Alternativas para la disminución del indicador SAIDI no programado del circuito El Copey de Caribemar de la Costa S.A.S. E.S.P.
dc.contributor.advisor | Duarte Gualdrón, César Antonio | |
dc.contributor.advisor | Quiroga Quiroga, Óscar Arnulfo | |
dc.contributor.author | Bohórquez Uparela, Yesica Paola | |
dc.contributor.evaluator | Ordóñez Plata, Gabriel | |
dc.contributor.evaluator | Chacón Velasco, Julio César | |
dc.date.accessioned | 2023-04-06T20:42:08Z | |
dc.date.available | 2023-04-06T20:42:08Z | |
dc.date.created | 2023-03-07 | |
dc.date.issued | 2023-03-07 | |
dc.description.abstract | En este trabajo de aplicación se establecen cuatro (4) alternativas para la disminución de las horas promedio de interrupción que ven los clientes conectados al circuito El Copey. Cada propuesta es presentada con su alcance y evaluada en impacto al indicador SAIDI propio no programado del circuito, costo, beneficio y relación beneficio/costo para establecer su viabilidad. Inicialmente se realiza el cálculo de los índices de confiabilidad del circuito como tasa de falla, tiempo medio para restauración y tiempo medio para reparación. Se obtiene como resultado los elementos y tramos del circuito con mayor índice de falla y que en consecuencia contribuyen más al indicador de calidad. Seguidamente se revisa a manera general el indicador de la empresa, del sector, profundizando en el análisis del indicador SAIDI propio no programado del circuito El Copey, ahondando en aporte por nivel de tensión, por elemento, por causa y por horario. De esto resultan cuatro (4) propuestas para mitigar el resultado obtenido. Todas las alternativas apuntan a mejorar la calidad del servicio que hoy presta la compañía para los usuarios conectados al circuito EL Copey ubicados en la zona sur del departamento del Cesar. Para la evaluación de viabilidad de las propuestas se tienen en cuenta aspectos principales como tasa de retorno de acuerdo a la regulación 215 de 2021 y vida útil de los activos con base en la resolución emitida por la Creg 015-2018. De esa forma se determinan las inversiones que requiere la red debido a su agotamiento a lo largo de los años, estado al que se ha llegado en parte por falta de inversión en la infraestructura propia. | |
dc.description.abstractenglish | In this application work, four (4) alternatives are presented to reduce the average hours of interruption for customers connected to the El Copey circuit. Each alternative is presented with its scope and evaluated in impact to the SAIDI indicator not programmed for the circuit, cost, benefit and benefit/cost ratio to establish its viability. Initially, the reliability indices of the circuit are calculated as the failure rate, average time for restoration and average time for repair, the elements and sections of the circuit with the highest failure rate are obtained as a result and consequently contribute more to the indicator of quality. Next, the indicator of the company, of the sector, is reviewed in a general way, delving into the analysis of the own unscheduled SAIDI indicator of the El Copey circuit, delving into the contribution by voltage level, by element, by cause and by schedule. Four (4) proposals resulted from this to reduce the result obtained. All the alternatives aim to improve the quality of service that the company currently provides for users connected to the EL Copey circuit located in the southern area of the department of Cesar. For the evaluation of the feasibility of the proposals, main aspects were considered such as the rate of return according to regulation 215 of 2021 and the useful life of the assets based on the resolution issued by the CREG 015-2018. In this way, investments required by the network were determined due to its depletion over the years, a state that has been reached in part due to lack of investment in its own infrastructure. | |
dc.description.degreelevel | Maestría | |
dc.description.degreename | Magíster en Sistemas de Distribución de Energía Eléctrica | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/14113 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Maestría en Sistemas de Distribución de Energía Eléctrica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Planificación | |
dc.subject | Mantenimiento | |
dc.subject | Indicadores | |
dc.subject | Calidad | |
dc.subject | Confiabilidad | |
dc.subject.keyword | Planning | |
dc.subject.keyword | Maintenance | |
dc.subject.keyword | Indicators | |
dc.subject.keyword | Quality | |
dc.subject.keyword | Reliability | |
dc.title | Alternativas para la disminución del indicador SAIDI no programado del circuito El Copey de Caribemar de la Costa S.A.S. E.S.P. | |
dc.title.english | Alternatives for the Decrease of the Indicator SAIDI not Programmed of the Circuit the Copey of Caribemar de la Costa S.A.S. E.S.P. | |
dc.type.coar | http://purl.org/coar/resource_type/c_bdcc | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Maestría | |
dspace.entity.type |
Files
Original bundle
1 - 5 of 9
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 132.01 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Carta de confidencialidad.pdf
- Size:
- 235.43 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 292.35 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Anexo A. Base de datos.xlsx
- Size:
- 1.96 MB
- Format:
- Microsoft Excel XML
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: