Publicación: Diseño de un modelo de cuadro balanceado de gestión aplicado al CPF-Florena, Equion Energía
| dc.contributor.advisor | Carreño Velasco, Wilson Raul | |
| dc.contributor.advisor | Blanco Reyes, Raul Danilo | |
| dc.contributor.advisor | Garcia Acevedo, Javier Alfonso | |
| dc.contributor.advisor | Barrera Cáceres, Héctor Armando | |
| dc.contributor.author | Calderon Moreno, Karen Jazveydy | |
| dc.contributor.author | Ovideo Avila, Laura Lucia | |
| dc.date.accessioned | 2024-03-03T23:55:23Z | |
| dc.date.available | 2018 | |
| dc.date.available | 2024-03-03T23:55:23Z | |
| dc.date.created | 2018 | |
| dc.date.issued | 2018 | |
| dc.description.abstract | El cuadro balanceado de gestión surge como una herramienta para el monitoreo y análisis de la información de una empresa, con el fin de aclarar y actualizar la estrategia, comunicar y vincular objetivos e indicadores estratégicos con metas a largo plazo, planificar y alinear las iniciativas estratégicas, conducir revisiones periódicas de rendimiento para aprender y determinar acciones de mejora que conduzcan al éxito y generación de valor de la empresa. Dentro de la operación Equión Energía Limited, la pérdida de barriles de aceite representa pérdidas económicas y de productividad, siendo un agravante el aumento de pérdidas no planeadas en el plan de producción de la operación del CPF-Floreña. Para el diseño del cuadro balanceado de gestión de esta unidad de negocio, se partió del análisis de los lineamientos estratégicos y el modelo de producción actual. Se procedió a definir los indicadores de medición enfocados al monitoreo de las pérdidas de producción no estipuladas en el plan establecido. La aplicación de la herramienta diseñada se realizó con información de producción de los meses de enero a julio del 2017. Posteriormente se analizaron los resultados obtenidos y establecieron acciones de mejora para mitigar los factores críticos identificados. Finalmente, se propone la implementación de las acciones de mejora identificadas y del cuadro balanceado de gestión diseñado, además de su continuo seguimiento. De esta forma se puede verificar si el plan de acción está dando resultado y si es necesario definir nuevos indicadores, contemplando la evolución hacia la meta. | |
| dc.description.abstractenglish | The balanced scorecard is a strategy performance management tool for the control and analysis of a company information, in order to clarify and update the strategy, communicate and link strategic objectives and indicators with long-term goals, plan and align strategic routes, drive the periodic performance conditions to learn and determine the improvement actions that lead to succeed and create value in a company. Among Equión Energy Limited operation, the loss of barrels of oil represents economic and productivity losses, as well as the increase of unplanned losses in the production plan of the CPF-Floreña operation has become a meaningful problem. For the design of the balanced scorecard of this business unit, the first step was the analysis of the strategic guidelines and the current production model. In the next place, definition of the key performance indicators focused on monitoring production losses not stipulated in the established plan. The application of the designed tool was carried out with production information from the months of January to July 2017. Subsequently, the results obtained were analyzed and improvement actions were established to mitigate the critical factors identified. Finally, it is proposed to implement the improvement actions identified and the balanced management plan designed, in addition to its continuous monitoring. In this way, it is easy to verify if the action plan is working and if it is necessary to define new indicators, contemplating the evolution towards the goal. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/37642 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Cuadro Balanceado De Gestión | |
| dc.subject | Estrategia | |
| dc.subject | Indicadores De Gestión | |
| dc.subject | Unidad De Negocio | |
| dc.subject | Pérdidas De Producción | |
| dc.subject | Centro De Producción Y Facilidades Cpf | |
| dc.subject | Epf | |
| dc.subject | Choke De Producción. | |
| dc.subject.keyword | Balanced Scorecard Bsc | |
| dc.subject.keyword | Strategy | |
| dc.subject.keyword | Key Performance Indicators | |
| dc.subject.keyword | Business Unit | |
| dc.subject.keyword | Production Losses | |
| dc.subject.keyword | Central Production Facility Cpf | |
| dc.subject.keyword | Early Production Facility Epf | |
| dc.subject.keyword | Production Choke. | |
| dc.title | Diseño de un modelo de cuadro balanceado de gestión aplicado al CPF-Florena, Equion Energía | |
| dc.title.english | Design of a of balanced scorecard model applied to cpf-floreña, equión energía*. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 432.03 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 203.11 KB
- Formato:
- Adobe Portable Document Format
