Publicación: Optimización de los procesos de fraccionamiento en la planta de gas del centro a partir del uso de la herramienta hysys
| dc.contributor.advisor | Santos Santos, Nicolás | |
| dc.contributor.author | Pérez Plata, Henry Mauricio | |
| dc.contributor.author | Hernandez Tamayo, Watson Marcelo | |
| dc.date.accessioned | 2024-03-03T18:18:26Z | |
| dc.date.available | 2010 | |
| dc.date.available | 2024-03-03T18:18:26Z | |
| dc.date.created | 2010 | |
| dc.date.issued | 2010 | |
| dc.description.abstract | La Planta de Proceso de gas El Centro está localizada en el corregimiento El Centro, municipio de Barrancabermeja, departamento de Santander. Esta planta fue modificada en el año 1997 para ampliar su capacidad de tratamiento de 47 MMPCD a 100 MMPCD con el fin de poder cargar el gas que se esperaba produjera la asociación AMOCO-ECP en el campo Opón, no obstante, debido a fallas en el cálculo inicial de reservas recuperables la producción de gas del Campo Opón declinó desde los 47 MMPCD en el año 1997 a los 19 MMPCD en el mismo año. Debido a la diferencia existente entre las condiciones de diseño y las actuales condiciones operativas de la Planta de Gas El Centro, ocasionada principalmente por la declinación temprana de producción del Campo Opón, las variables operacionales no son las óptimas para el proceso, generándose una baja eficiencia en la recuperación de productos blancos así como un alto consumo de fluido absorbente, adicionalmente la entrega de gas con un contenido de agua alrededor de la 45 lb de agua por MMSCF de gas vendido han averiado la integridad del tubo que conduce el gas desde la Planta de Proceso hacia la GRB. En el presente estudio a partir del la simulación en el software Hysys se establecieron las alternativas posibles para maximizar el recobro de productos en las condiciones modeladas, buscando que los procesos fueran más eficientes, esto es, una mayor recuperación de productos blancos. Se simularon los sistemas de Glicol y de Refrigeración, además, se realizó un análisis de flujo de caja para la opción a recomendar. | |
| dc.description.abstractenglish | El Centro gas processing plant is located in the village El Centro, Barrancabermeja's municipality, department of Santander. This plant was modified in the year 1997 to extend its capacity of treatment from 47 MMPCD to 100 MMPCD in order to be able to load the gas that was hoped the association AMOCO-ECP in the Opon field, nevertheless, due to faults in the initial calculation of recoverable reservoir of gas, the gas production of the Opon Field declined from 47 MMPCD in the year 1997 to 19 MMPCD in the same year. Due to the existing difference between the designing conditions and the current operative conditions of the El Centro gas plant, caused principally by the early decline of production of the Opon Field, the operational variables are not the ideal ones for the process, a low efficiency being generated in the recovery of white products as well as a high consumption of absorbent fluid, additionally the gas delivery with a water content about 45 lb of water for MMSCF of sold gas have damaged the integrity of the pipe that leads the gas from the processing plant towards the GRB. In the current study from the simulation in the Hysys software the possible alternatives were established to maximize the products recovery in the modeling conditions, seeking that the processes were more efficient, this is, a better recovery of white products. The systems of Glycol and of Refrigeration were simulated; in addition, there was a cash flow analysis for recommended option. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Ingeniería del Gas | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/24639 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Especialización en Ingeniería del Gas | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Planta Proceso | |
| dc.subject | Hysys | |
| dc.subject | Glicol | |
| dc.subject | Refrigeración | |
| dc.subject | Flujo de Caja | |
| dc.subject.keyword | Processing Plant | |
| dc.subject.keyword | Hysys | |
| dc.subject.keyword | Glicol | |
| dc.subject.keyword | Refrigeration | |
| dc.subject.keyword | Cash Flow | |
| dc.title | Optimización de los procesos de fraccionamiento en la planta de gas del centro a partir del uso de la herramienta hysys | |
| dc.title.english | Optimization of fractionation process in el centro gas processing plant out of the use of the tool hysys | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 886.73 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 276.22 KB
- Formato:
- Adobe Portable Document Format
