijo Marín, Erika | |
| dc.contributor.author | Ortiz Rios, Jessica | |
| dc.date.accessioned | 2024-03-03T18:37:35Z | |
| dc.date.available | 2011 | |
| dc.date.available | 2024-03-03T18:37:35Z | |
| dc.date.created | 2011 | |
| dc.date.issued | 2011 | |
| dc.description.abstract | Cerca de un 70% de la producción mundial de petróleo proviene de campos en estado de madurez. Por lo tanto, el mejoramiento del recobro en tales campos, con el consecuente incremento en valor, se está convirtiendo en una prioridad para las empresas operadoras. Generalmente, para conseguir este objetivo, se requiere de la aplicación de ingeniería en conjunto con nuevas tecnologías. Un enfoque práctico de ingeniería, relativamente rápido para identificar oportunidades de incremento de producción en campos maduros, lo constituye el uso de metodologías de trabajo estructurado basadas en sistema de evaluación o monitoreo y seguimiento del comportamiento de los pozos, yacimientos o entes dinámicos. Este trabajo presenta la aplicación de un enfoque metodológico a un campo maduro ubicado en la cuenca de los Llanos Orientales, en Colombia, lo cual permitió la identificación y selección de oportunidades que logran incrementar la tasa de producción del campo. Adicional a esto, presenta un análisis económico para evaluar la factibilidad de aplicar dichas oportunidades. La Metodología estructurada se fundamenta en la aplicación de Procesos derivados de la combinación de Herramientas disponibles en DSSy otras aplicaciones computacionales. Estos procesos permiten la evaluación del desempeño del yacimiento y combinados conforman lo que se denomina Sistema. La evaluación del sistema define las acciones finales a seguir en los ámbitos de pozo y de campo. Una de las ventajas del enfoque es que permite obtener resultados en tiempos relativamente cortos, comparados con estudios de mayor envergadura, aún con riesgos e incertidumbres manejables. La consecuencia obvia es que el adelanto de las actividades generadoras de producción se traduce en ganancias monetarias significativas para cualquier empresa. El presente documento tiene como objetivo explicar los pasos que se desarrollaron, la metodología de integración, y el proceso de análisis usado para la identificación de los trabajos de reacondicionamiento y para la definición de localizaciones para pozos nuevos en los Campos Caño Limón y | |
| dc.description.abstractenglish | About 70% of world oil production comes from mature fields. Therefore the improvement of the recovery in such fields, with a consequent increase in value, is becoming a priority for the operating companies. Generally, to achieve this goal, it is required to apply engineering together with new technologies. A practical approach to engineering, relatively quick to identify opportunities to increase production in mature fields, is the use of structured work methodologies. These are based on evaluation and surveillance system and monitoring the performance of wells, reservoirs or dynamic entities. This paper presents the application of a methodological approach to a mature field located in the Llanos Basin, Colombia, which allowed the identification and selection of opportunities that manage to increase the production rate of the field. Additionally, an economic analysis to evaluate the feasibility of implementing such opportunities is presented. The structured methodology is based on the application of processes derived from the combination of tools available on the DSS and other computer applications. These processes allow the evaluation of reservoir performance and when they are combined form what is called System. The evaluation system defines the final actions to be taken at the well and field. One of the advantages of the approach is that it makes it possible to obtain results in a relatively short time compared with larger studies, even with manageable risks and uncertainties. The obvious consequence is that the advancement of production-generating activities resulting in significant monetary gains to any company. This paper aims to explain the steps that were developed, the integration methodology, and analysis process used for identification of the workover operations and for defining locations for new wells in the Caño Limón and Caño Yarumal Fields. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/25047 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Análisis avanzado de ingeniería | |
| dc.subject | Campo Caño Limón | |
| dc.subject | Campo Caño Yarumal | |
| dc.subject | Trabajos de reacondicionamiento | |
| dc.subject | Perforación de pozos de desarrollo | |
| dc.subject | Evaluación económica. | |
| dc.subject.keyword | Advanced Engineering Analysis | |
| dc.subject.keyword | Caño Limón Field | |
| dc.subject.keyword | CañoYarumal Field | |
| dc.subject.keyword | Workover Operation | |
| dc.subject.keyword | Infill Drilling | |
| dc.subject.keyword | Economical Evaluation. | |
| dc.title | Optimización de la producción en la formación carbonra inferios, yacimientos llanos nortes, mediante un sistema de evaluación de desempeño | |
| dc.title.english | Production optimization in the lower carbonera formation, llanos norte reservoir, trough a performance evaluation system | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 132.95 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 487.04 KB
- Formato:
- Adobe Portable Document Format
