Publicación: Implementación del plan estratégico de Mantenimiento Centrado en Confiabilidad (RCM) para los centros de mecanizado de vidrio blindado de la planta de producción de AGP Colombia
| dc.contributor.advisor | Martinez Baquero, Javier Eduardo | |
| dc.contributor.author | Garcia Barrera, Heiner | |
| dc.contributor.author | Guevara Lopez, Fair Ernesto | |
| dc.date.accessioned | 2024-03-03T23:20:22Z | |
| dc.date.available | 2017 | |
| dc.date.available | 2024-03-03T23:20:22Z | |
| dc.date.created | 2017 | |
| dc.date.issued | 2017 | |
| dc.description.abstract | En este trabajo de monografía se propone un modelo de mantenimiento centrado en confiabilidad RCM con el fin de mejorar los niveles de disponibilidad y confiabilidad de los centros de mecanizado (Master 35, Master Edge y Top Master) los cuales se usan para el proceso de vidrio blindado, para la empresa AGP de Colombia S.A. Para el correcto desarrollo de la estrategia se identifican detalladamente los respectivos parámetros operacionales y condiciones de trabajo de los sistemas y subsistemas que conforman los centros mecanizados, lo que permite conocer específicamente su funcionalidad de los componentes que conformas los centros de mecanizado. Así mismo se realiza un análisis de criticidad teniendo en cuenta varios factores sobre los servicios que realizan los equipos, el valor técnico-económico, si la falla afecta el equipo en sí, al servicio, al operador y/o a la seguridad en general, la probabilidad de la falla (alta o baja) para lo cual se analiza el historial de fallas, la flexibilidad del equipo en el sistema, la dependencia logística de repuestos (si están disponibles nacionalmente o en el extranjero), la dependencia de la mano de obra, la facilidad de la reparación (Mantenibilidad). Después se realiza un análisis de modo y efecto de falla AMEF de los sistemas críticos para seleccionar y proponer las rutinas apropiadas de los programas de mantenimiento. La metodología RCM-II establece el desarrollo de actividades de forma sistemática, cuyo propósito es llegar a determinar una serie de tareas que permitan asegurar que el equipo analizado pueda continuar haciendo lo que el usuario quiere que haga en su contexto operacional actual. Finalmente, como resultado se proponen unos planes de mantenimiento con un listado de tareas a realizar por personal especializado y con una frecuencia específica, en donde la prioridad está en conservar componentes críticos y eliminar los malos actores. | |
| dc.description.abstractenglish | This monograph proposes a maintenance model focused on RCM reliability in order to improve the availability and reliability levels of the machining centers (Master 35, Master Edge and Top Master) which are used for the Process of armored glass, for the company AGP de Colombia SA For the correct development of the strategy, the respective operational parameters and working conditions of the systems and subsystems that make up the mechanized centers are identified in detail, which allows to know specifically its functionality of the components that conform the machined centers. In addition, a criticality analysis is carried out taking into account several factors regarding the services performed by the equipment, the technical-economic value, if the fault affects the equipment itself, the service, the operator and / or security in general, the Probability of failure (high or low) for which the history of failures, the flexibility of the equipment in the system, the logistic dependence of spare parts (if available nationally or abroad), the dependence of the workforce , The ease of repair (maintainability). An AMEF failure mode and effect analysis of critical systems is then performed to select and pro-pose appropriate maintenance program routines. The RCM-II methodology establishes the development of activities in a systematic way, whose purpose is to determine a series of tasks that allow to ensure that the analyzed team can continue doing what the user wants it to do in its current operational context. Finally, as a result, maintenance plans are proposed with a list of tasks to be performed by specialized personnel and with a specific frequency, where the priority is to conserve critical components and eliminate bad actors. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/36413 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Confiabilidad | |
| dc.subject | Disponibilidad | |
| dc.subject | Rcm | |
| dc.subject | Amef | |
| dc.subject | Rca | |
| dc.subject | Mtbf | |
| dc.subject | Mttr | |
| dc.subject | Mecanizado. | |
| dc.subject.keyword | Reliability | |
| dc.subject.keyword | Availability | |
| dc.subject.keyword | Rcm | |
| dc.subject.keyword | Amef | |
| dc.subject.keyword | Rca | |
| dc.subject.keyword | Mtbf | |
| dc.subject.keyword | Mttr And Machining Centers. | |
| dc.title | Implementación del plan estratégico de Mantenimiento Centrado en Confiabilidad (RCM) para los centros de mecanizado de vidrio blindado de la planta de producción de AGP Colombia | |
| dc.title.english | Implementation of the strategic plan of reliability-centrified maintenance (rcm) for shielded glass mechanization centers of the agp co-lombia production plant. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 82.36 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 231.2 KB
- Formato:
- Adobe Portable Document Format
