Propuesta de un plan de manejo ambiental para la planta de tratamiento y disposicion de lodos aceitosos generados en la zona de influencia de la gerencia refineria de barrancabermeja departamento de santander

dc.contributor.advisorEscalante Hernandez, Humberto
dc.contributor.authorTolosa Cetina, Edgar William
dc.date.accessioned2023-04-06T20:15:18Z
dc.date.available2023
dc.date.available2023-04-06T20:15:18Z
dc.date.created2019
dc.date.issued2019
dc.description.abstractEsta investigación tiene como propósito elaborar una propuesta para un plan de manejo ambiental, para la construcción de una planta de disposición final de tratamiento y disposición final de lodos aceitosos, generados en la zona de influencia de gerencia refinería de Barrancabermeja. La metodología exigió tres fases: pre-campo, campo y pos-campo, recopilando información primaria y secundaria del área donde se ubicará la posible PTAR, se inició haciendo la línea base ambiental, con datos como: topografía, fotografía aérea, hidrología, geología, componentes bióticos y abióticos, se determinó la actual intervención ambiental sin proyecto, del área de influencia tanto directa como indirecta, donde se localizará la posible planta. La siguiente fase realizada fue, el pre diseño y definición conceptual de la PTAR, estableciendo los procesos unitarios requeridos para, disminuir la contaminación física, química y biológica, generada por los lodos aceitosos. Conocido el proyecto este se implantó en el área y se procedió a realizar la evaluación de impactos con el uso de matrices cualitativas y cuantitativas, estas permitieron definir, cuáles serían los posibles impactos ambientales que se generarían en las fases de construcción, operación y clausura de la PTAR. A partir de esa valoración se definieron en el conjunto de medidas preventivas, de control, de reducción y mitigación requeridas para disminuir los impactos potenciales que generará el proyecto, dichas fueron el conjunto de acciones que incluyeron: capacitación del personal, dotación, equipamiento, construcción de infraestructura e implementación de tecnologías limpias, requeridas por cada componente ambiental afectado. Para garantizar los resultados esperados por la formulación del plan de manejo además se debe incluir, el plan de contingencias, el plan de riesgos y el plan de clausura.
dc.description.abstractenglishThis research has as a purpose the elaboration of a plan for the environmental management, for the construction of a sludge treatment plant and for the final disposition of oil mud generated in the zone of influence of the refinery management office in Barrancabermeja. The methodology demanded three phases: pre-field, field and post-field, gathering primary and secondary information in the area where the PTAR will possible be located. It started by drawing the environmental base line using data such as: topography, aerial photography, hydrology, geology, biotic and abiotic components, it was determined the current environmental intervention without a project in the influence area, both direct and indirect, where the possible plant will be located. The next phase was the pre-design and conceptual definition of the PTAR establishing the required unitary processes for the reduction of physical, chemical and biological contamination generated by the oil mudAs soon as the project was known, it was implanted in the area and the assessment of the impact began with the implementation of qualitative and quantitative matrices, these allowed to define which will be the possible environmental impact that will be generated during the phases of construction, operation and closure of the PTAR. Starting form this assessment, a set of preventive, control, reduction and mitigation rules were defined to reduce the potential impact that the project may generate. These rules were a set of actions which included: personnel training, endowment, equipment, infrastructure construction and clean technologies implementation required for each affected environmental component. To guarantee the expected results in the formulation of the management plan, a contingency, risk and closure plan must be included.
dc.description.degreelevelMaestría
dc.description.degreenameMagíster en Ingeniería Ambiental
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/13972
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicoquímicas
dc.publisher.programMaestría en Ingeniería Ambiental
dc.publisher.schoolEscuela de Ingeniería Química
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.coarhttp://purl.org/coar/access_right/c_abf2
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectLodos Aceitosos
dc.subjectEvaluación De Impacto
dc.subjectPlan De Manejo Ambiental
dc.subjectPlanta De Tratamiento De Lodos Aceitosos Ptar
dc.subjectLínea Base
dc.subject.keywordOil Mud
dc.subject.keywordImpact Assessment
dc.subject.keywordEnvironmental Management Plan
dc.subject.keywordSludge Treatment Plant Ptar
dc.subject.keywordBase Line.
dc.titlePropuesta de un plan de manejo ambiental para la planta de tratamiento y disposicion de lodos aceitosos generados en la zona de influencia de la gerencia refineria de barrancabermeja departamento de santander
dc.title.englishProposal of a plan for the environmental management for the sludge treatment plant and the oil mud generated in the zone of influence of the refinery management office in barrancabermeja, in the department of santander
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_bdcc
dc.type.localTesis/Trabajo de grado - Monografía - Maestría
dspace.entity.type
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
255.57 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
4.6 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
368.01 KB
Format:
Adobe Portable Document Format