Desarrollo de plan de mantenimiento centrado en confiabilidad rcm para la atraccion splash del parque salitre magico
dc.contributor.advisor | Ortíz Plata, Daniel | |
dc.contributor.author | Guanumen Almanza, Jorge Isaias | |
dc.date.accessioned | 2023-04-05T12:04:09Z | |
dc.date.available | 2023 | |
dc.date.available | 2023-04-05T12:04:09Z | |
dc.date.created | 2019 | |
dc.date.issued | 2019 | |
dc.description.abstract | Esta monografía presenta el desarrollo de un plan de mantenimiento centrado en confiabilidad RCM para la atracción Splash del parque Salitre Mágico, como respuesta a la necesidad de garantizar el cumplimiento de los estándares de confiabilidad y seguridad requeridos en la industria de parques de diversiones para una atracción familiar con las características e historia de la atracción Splash. La aplicación de la metodología RCM en la atracción Splash pretende mejorar la confiabilidad operativa, optimizar recursos de mantenimiento y garantizar la seguridad de visitantes, empleados y equipos; todo lo anterior mediante la construcción de un plan de mantenimiento basado en el análisis modal de fallas y efectos para reemplazar el plan de mantenimiento actual basado únicamente en experiencias de otros equipos similares en el parque. Por lo anterior, este trabajo busca ser referente para el inicio del uso de la metodología RCM en todas las atracciones del parque Salitre Mágico. Para generar el plan de mantenimiento se realizó la recopilación de la información de los equipos que componen la atracción Splash, se realizó un análisis taxonómico y se definió el diagrama de frontera, posteriormente se realizó el análisis modal de fallas y efectos de falla definiendo tareas de inspección, cambio y monitoreo por condición, finalmente se creó el plan de mantenimiento y se consignó en nuevos formatos de desarrollo de tareas de mantenimiento temporizando las actividades en diarias, semanales, mensuales, trimestrales, anuales y bianuales. El resultado es comparado con los formatos de desarrollo de tareas usados actualmente y de inmediato se percibe mayor orden, menor tiempo y el uso de nuevas tecnologías para monitoreo. _______________________ * Monografía de grado ** Facultad de ingenierías Físico Mecánicas. Especialización en Gerencia de Mantenimiento. Director: Daniel Ortíz Plata | |
dc.description.abstractenglish | This paper presents the development of reliability centered maintenance plan for the Splash attraction of the Salitre Magico park, in response to the need to guarantee compliance with the reliability and safety standards required in the amusement park industry for a familiar attraction with the characteristics and history of the Splash. The application of the RCM methodology in the Splash attraction aims to improve operational reliability, optimize maintenance resources and guarantee the safety of visitors, employees and equipment; all of the above through the construction of a maintenance plan based on the modal analysis of failures and effects to replace the current maintenance plan based solely on experiences of other similar equipment in the park. Therefore, this work seeks to be a reference for the beginning of the use of the RCM methodology in all the attractions of the Salitre Mágico park. To generate the maintenance plan, the information of the equipment that compose the Splash attraction was compiled, a taxonomic analysis was carried out and the boundary diagram was defined, afterwards the modal analysis of failures and failure effects was defined defining tasks of inspection, change and monitoring by condition, the maintenance plan was finally created and consigned in new formats for the development of maintenance tasks, timing the daily, weekly, monthly, quarterly, annual and bi-annual activities. The result is compared with the development formats of tasks currently used and immediately is perceived more order, less time and the use of new technologies for monitoring. _______________________ * Monograph ** Physical Mechanical Faculty. Maintenance Management Specialization. Director: Daniel Ortiz Plata | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/12874 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Parque De Atracciones | |
dc.subject | Montaña Rusa | |
dc.subject | Rcm | |
dc.subject | Modo De Falla | |
dc.subject | Efectos De Falla | |
dc.subject | Mantenimiento | |
dc.subject.keyword | Amusement Park | |
dc.subject.keyword | Roller Coaster | |
dc.subject.keyword | Rcm | |
dc.subject.keyword | Failure Modes | |
dc.subject.keyword | Failure Effects | |
dc.subject.keyword | Maintenance | |
dc.title | Desarrollo de plan de mantenimiento centrado en confiabilidad rcm para la atraccion splash del parque salitre magico | |
dc.title.english | Development of reliability centered maintenance plan for the splash attraction of the salitre magico park | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 116.1 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 83.15 KB
- Format:
- Adobe Portable Document Format