Publicación: Estudio de confiabilidad de los equipos críticos de la línea de producción planta 1 de Propilco S.A. y la línea de producción compuestos 3 de Ajover S.A.
| dc.contributor.advisor | Villarreal, Fernando | |
| dc.contributor.author | Burgos Sequeda, Omar Andrés | |
| dc.contributor.author | Lobelo Diaz, Alvaro Luis | |
| dc.date.accessioned | 2024-03-03T17:30:53Z | |
| dc.date.available | 2009 | |
| dc.date.available | 2024-03-03T17:30:53Z | |
| dc.date.created | 2009 | |
| dc.date.issued | 2009 | |
| dc.description.abstract | Esta monografía desarrolla un modelo integral para identificar cuales son los equipos críticos de una planta de producción con el objetivo de realizar la estimación y análisis de los parámetros de confiabilidad, mantenibilidad y disponibilidad de estos equipos, y recomendar unas estrategias adecuadas de mantenimiento que se vean reflejadas en el aumento de la producción y disminución de los costos de reparación convirtiendo a mantenimiento en un departamento que genera valor a la empresa. Como caso de estudio se toma una planta petroquímica (Propilco S.A.) y una planta manufacturera (Ajover S.A.) para abarcar dos sectores fundamentales de la industria, sin embargo esta metodología puede ser aplicada a cualquier empresa del sector industrial y de servicios que quieran mejorar el mantenimiento. Inicialmente se desarrollan los conceptos teóricos de criticidad, distribución de Weibull, indicadores de confiabilidad, mantenibilidad y disponibilidad, método i-kaésimo y teorías de mantenimiento (correctivo, preventivo, TPM y RCM) para luego ser aplicados a los casos de estudio. Para cada caso se realiza una descripción del proceso de producción identificando las variables físico-químicas y los equipos que componen cada planta; estos se tienen en cuenta para llevar a cabo el estudio de criticidad; de esta forma se reduce el número de equipos que se toman para el estudio de confiabilidad. El siguiente paso consiste en recopilar los datos de tiempos entre fallas y tiempos de reparación de los equipos críticos, entregados por el departamento de mantenimiento de cada empresa, con estos se calculan los indicadores de confiabilidad, mantenibilidad y disponibilidad a través del método i-kaésimo, la distribución Weibull y la formula del tipo de disponibilidad deseada. Los indicadores calculados permiten analizar el comportamiento de cada equipo crítico teniendo en cuenta su ubicación en la curva de Davies, por lo que finalmente se proponen estrategias de mantenimiento para mejorar la confiabilidad. | |
| dc.description.abstractenglish | This monograph develops an integral model to identify the critical equipments of a production plant with the purpose of to do an estimation and analyze the indicators of Reliability, Maintainability and Availability of these equipments, to establish recommendations or good strategies of maintenance that result in the increase of production and decrease of repair costs, so the maintenance department becomes an important value for the company. As case of study are taken a petrochemistry plant (Propilco S.A.) and a manufacture plant (Ajover S.A.) to cover two fundamental sectors of the industry, however this methodology can be used in any kind of industry and services companies that have the intention of improve their maintenance. First of all are developed the theoretical concepts of criticality, Weibull distribution, indicators of reliability, availability and maintainability, method i-kaesimo and theories of maintenance (corrective, preventive, TPM and RCM) in order then to be applied to the cases of study. For each case, a description of the process of production is carried out for identifying the physical-chemistry variables and the equipments that compose each plant. These are taken into account to carry out the criticality study; in this way is reduced the number of equipments that are taken for the study of reliability. The following step consist on gather the data of times between failure and times to repair of the critical equipments, delivered by the maintenance department of each company, with these are calculated the indicators of reliability, availability and maintainability through method ikaesimo, Weibull distribution and the formula of the type of availability desired. The indicators calculated permit to analyze the behavior of each critical equipment keeping in mind their location in the curve of Davies, for which finally are proposed maintenance strategies for improve the reliability. 1 | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/22139 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Criticidad | |
| dc.subject | Distribución Weibull | |
| dc.subject | Mantenibilidad | |
| dc.subject | Confiabilidad | |
| dc.subject | Disponibilidad | |
| dc.subject | Indicadores | |
| dc.subject | Propilco | |
| dc.subject | Ajover. | |
| dc.subject.keyword | Criticality | |
| dc.subject.keyword | Weibull Distribution | |
| dc.subject.keyword | Maintainability | |
| dc.subject.keyword | Reliability | |
| dc.subject.keyword | Availability | |
| dc.subject.keyword | Ram Indicators | |
| dc.subject.keyword | Propilco | |
| dc.subject.keyword | Ajover. | |
| dc.title | Estudio de confiabilidad de los equipos críticos de la línea de producción planta 1 de Propilco S.A. y la línea de producción compuestos 3 de Ajover S.A. | |
| dc.title.english | Study of reliability of the critical equipments of the production line plant 1 from propilco s.a. and the production line compound 3 from ajover s.a. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 165.8 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 79.79 KB
- Formato:
- Adobe Portable Document Format