Publicación: "evaluación del cambio de bombeo mecánico y bombeo electrosumergible en 6 pozos del campo cantagallo"
| dc.contributor.advisor | Nariño Remolina, Fredy Abelardo | |
| dc.contributor.author | Flórez Caicedo, Camilo Andrés | |
| dc.contributor.author | Sierra Moreno, Candido Moises | |
| dc.date.accessioned | 2024-03-03T17:05:00Z | |
| dc.date.available | 2008 | |
| dc.date.available | 2024-03-03T17:05:00Z | |
| dc.date.created | 2008 | |
| dc.date.issued | 2008 | |
| dc.description.abstract | Gracias a la demanda de crudo, a nivel mundial se ha visto incrementado el precio del barril, lo que conlleva a que en la industrial del petróleo se piense en buscar diferentes métodos para aumentar la producción de hidrocarburos aprovechando con esto las propiedades de la formación, debido a esto se han implementado diversos sistemas de levantamiento artificial para poder obtener el potencial máximo de caudal en los pozos. Unos de los sistemas de levantamiento artificial más utilizado en la producción de hidrocarburos es el bombeo mecánico el cual maneja buenos caudales en pozos someros, por lo que no aplica a pozos en los cuales la formación productora se encuentre a grandes profundidades, para tratar estos pozos se recomiendan utilizar otros sistemas entre los cuales se encuentra el bombeo electrosumergible; el cual tiene muy buen rendimiento lo que se refleja en el aumento de la producción. En este proyecto se realizo un estudio a seis (6) pozos en el campo Cantagallo donde se tuvo como referencia la producción y rentabilidad de cada uno de estos. Durante el desarrollo del proyecto se aplicó el concepto de curvas IPR, VLP, flujo de caja y tasa interna de retorno (TIR), como parte de un análisis económico. Con base en la aplicación de los conceptos anteriores se obtuvo un análisis técnico y económico de cada uno de los pozos donde se demuestra el grado de rentabilidad en la implementación de estos métodos de levantamiento artificial en los pozos | |
| dc.description.abstractenglish | With demand for crude worldwide has increased the price per barrel, which leads to the oil industry think of different search methods to increase production of oil exploiting the properties of this training, This is due to have implemented various artificial lifting systems in order to obtain the maximum potential flow into wells. Some of the more artificial lifting systems used in the production of hydrocarbons is the mechanical pump which handles good flow in shallow wells and therefore does not apply to wells in which the training is producing at great depths, to treat these wells are recommended to use other systems, which includes electric submersible pumping; which has very good performance as reflected in increased production. This project is conducting a study to six (6) wells in the area where Cantagallo took as a reference production and profitability of each of these. During the development of the project was implemented the concept of IPR curves, VLP, cash flow and internal rate of return (IRR), as part of an economic analysis. Based on the application of concepts earlier showed a technical and economic analysis of each of the wells where it shows the degree of profitability in the implementation of these artificial methods of lifting the wells tested. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/21256 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | BM | |
| dc.subject | BES | |
| dc.subject | IPR | |
| dc.subject | VLP | |
| dc.subject | Equipos | |
| dc.subject | Pozos | |
| dc.subject | Rentabilidad | |
| dc.subject | Drop Down. | |
| dc.subject.keyword | BM | |
| dc.subject.keyword | BES | |
| dc.subject.keyword | IPR | |
| dc.subject.keyword | VLP | |
| dc.subject.keyword | Equipment | |
| dc.subject.keyword | Wells | |
| dc.subject.keyword | Profitability | |
| dc.subject.keyword | Drop Down. | |
| dc.title | "evaluación del cambio de bombeo mecánico y bombeo electrosumergible en 6 pozos del campo cantagallo" | |
| dc.title.english | Change evaluation of mechanical pumping and electric submersible pumping in six wells of cantagallo field.* | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
