Estudio del punto de conexión para una empresa del sector hidrocarburos, localizada en el municipio de orito, departamento del putumayo
dc.contributor.advisor | Vecino Arenas, Carlos Enrique | |
dc.contributor.author | Masmela Silva, Luis Antonio | |
dc.contributor.author | García Saavedra, Yuri Andrei | |
dc.date.accessioned | 2024-03-03T21:56:07Z | |
dc.date.available | 2015 | |
dc.date.available | 2024-03-03T21:56:07Z | |
dc.date.created | 2015 | |
dc.date.issued | 2015 | |
dc.description.abstract | El presente estudio pretende presentar el resultado de la evaluación técnica y económica para dos soluciones de mejoramiento del servicio de energía eléctrica de una empresa industrial del sector Hidrocarburos (EIH) por medio de la conexión de su carga alSistema Interconectado Nacional (SIN). Lo que incluye realizar los estudios eléctricos y financieros para una demanda proyectada de hasta 16MW en el horizonte de planeación. Las alternativas planteadas deben dar solución a los graves problemas de la confiabilidad y continuidad del servicio de energía y limitan la futura ampliación de cobertura de la empresa industrial de hidrocarburos (EIH). Las dos alternativas son: La primera opción analizada consiste en la conexión mediante un circuito sencillo a nivel de 115 kV, entre las subestaciones El Yarumo y la nueva Subestación eléctrica Orito. En la S/E Orito115 kV. La segunda opción consiste en mejorar la conexión existente a un nivel tensión de 34,5 kV, que como condición contempla el refuerzo con la instalación de un nuevo circuito y sus correspondientes grupos electrógenos, módulos de control y protección, para la nueva línea cuyo punto de conexión es la Subestación eléctrica El Yarumo. Luego de los diferentes análisis se verificó que las dos alternativas son viables técnica y financieramente. Representan un mejor desempeño eléctrico, dada la escasa conectividad y la imposibilidad de asumir la carga a nivel de 34,5 kV del sistema actual (que requiere asumir parte de la carga con generadores diésela este nivel de tensión). La alternativa recomendada será la conexión a 115 kV, por presentar mejores resultados técnicos y condiciones financieras más favorables. Esta debe ser presentada ante las entidades reguladoras y dueñas del sistema, la empresa Operadora de laRed OR (Electrificadora) y la Unidad de Planeación Minero Energética (UPME), quienes evalúan y aprueban dicha conexión. 2 | |
dc.description.abstractenglish | The present study show the result about of the technical and economic assessmentfor two possible solutions of improvement the electrical energy service for an Oil Industrial Company (OIC) that supply power can be to achieve with the connection of your load to NationalInterconnected System. This object includes realizing the electrical and financial studies for a last power projected demand of 16MW. The proposed alternatives must provide solution to the serious problems that come affect the reliability and continuity of the power supply and limit the future expansion of coverage by EIH. The two alternatives selected will be the following: The first analyzed option consists to make a simple electrical circuit at 115 kV, between the substations El Yarumo and the new Orito electrical Substation. On the S/E Orito115 kV. The second option consists of improving the existing connection at 34.5 kV of tension level, that contemplates to the reinforcement the installation with a new circuit and its corresponding generator sets, control modules and protection systems, for new line whose connection point is El Yarumoelectrical Substation. We find that the two different alternatives are viable technique and economically. They are much better than the actual connections and represent a better electrical performance, in comparison with to the little connectivity and the impossibility to upload charge at 34.5 kV level in the present system (that it requires to complete charge with the diesel generators for achieve the demand at this tension level). The recommended alternative will be the connection at 115 kV, because present better technical resultsand much favorable economic conditions. This must be presented before the regulating entities that are owners of the system, the Network Operator Company and the Planning Unit UPME, that evaluate and approve this connection. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Evaluación y Gerencia de Proyectos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/31862 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Evaluación y Gerencia de Proyectos | |
dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Confiabilidad | |
dc.subject | Calidad | |
dc.subject | Seguridad | |
dc.subject | S/E | |
dc.subject | Flujo De Carga | |
dc.subject | Estabilidad | |
dc.subject | Sistemas De Potencia. | |
dc.subject.keyword | Reliability | |
dc.subject.keyword | Quality | |
dc.subject.keyword | Security | |
dc.subject.keyword | Substation | |
dc.subject.keyword | Charge Flow | |
dc.subject.keyword | Stability | |
dc.subject.keyword | Power Systems. | |
dc.title | Estudio del punto de conexión para una empresa del sector hidrocarburos, localizada en el municipio de orito, departamento del putumayo | |
dc.title.english | Study on connecting points for an industrial company in the municipality of orito, department of putumayo | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 354.75 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 284.92 KB
- Format:
- Adobe Portable Document Format