Publicación: Estudio de factibilidad en la implementación de un sistema fotovoltaico off-grid que suministre electricidad e iluminación para “el bosque” en la Universidad Industrial de Santander.
| dc.contributor.advisor | Rincon Saravia, Rolando Andres | |
| dc.contributor.advisor | Ordoñez Plata, Gabriel | |
| dc.contributor.author | Reatiga Mendoza, Luis Alejandro | |
| dc.contributor.author | Segovia Castellanos, Kevin Andres | |
| dc.contributor.evaluator | Rey Lopez, Juan Manuel | |
| dc.contributor.evaluator | Mantilla Villalobos, Maria Alejandra | |
| dc.date.accessioned | 2025-11-18T15:41:42Z | |
| dc.date.available | 2025-11-18T15:41:42Z | |
| dc.date.created | 2025-11-04 | |
| dc.date.issued | 2025-11-04 | |
| dc.description.abstract | El presente proyecto tiene como finalidad evaluar la factibilidad de implementar un sistema fotovoltaico off-grid en el sector denominado “el bosque” de la Universidad Industrial de Santander. El principal desafío identificado corresponde a la densa cobertura arbórea y la vegetación circundante, que generan sombras constantes sobre los paneles solares, reduciendo la captación de radiación y limitando la producción de energía. Desde una perspectiva social y educativa, la carencia de suministro eléctrico y la deficiente iluminación han convertido este espacio en un lugar subutilizado e, incluso, inadecuado para la comunidad universitaria. Estas limitaciones afectan el desarrollo de actividades académicas y recreativas, además de comprometer la seguridad de los usuarios. Durante el estudio se identificaron las zonas con radiación solar, lo que permitió reubicar los bancos de estudio y diseñar tres propuestas de sistemas fotovoltaicos off-grid orientadas a energizar “el bosque” y a cubrir su iluminación general. Dichos diseños fueron simulados en el software PVSYST, obteniéndose una fracción solar (SF) del 100 % y pérdidas por sombreado inferiores al 3 %, lo que evidencia independencia total de la red y un aprovechamiento eficiente del recurso solar. Asimismo, se desarrolló un análisis de viabilidad técnica, económica, social y ambiental, que ofrece una base sólida para considerar la implementación de este tipo de sistemas tanto en el campus universitario como en otros entornos naturales, promoviendo un modelo energético sostenible y respetuoso con el medio ambiente. Sin embargo, se determinó que el principal impacto asociado corresponde al elevado costo de instalación, lo que limita su aplicación práctica y refuerza su orientación hacia un propósito educativo dentro de la universidad. | |
| dc.description.abstractenglish | This project aims to evaluate the feasibility of implementing an off-grid photovoltaic system in the area known as "el bosque" (The Forest) at the Industrial University of Santander. The main challenge identified is the dense tree cover and surrounding vegetation, which constantly cast shadows on the solar panels, reducing solar radiation capture and limiting energy production. From a social and educational perspective, the lack of electricity and inadequate lighting have made this space underutilized and even unsuitable for the university community. These limitations affect the development of academic and recreational activities, as well as compromising user safety. During the study, areas with the highest solar radiation were identified, allowing for the relocation of study benches and the design of three off-grid photovoltaic system proposals to power "el bosque" and provide general lighting. These designs were simulated using PVSYST software, resulting in a solar fraction (SF) of 100% and shading losses of less than 3%, demonstrating complete grid independence and efficient solar resource utilization. A technical, economic, social, and environmental feasibility analysis was also conducted, providing a solid basis for considering the implementation of this type of system both on the university campus and in other natural environments, promoting a sustainable and environmentally friendly energy model. However, the main impact identified is the high installation cost, which limits its practical application and reinforces its focus on an educational purpose within the university. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Electricista | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/46509 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
| dc.publisher.program | Ingeniería Eléctrica | |
| dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.title | Estudio de factibilidad en la implementación de un sistema fotovoltaico off-grid que suministre electricidad e iluminación para “el bosque” en la Universidad Industrial de Santander. | |
| dc.title.english | Feasibility study for the implementation of an off-grid photovoltaic system to supply electricity and lighting for "the forest" at the Industrial University of Santander. | |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 4 de 4
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 220.94 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 268.16 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Documento.pdf
- Tamaño:
- 1014.91 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.17 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción:
