dc.description.abstractLas presiones anormales pueden causar problemas en la industria petrolera, especialmente durante el proceso de perforación. Dentro de un plan de perforación es muy importante generar un cálculo acertado de la presión de poro, para obtener una ventada de lodo apropiada, y así disminuir los costos y tiempos de proyectos de perforación. Para una estimación de presión más acertada se generara una metodología la cual, incluirá adicionalmente a los esfuerzos mecánicos, dos esfuerzos químicos, la cementación de cuarzo, y la deshidratación de arcillas, esto debido a que si no se tiene en cuenta causas adicionales que generen un aporte significativo se puede mal interpretar el cálculo de la presión, generando problemas. La metodología se implementara primero, desarrollando la caracterización de las propiedades petrofísicas de la cuenca a tener en cuenta, usando los registros, luego se identifican las zonas que tengan valores aptos en las características necesarias para generar sobrepresiones a partir de esfuerzo químicos en función de la profundidad y temperatura, continuando con la metodología se calcula la perdida de porosidad cuando hay cementación de cuarzo, generando un perfil de cambio de porosidad, el cual se comparara con uno desarrollado a partir de registros los cuales identifican las zonas de sub-compactación. Para la deshidratación de arcillas, se realiza el mismo modelamiento a través de la profundidad, y se genera el perfil para su respetiva comparación individual. Por último, se observa el aporte generado de los esfuerzos químicos en conjunto, lo cual permitirá hacer una evaluación global de la influencia que tienen estos esfuerzos en el cálculo de la presión de poro. Para terminar se muestra la presión generadas por cada uno de los esfuerzos químicos en comparación con el esfuerzo de sub-compactación, por separado y en conjunto, con el fin de saber qué valor es el que aportan estos esfuerzos.
dc.description.abstractenglishAbnormal pressures can cause problems in the oil industry, especially during the drilling. Inside a drilling plan is very important to generate an accurate calculation of pore pressure to obtain a proper mud window, and this reduce the cost and time of drilling projects. To estimate an exactly value of pressure generate a method which additional includes the commonly used mechanical forces, two chemical stress quartz cementation and clay dehydration was produced, this because if this is not taken into account additional causes that generate a significant contribution can show an incorrect value in the estimation in the calculate of the pressure, which creates operational problems during drilling. The methodology is implemented first, developing the characterization of the petrophysical properties of the basin to consider using the log then the areas with suitable values in the features needed to generate overpressure from chemical effort function are identified depth and temperature, which as time, continuing the methodology porosity loss is calculated when quartz cementation, generating a profile of change of porosity, which was compared to one developed from records which identify areas of compaction disequilibrium. For clay dehydration, the same modeling in time and temperature is performed by increasing the depth and generate a profile for individual comparison. Finally the contribution of chemicals stress is observed, which permit an evaluation of the influence of the stresses in the calculation of the pore pressure. Finally the pressure generated by each of chemical stress is compared with the overburden stress, separately and in combination, in order to know the value of the contribution.
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero de Petróleos
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/30136
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicoquímicas
dc.publisher.programIngeniería de Petróleos
dc.publisher.schoolEscuela de Ingeniería de Petróleos
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectPresión De Poro
dc.subjectEsfuerzos Químicos
dc.subjectCementación
dc.subjectDeshidratación.
dc.subject.keywordPore Pressure
dc.subject.keywordChemical Stresses
dc.subject.keywordCementation
dc.subject.keywordDehydration.
dc.titleMetodología para estimar la presión de poro e identificar el aporte a la generación de sobrepresión por esfuerzos químicos
dc.title.englishMethodology for estimating pore pressure and identify the contribution of the generation of overpressure by chemical stress
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
860.14 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
4.05 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
631.92 KB
Format:
Adobe Portable Document Format