Estudio comparativo gestión de integridad mecánica de los ductos a cargo del departamento o&m norte-vit de Ecopetrol S.A. años 2015-2016
dc.contributor.advisor | Mujica Rancery, Lais | |
dc.contributor.author | Rocha Gonzalez, Daniel Armando | |
dc.date.accessioned | 2024-03-03T23:35:28Z | |
dc.date.available | 2017 | |
dc.date.available | 2024-03-03T23:35:28Z | |
dc.date.created | 2017 | |
dc.date.issued | 2017 | |
dc.description.abstract | La implementación de un modelo de gestión de integridad mecánica de ductos, como parte del desarrollo de un modelo de valoración de riesgos, tiene como objetivo asegurar la mitigación de las amenazas identificadas en sistemas de tuberías, reducir impactos directos o indirectos en áreas de alta consecuencia y enfocar los recursos económicos, financieros, personal y equipos de manera asertiva. La presente monografía, presenta los planes de gestión de integridad ejecutados durante las vigencias 2015 y 2016, para cinco (5) sistemas de tubería que transportan hidrocarburos líquidos refinados y los resultados de las valoraciones de riesgos, de acuerdo con la información diligenciada en el programa virtual de valoración de riesgos (SAIT). Los planes de gestión de integridad se enfocaron a mitigar las amenazas identificadas para las tuberías, como por ejemplo corrosión, clima y fuerzas externas, soldadura y construcción, daños por terceros involuntarios, entre otras, mediante planes de mantenimiento preventivo, predictivos y correctivos. Los resultados obtenidos permitieron identificar los perfiles de riesgo para cada una de las tuberías por cada vigencia, realizar los cálculos para el tratamiento de riesgo y realizar un comparativo de los perfiles de riesgo de tubería por sistema y total, para cada una de las vigencias 2015, 2016, respectivamente. La ejecución de un plan de gestión de integridad mecánica de ductos, enfocado a reducir los niveles de riesgo, tan practico como sea razonablemente posible, le aseguran al operador que los recursos económicos, financieros, personal y equipos invertidos en la anualidad, sean direccionados correctamente para mitigar las amenazas específicas, identificadas en sus sistemas y salvaguardando los limites operacionales. El valor agregado de un plan de gestión del riesgo incluye socializar los resultados a la Gerencia del Negocio, para que determine metas e indicadores, presupuesto, directrices a implementar en la vigencia 2017 | |
dc.description.abstractenglish | The implementation of a management model of mechanical integrity for pipelines, as part of the development of a risk assessment model, to ensure the mitigation of threats identified in pipeline systems, reduce direct or indirect impacts in high consequence areas and focus the economic, financial, personnel and equipment assertively. This degree work presents the integrity management plans executed during the 2015 and 2016 periods for five (5) pipelines and the results of risk assessments, according to the information processed in the program Risk assessment (SAIT). Integrity management plans focused on mitigating identified threats for pipelines, such as corrosion, weather and external forces, welding and construction, third damage by unintentional parties, among others, through preventive, predictive and corrective maintenance plans. The results obtained allowed to identify the risk profiles for each of the pipelines for each validity, to carry out the calculations for the treatment of risk and to make a comparison of the pipe risk profiles by system and total, for each of the 2015-2016 terms, respectively. The execution of a management plan for integrity of pipelines, to reduce risk levels, as low as reasonably practical, assets the operator that the economic, financial, personnel and equipment invested in the annuality, are correctly addressed to mitigate the specific threats identified in their systems and safeguarding operational limits. The added value of a risk management plan, includes socializing the results to the Business Management, to determine goals and indicators, budget, guidelines to be implemented in 2017. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Integridad de Equipos y Ductos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/37567 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Especialización en Integridad de Equipos y Ductos | |
dc.publisher.school | Escuela de Ingeniería Metalúrgica y Ciencia de Materiales | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Riesgos | |
dc.subject | Integridad Mecanica | |
dc.subject | Sistemas De Transporte | |
dc.subject | Amenazas | |
dc.subject | Areas De Alta Consecuencia. | |
dc.subject.keyword | Risk | |
dc.subject.keyword | Mechanical Integrity | |
dc.subject.keyword | Pipelines | |
dc.subject.keyword | Threat | |
dc.subject.keyword | High Consecuences Areas. | |
dc.title | Estudio comparativo gestión de integridad mecánica de los ductos a cargo del departamento o&m norte-vit de Ecopetrol S.A. años 2015-2016 | |
dc.title.english | Comparative study for the mechanical integrity management for pipelines by the department o&m norte-vit of ecopetrol s.a. years 2015 - 2016 | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 122.21 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 156.27 KB
- Format:
- Adobe Portable Document Format