Estudio técnico-financiero y diseño del sistema de distribución de gas LP por red para los corregimientos de Costilla y San Bernardo en el municipio de Pelaya-Cesar
dc.contributor.advisor | González Silva, Germán | |
dc.contributor.advisor | Pradilla Vargas, Luis Enrique | |
dc.contributor.author | González Guzmán, Carlos Andrés | |
dc.contributor.evaluator | Santos Santos, Nicolás | |
dc.contributor.evaluator | Cabarcas Simancas, Manuel | |
dc.date.accessioned | 2024-05-27T21:41:04Z | |
dc.date.available | 2024-05-27T21:41:04Z | |
dc.date.created | 2024-05-22 | |
dc.date.issued | 2024-05-22 | |
dc.description.abstract | Este trabajo realizó un estudio técnico, financiero y diseño de un sistema de distribución de gas LP por redes para los corregimientos de Costilla y San Bernardo en el municipio de Pelaya, Cesar. Con base en mejorar la calidad de vida de las personas, disminuir los daños a la salud y el medio ambiente que trae consigo la quema constante de CIAC y mitigar los riesgos de seguridad que se desprenden de la incorrecta manipulación y uso de cilindros de gas, se elaboró un proyecto para suministrar gas combustible por redes a 1.234 viviendas ocupadas o 4.402 habitantes en ambos centros poblados, con proyección de atención de demanda a 20 años. El estudio técnico centró la atención en definir el tipo de gas más conveniente para la región y la forma de comercialización con mejor costo eficiencia para el nuevo mercado relevante especial a atender dentro de las opciones ofrecidas en el mercado. El resultado dedujo que distribuir GLP almacenado en un tanque estacionario por corregimiento era la mejor opción. Se utilizó AutoCAD y Excel en el trazado y dimensionamiento de las líneas secundarias, acometidas, tanques estacionarios y redes individuales de gas, las primeras dos se calcularon mediante la fórmula de Mueller, los tanques según el método propuesto por Carmona y las redes a baja presión mediante la fórmula de Renouard lineal. El diseño permitió recoger información de entrada como cantidades de materiales, tuberías y cuantificación de trabajos de mano de obra civil para elaborar la evaluación financiera de la propuesta, a través del flujo de caja del proyecto, el estudio tarifario y energético de la propuesta y el comparativo energético. Por último, aprovechando los incentivos a este tipo de iniciativas para cumplir los objetivos del Plan de sustitución de leña del gobierno nacional, el proyecto desarrollado sirvió como base para la presentación al banco de proyectos de la UPME, con la finalidad de conseguir la cofinanciación del estado, vía recursos del Sistema General de Regalías. | |
dc.description.abstractenglish | This work carried out a technical, financial and design study of a LP gas distribution system by networks for the municipalities of Costilla and San Bernardo in the municipality of Pelaya, Cesar. With a view to improving people's quality of life, reducing the damage to health and the environment caused by the constant burning of CIAC and mitigating the safety risks arising from the improper handling and use of gas cylinders, a project was drawn up to supply fuel gas through networks to 1,234 occupied dwellings or 4,402 inhabitants in both population centres, with a projection of meeting demand over 20 years. The technical study focused on defining the most suitable type of gas for the region and the most cost-efficient way of marketing for the new special relevant market to be served within the options offered in the market. The result concluded that distributing LPG stored in a stationary tank by correction was the best option. AutoCAD and Excel were used in the drawing and dimensioning of the secondary lines, connected lines, stationary tanks and individual gas networks, the first two were calculated using the Mueller formula, the tanks according to the method proposed by Carmona and the low pressure networks according to the linear Renouard formula. The design allowed the collection of input information such as quantities of materials, pipelines and the quantification of civil labor to prepare the financial evaluation of the proposal, through the project cash flow, the tariff and energy study of the proposal and the energy comparison. Finally, taking advantage of the incentives for this type of initiative to meet the objectives of the National Government's Fuelwood Replacement Plan, the project developed served as the basis for the submission of UPME projects to the bank, with the aim of obtaining co-financing from the State, through resources from the General Royalties System. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero de Petróleos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/42639 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicoquímicas | |
dc.publisher.program | Ingeniería de Petróleos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Atribución-NoComercial 2.5 Colombia (CC BY-NC 2.5 CO) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Tanque estacionario | |
dc.subject | redes de distribución | |
dc.subject | gas licuado del petróleo | |
dc.subject | estudio tarifario | |
dc.subject | comparativo energético | |
dc.subject.keyword | Stationary tank | |
dc.subject.keyword | distribution networks | |
dc.subject.keyword | liquefied petroleum gas | |
dc.subject.keyword | tariff study | |
dc.subject.keyword | comparative energy | |
dc.title | Estudio técnico-financiero y diseño del sistema de distribución de gas LP por red para los corregimientos de Costilla y San Bernardo en el municipio de Pelaya-Cesar | |
dc.title.english | Technical-financial study and design of the LP gas distribution system by grid for the corregimements of Costilla and San Sernardo in the municipality of Pelaya-Cesar | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 90.57 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 241.85 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Documento.pdf
- Size:
- 10.62 MB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: