Estudio de prefactibilidad operativo y económico de la implementación de una torre de vacío despojadora existente, para la recuperación de aceite liviano de ciclo (ALC) en el slurry producto de la unidad de craqueo catalítico en la refinería de Barrancabermeja
dc.contributor.advisor | Avellaneda Vargas, Fredy Augusto | |
dc.contributor.advisor | Meza Mendez, Carlos Alberto | |
dc.contributor.author | Piza Bermudez, Maria Alejandra | |
dc.date.accessioned | 2023-04-06T14:46:33Z | |
dc.date.available | 2023 | |
dc.date.available | 2023-04-06T14:46:33Z | |
dc.date.created | 2019 | |
dc.date.issued | 2019 | |
dc.description.abstract | Uno de los productos principales del departamento de Craqueo Catalítico III de la Refinería de Barrancabermeja de Ecopetrol S.A. y de los cuales se obtienen mayores ganancias es el Aceite Liviano de Ciclo (ALC), debido a que este hidrocarburo, además de utilizarse como diluyente o absorbente, también es material de mezcla para diésel, uso que deja un margen de ganancia importante para la unidad. Sin embargo, el slurry residuo de la columna principal de destilación contiene cantidades significativas de ALC, el cual no es separado de este residuo. Debido a lo anterior, esta mezcla se vende al mismo valor del slurry y genera un desperdicio de un compuesto valioso. Por esto se plantea un rediseño del sistema de fondos antiguo de la columna de destilación en el cual, además de recuperar la mayor cantidad de ALC posible también se logre disminuir el valor de la gravedad API del slurry producto de la unidad, teniendo en cuenta los activos que aún existen en planta. En este proyecto, a partir del rediseño, la simulación del sistema y sus equipos, de inspecciones realizadas en campo y de un análisis económico; se describen las estimaciones técnicas, operativas y económicas preliminares de la puesta en servicio del proceso, con el fin de encontrar un punto de operación favorable y evaluar la prefactibilidad económica del mismo. Se determinó que se debe aumentar la temperatura de cima a 260°C y mantener las condiciones originales de flujo de vapor, porcentaje de reflujo de cima y presión de vacío de la torre. Además, se deben comprar dos intercambiadores de calor, dos bombas y realizar el mantenimiento de la torre y el separador. Finalmente, la inversión inicial se recupera al séptimo mes, con ganancias anuales de aproximadamente $4,000,000 USD y un VPN al décimo año de $17,708,485 USD. * | |
dc.description.abstractenglish | One of the main products of the Catalytic Cracking III department of Barrancabermeja Refinery from Ecopetrol S.A. and from which the greater profits are obtained is the Light Cycle Oil (LCO), since this hydrocarbon, besides being used as thinner or absorbent, is also used as diesel blending material, characteristic that generate profit to the unit. Nevertheless, the residual slurry from the main distillation column contains considerable amount of LCO, which cannot be separated from this residue. Due to the lack of separation, the slurry-LCO mixture is sold at the same price as the pure slurry, generating a waste of valuable material. Therefore, a redesign of the bottom system of the distillation column is proposed, in order to recover the most LCO possible quantity and decrease the API gravity value of the slurry product, implementing equipment that is already own by the refinery. In this work, starting from the redesign, the system simulation and its equipment, plant inspections and an economic analysis; the preliminary estimates of the commissioning of the process are described, with the objective of finding the best operational conditions and obtaining the economic viability of this project. As a conclusion, the top temperature must be increased to 260°C and kept the original conditions of steam, reflux percentage on the top and the tower pressure vacuum. Also, it must be bought two heat exchangers, two pumps and do the tower and vessel maintenance. Finally, the initial investment is recovered in the seventh month, with annual profits around $4000,000 USD and obtaining a NPV of $17,708,485 USD within the next 10 years. * | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Químico | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/13747 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería Química | |
dc.publisher.school | Escuela de Ingeniería Química | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Aceite Liviano De Ciclo | |
dc.subject | Slurry | |
dc.subject | Destilación Al Vacío | |
dc.subject | Aspen Hysys | |
dc.subject | Análisis Económico. | |
dc.subject.keyword | Light Cycle Oil | |
dc.subject.keyword | Slurry | |
dc.subject.keyword | Vacuum Distillation | |
dc.subject.keyword | Aspen Hysys | |
dc.subject.keyword | Economic Analysis. | |
dc.title | Estudio de prefactibilidad operativo y económico de la implementación de una torre de vacío despojadora existente, para la recuperación de aceite liviano de ciclo (ALC) en el slurry producto de la unidad de craqueo catalítico en la refinería de Barrancabermeja | |
dc.title.english | Operational and economic pre-feasibility study of the implementation of an existent vacuum tower for the recovery of light cycle oil (lco) from slurry product of the catalytic cracking unit in Barrancabermeja refinery* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 485.17 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 296.82 KB
- Format:
- Adobe Portable Document Format