Publicación: Diseño de un plan de mantenimiento preventivo a equipos del proceso de coquización de la empresa C.I. Carbocoque S.A.
| dc.contributor.advisor | Silva Larrota, Jorge | |
| dc.contributor.author | Briceño Guevara, Juan Carlos | |
| dc.contributor.author | Torres Orjuela, Andres Felipe | |
| dc.date.accessioned | 2024-03-03T23:20:15Z | |
| dc.date.available | 2017 | |
| dc.date.available | 2024-03-03T23:20:15Z | |
| dc.date.created | 2017 | |
| dc.date.issued | 2017 | |
| dc.description.abstract | El mantenimiento preventivo es considerado una actividad planeada, su propósito es mantener los equipos, instalaciones o plantas operando a su máxima eficiencia de trabajo, evitando que se produzcan paradas forzosas o imprevistas.La característica principal de este mantenimiento es inspeccionar equipos y detectar las fallas en su fase inicial para controlarlas y corregirlas de manera oportuna. El presente trabajo desarrolla una propuesta para diseñar un plan de mantenimiento preventivo a equipos que impactan en las operaciones industriales del proceso de coquización de la empresa Carbocoque S.A. Se empezó por realizar un inventario y levantamiento técnico de información de equipos, (frecuencias de falla, hojas de vida, fichas técnicas y repuestas) con el objetivo de realizar un análisis de criticidad para identificar y jerarquizar equipos críticos con base en el concepto de análisis semicuantitativo del riesgo. ). Con este resultado se realiza una lista ponderada de equipos, desde el más crítico hasta el menos crítico, en función de su impacto global con el fin de priorizar las órdenes de trabajo, y políticas de mantenimiento. Posteriormente se realizo un estudio de análisis de modos de falla y efectos AMFE a los equipos críticos a nivel de subsistemas los cuales permitieron identificar fallas potenciales de diseño y proceso, con la intención de eliminar o minimizar los riesgos asociados con ellas.Por último se propone el diseño un plan de mantenimiento adecuado al contexto de operación en el cual se describen sus actividades, frecuencias, especialidad técnica requerida y tiempo de ejecución. | |
| dc.description.abstractenglish | Preventive maintenance is considered a planned activity its purpose is to keep the equipment, installations or plants operating at their maximum working efficiency, avoiding unforeseen or forced stops. The main characteristic of this maintenance is to inspect equipment and detect faults in Its initial phase to control and correct them in a timely manner. The present work develops a proposal to design a preventive maintenance plan for equipment that impacts on the industrial operations of the coking process of the company Carbocoque S.A. It began by carrying out an inventory and technical survey of equipment information (fault frequencies, resumes, technical data sheets and answers) in order to perform a criticality analysis to identify and prioritize critical equipment based on the concept of analysis Semi quantitative risk assessment. ). This results in a weighted list of equipment, from the most critical to the least critical, depending on its overall impact in order to prioritize work orders and maintenance policies. Later, a study of fault modes and AMFE effects analysis was carried out to critical subsystem level equipment which allowed identifying potential design and process failures, with the intention of eliminating or minimizing the risks associated with them. Lastly, the design of a maintenance plan appropriate to the operating context is described in which its activities, frequencies, technical expertise and execution time are described. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/36369 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Plan De Mantenimiento Preventivo | |
| dc.subject | Amef | |
| dc.subject | Criticidad | |
| dc.subject.keyword | Preventive Maintenance Plan | |
| dc.subject.keyword | Fmea | |
| dc.title | Diseño de un plan de mantenimiento preventivo a equipos del proceso de coquización de la empresa C.I. Carbocoque S.A. | |
| dc.title.english | Design of a maintenance plan preventive to equipment of the process of company coking c.i. carbocoque s.a. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 110.04 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 238.1 KB
- Formato:
- Adobe Portable Document Format
