Estudio tecnico-economico para la maximización de carga de isobutano a la nueva planta de alquilación de la gerencia refinería de Barrancabermeja, Ecopetrol S.A.
dc.contributor.advisor | Barajas Ferreira, Crisóstomo | |
dc.contributor.author | Grass Luna, Luz Dary Milena | |
dc.date.accessioned | 2024-03-03T22:10:27Z | |
dc.date.available | 2015 | |
dc.date.available | 2024-03-03T22:10:27Z | |
dc.date.created | 2015 | |
dc.date.issued | 2015 | |
dc.description.abstract | La Nueva Planta de Alquilación (NPA) de la Gerencia Refinería de Barrancabermeja fue puesta en servicio en Noviembre del 2002 y fue diseñada para producir 4500 barriles por día de aquilato total, el cual se obtiene mediante la reacción de alquilación en la que reacciona olefinas con isobutano en presencia de ácido sulfúrico como catalizador. Este es un producto de alto valor comercial, no obstante actualmente la planta opera con un bajo factor de utilización, produciendo tan solo alrededor de 2000 barriles por día de alquilato total. La razón principal de ésta baja producción se debe a que las corrientes de carga que se establecieron en el diseño de la planta, no cumplen con los parámetros de calidad, específicamente por el bajo contenido de isobutano presente en éstas corrientes, el cual se requiere que sea alto en relación con el contenido de olefinas, para que se dé la reacción. El trabajo presentado en la práctica empresarial tuvo como propósito realizar un estudio técnico-económico de alternativas para maximizar la carga de isobutano a la NPA, aumentando la producción de alquilato para generar mayores beneficios económicos a la organización. Las alternativas planteadas fueron simuladas con el fin de identificar y seleccionar aquellas que entregan mayor potencial de isobutano, posteriormente se compararon los beneficios económicos de las alternativas mediante un análisis de riesgo financiero conocido como factor J. Obteniendo como resultado que la Alternativa 5 genera mayores ganancias con menor inversión y con mayor facilidad de implementación, por lo cual fue seleccionada para elaborar el documento de Ingeniería Conceptual, el cual fue entregado a la Coordinación de Ingeniería de Proceso para el posterior desarrollo de Ingeniería básica y de detalle. | |
dc.description.abstractenglish | The New Alkylation Plant (NAP) of Barrancabermeja Refinery was commissioned in November of 2002 and was designed to produce 4,500 barrels of total alkylate per day, which is obtained by the alkylation reaction where olefins react with isobutane in the presence of sulfuric acid as catalyst. This is a product of high commercial value, nevertheless currently the plant operates with a low utilization factor, producing only about 2,000 barrels of total alkylate per day. The main reason for this low production is that the load currents that were established in the design of the plant does not meet the quality parameters, specifically because of the low content of isobutane present in these streams, which is required to be high relative to the olefin content in the reaction zone. The paper submitted in business practice had the aim of implement a techno-economic study of alternatives to maximize the load of isobutane to the NPA, increasing the production of alkylate to generate greater economic benefits to the organization. The proposed alternatives are simulated to identify and select those which deliver the greatest potential of isobutane, afterwards the economic benefits of the alternatives were compared using an analysis of financial risk known as J factor. As a result was obtained that alternative 5 generates higher profits with less investment and ease of implementation, reason why it was chosen to elaborate the Conceptual Engineering document, which was given to this coordination for the further development of Basic and Detailed Engineering. 1 | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Químico | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/33029 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería Química | |
dc.publisher.school | Escuela de Ingeniería Química | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Alquilación | |
dc.subject | Isobutano | |
dc.subject | Olefinas | |
dc.subject | Glp | |
dc.subject | Alquilato. | |
dc.subject.keyword | Alkylation | |
dc.subject.keyword | Isobutane | |
dc.subject.keyword | Olefins | |
dc.subject.keyword | Gpl | |
dc.subject.keyword | Alkylate. | |
dc.title | Estudio tecnico-economico para la maximización de carga de isobutano a la nueva planta de alquilación de la gerencia refinería de Barrancabermeja, Ecopetrol S.A. | |
dc.title.english | Techno-economic study for maximization of isobutane load to the new alkylation plant of Barrancabermeja refinery management, Ecopetrol S.A. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 86.84 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 283.82 KB
- Format:
- Adobe Portable Document Format