Selección de pozos para operaciones de Workover mediante análisis avanzados de producción en el Campo Provincia
dc.contributor.advisor | Ordoñez Rodríguez, Aníbal | |
dc.contributor.advisor | Castillo, German | |
dc.contributor.author | Sánchez Picón, Andrea Camila | |
dc.contributor.author | Caviedes Galindo, Marcela | |
dc.date.accessioned | 2024-03-03T18:37:35Z | |
dc.date.available | 2011 | |
dc.date.available | 2024-03-03T18:37:35Z | |
dc.date.created | 2011 | |
dc.date.issued | 2011 | |
dc.description.abstract | Este trabajo presenta la aplicación de un enfoque metodológico tipo análisis de ingeniería al Campo Provincia ubicado en el Departamento de Santander, lo cual permitió la identificación y selección de pozos candidatos para trabajos de reacondicionamiento, generando una matriz de resultados en la cual se logró integrar todos los procesos realizados arrojando como candidatos a trabajos de Workover 12 pozos de la arena N . La principal ventaja del enfoque es que permite obtener resultados en tiempos relativamente cortos comparados con otros estudios. El análisis de procesos de ingeniería se fundamenta en la aplicación de protocolos derivados de la combinación de herramientas disponibles en OFM y otras aplicaciones computacionales. Estos procesos permiten la evaluación del desempeño del yacimiento. El presente documento consta de seis capítulos donde se explican los pasos que se desarrollaron, la metodología de integración, y los procesos de análisis usado para la identificación de los trabajos de reacondicionamiento. El primero de estos proporciona generalidades del campo y una caracterización de su geología estructural. El segundo capítulo explica la metodología aplicada en el proyecto. El siguiente capítulo describe el desarrollo de la metodología en el presente trabajo. En el cuarto capítulo se estudia el desarrollo de todos los procesos generados y se evalúan los resultados obtenidos. Por último en el quinto y sexto capítulo se mencionan las recomendaciones y conclusiones con la finalidad de mejorar la calidad de la evaluación mediante la consolidación de fortalezas y reducción de errores. | |
dc.description.abstractenglish | This paper presents the application of such a methodological approach engineering analysis to the Provincia field located in the Departmen of Santander, which allowed the identification and selection of wells candidates for Workovers, generating a matrix results which were able to integrate all processes performed candidates showing as 12 wells workovers N sand. The main advantage of the approach is that allow to get results in short relatively time compared with other studies. The analysis of engineering processes based on the application of protocols derived from the combination of tools available on OFM and other computer applications. These processes allow the evaluation of reservoir performance. This document consists of six chapters which detail the steps that were developed, the integration methodology, and analysis processes used for identification of Workover. The first of these fives an overview of the field and a characterization of structural geology. The second chapter explains the methodology used in the project. The next chapter describes the development of the methodology in this work. In the fourth chapter studies the development of all the processes generated and evaluated the results. Finally in the fifth and sixth chapters refers to the recommendations and conclusions with the purpose to improve the quality of the evaluation through of the consolidation of strengths and reducing wrongs. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero de Petróleos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/25051 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería de Petróleos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | PASS “Performance Assessment and Surveillance System” | |
dc.subject.keyword | PASS “Performance Assessment and Surveillance System” | |
dc.title | Selección de pozos para operaciones de Workover mediante análisis avanzados de producción en el Campo Provincia | |
dc.title.english | Selection of well for workover operations through production advanced analysis in the provincia field | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 937.46 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 793.58 KB
- Format:
- Adobe Portable Document Format