Fases y estrategias de construcción para transporte de hidrocarburos
dc.contributor.advisor | Camargo Sarmiento, Faustino | |
dc.contributor.author | Vega Peña, Didier Augusto | |
dc.date.accessioned | 2024-03-03T19:40:58Z | |
dc.date.available | 2012 | |
dc.date.available | 2024-03-03T19:40:58Z | |
dc.date.created | 2012 | |
dc.date.issued | 2012 | |
dc.description.abstract | Para la construcción de un Gasoducto, oleoducto y cualquier línea de hidrocarburos debemos tener en cuenta las siguientes fases y/o etapas para poder construir un Proyecto: Ingeniería básica, conceptual y de detalle Estudio preliminar del posible trazado teniendo en cuenta factores como ambientales, sociales, climáticos, topografía del terreno, accidentes geográficos etc. Análisis económico y comparativo para el cálculo futurista de recuperación de la inversión. Localización y replanteo con su inventario forestal e hidrológico. Cálculo para determinar tipo de tubería requerida, diámetro, espesor, composición química y tipo de revestimiento dependiendo el suelo por donde va a quedar el trazado. Construcción del derecho de vía retirando la capa vegetal y evitando que se contamine con material proveniente de excavación. Paralelamente se adquiere la tubería, se debe estar presente en el momento de fabricación para presenciar pruebas mecánicas, químicas y físicas que se debe realizar según Normas Internacionales. Obras de geotecnia preliminar como trinchos, gaviones, alcantarillas etc. con el fin de realizar transporte, tendido y doblado de tubería. Soldadura ya sea automática, manual, la que haya sido calificada previamente habiendo calificado el procedimiento de soldadura y calificación de soldadores. Procedimiento de limpieza y sandblasting de tubería para posterior aplicación de revestimiento ya sea en el cuerpo de la tubería o en juntas de soldadura realizando pruebas de calidad correspondientes. Actividad de zanjado a profundidad adecuada dependiendo del diámetro de la tubería utilizada y tipo de terreno. Bajado y pretapado de tubería, luego limpieza interna y calibración de tubería, procedemos con pruebas hidrostáticas con agua y verificar la hermeticidad de tubería y sanidad de soldaduras. Proceso de secado y conexión final de pozos, estaciones de recibo y despacho. | |
dc.description.abstractenglish | For the construction of a pipeline, pipeline and oil any line we must consider the following phases and / or steps to build a Project: Basic engineering, conceptual and detailed. Preliminary study of the possible route taking into account factors such as environmental, social, climate, topography, geographical features and so on. Economic analysis and comparative futuristic calculating return on investment. Location and setting out its forestry and hydrological inventory. Calculation to determine required pipe type, diameter, thickness, chemical composition and type of coating depending on the soil where it will be the path. Construction of right of way by removing the topsoil and avoiding contamination with material from excavation. Parallel line is acquired; it must be present at the time of manufacture to witness mechanical testing, chemical and physical to be performed according to International Standards. Preliminary geotechnical works as trinchos, gabions, sewers etc. in order to perform transport, laying and pipebending. Welding either automatic, manual, which has been described previously having qualified welding procedure and qualification of welders. Procedure for cleaning and sandblasting of pipe for subsequent application of coating either in the body of the pipe or by testing solder joints corresponding quality. Latest resolved to appropriate depth depending on the diameter of the pipe used and terrain. Downloaded and pretapado pipe, then internal cleaning and calibration of pipe, proceed with hydrostatic testing with water and check the tightness of pipe welding and health. The process of drying and final connection of wells, receipt and delivery stations. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Ingeniería del Gas | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/27799 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Especialización en Ingeniería del Gas | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Trazado | |
dc.subject | Oleoductos | |
dc.subject | Gasoductos | |
dc.subject | Construcción | |
dc.subject | Etapas | |
dc.subject | licencia | |
dc.subject | soldadura. | |
dc.subject.keyword | Drawing | |
dc.subject.keyword | Pipelines | |
dc.subject.keyword | Construction stages | |
dc.subject.keyword | License | |
dc.subject.keyword | Welding | |
dc.title | Fases y estrategias de construcción para transporte de hidrocarburos | |
dc.title.english | Construction steps and strategies fortransportation of oil | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 391.67 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 102.92 KB
- Format:
- Adobe Portable Document Format