Publicación: Gerenciamiento del plan de mantenimiento para el sistema de aire acondicionado de precisión del edificio del cor de la refinería de Barrancabermeja con base en la metodología r.c.m.
| dc.contributor.advisor | Zuluaga Molina, Rodolfo | |
| dc.contributor.author | Gómez Gómez, Luis Fernando | |
| dc.date.accessioned | 2024-03-03T19:39:46Z | |
| dc.date.available | 2012 | |
| dc.date.available | 2024-03-03T19:39:46Z | |
| dc.date.created | 2012 | |
| dc.date.issued | 2012 | |
| dc.description.abstract | Los sistemas de ventilación y climatización de aire tienen la misión de ajustar la calidad del aire interior en las condiciones del confort térmico, de humedad y presión positiva en un área determinada. Esta monografía se enfoca en la implementación de una estrategia de mantenimiento que permita que el sistema de aire acondicionado de precisión sea confiable e ininterrumpido, con el fin de reducir los impactos por la ausencia de este en los espacios habitados por componentes electrónicos de comunicación y control encargados de asegurar la operación remota de 16 plantas de la Refinería de Barrancabermeja ECOPETROL S.A. Por sus características constructivas estos componentes electrónicos producen altas temperaturas y son muy susceptibles a la humedad y gases no inertes. Es por esto que el suministro de aire de precisión nunca debe faltar y dado los numerosos y diferentes componentes que podrían causar la interrupción del servicio, es necesario implementar un plan que no como en la actualidad atiende fallas o ejecuta preventivos no eficaces, sino más bien aseguren la total disponibilidad y confiabilidad de los equipos de aire acondicionado de precisión ya que una interrupción no controlada de este servicio podría significar la apagada de la refinería de Barrancabermeja. Es asi como se propone la metodología RCM (mantenimiento basado en confiabilidad por sus siglas en inglés) como una opción viable para asegurar una correcta gestión de mantenimiento a cada uno de los equipos y componentes asociados a Aire acondicionado de precisión; esta metodología consiste en el desarrollo de un plan de mantenimiento basado en el análisis de fallos de los componentes y la estructuración de las tareas y recursos necesarios para evitar que estas fallas ocurran con el fin de hacer el balance de recurso necesario y hacer intervenciones técnica y económicamente viables, que se traduzcan en cero interrupciones del servicio. | |
| dc.description.abstractenglish | Ventilation and air conditioning systems have a mission to set the indoor air quality in the conditions of thermal comfort, humidity and positive pressure in a particular area. This paper focuses on the implementation of a maintenance strategy that allows the air conditioning precision system be reliable and uninterrupted, in order to reduce the impacts by the absence of this in the space inhabited by electronic communication and control components responsible for ensure the remote operation of 16 plants of the Barrancabermeja Refinery Ecopetrol S. A. By their construction features, these electronic components produce high temperatures and they are very susceptible to moisture and inert gases. That is why the precision air supply must not be missing and because the many different components that could cause service interruption, is necessary to implement a plan that does not meet fault or no effective preventive runs, as at present, but rather to ensure full availability and reliability of air conditioning precision equipment because uncontrolled interruption of this service could mean the off of the Barrancabermeja Refinery. This is how the methodology proposed RCM (acronym in English) as a viable option to assure a correct maintenance management to each of the computers and components associated with precision air conditioning; this methodology consists in development of a maintenance plan based on the analysis of component failures and the structuring of tasks and resources to prevent these failures happen in order to take stock of action and make necessary technical assistance and economically viable, that will mean zero service interruptions. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/27700 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Estrategia De Mantenimiento | |
| dc.subject | Rcm | |
| dc.subject | Aire Acondicionado De Precision | |
| dc.subject | Edificio De Control Central. | |
| dc.subject.keyword | Maintenance Strategy | |
| dc.subject.keyword | Rcm | |
| dc.subject.keyword | Precision Air Conditioning | |
| dc.subject.keyword | Central Building Control Subject | |
| dc.title | Gerenciamiento del plan de mantenimiento para el sistema de aire acondicionado de precisión del edificio del cor de la refinería de Barrancabermeja con base en la metodología r.c.m. | |
| dc.title.english | Maintenance management plan for the air conditioning precision system of cor building based on rcm methodology in the barrancabermeja refinery. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
