Publicación: Desarrollo de una estrategia de mantenimiento centrado en confiabilidad (RCM) para la flota de equipos perforación de túneles mineros y viales tipo Jumbo Epiroc Boomer S1D en la constructora ESTYMA S.A.
| dc.contributor.advisor | Gómez López, Juan Luciano | |
| dc.contributor.author | Barrera Carreño, Carlos Fernando | |
| dc.contributor.evaluator | González Estrada, Octavio Andrés | |
| dc.date.accessioned | 2025-11-14T19:42:03Z | |
| dc.date.available | 2025-11-14T19:42:03Z | |
| dc.date.created | 2025-11-07 | |
| dc.date.issued | 2025-11-07 | |
| dc.description.abstract | La gestión eficiente del mantenimiento en equipos de perforación ha sido un factor determinante para garantizar la productividad, la seguridad y la sostenibilidad en proyectos mineros y viales. En esta monografía se ha desarrollado una estrategia de mantenimiento centrada en confiabilidad (RCM) aplicada a la flota de equipos Jumbo Epiroc Boomer S1D de la empresa ESTYMA S.A., con el propósito de optimizar la disponibilidad operacional y reducir los costos asociados a fallas no planificadas. El diagnóstico inicial ha evidenciado que la gestión tradicional basada en mantenimiento preventivo y correctivo ha resultado insuficiente para responder a las exigencias actuales de la operación. Por ello, se ha implementado un análisis de criticidad y un estudio FMEA en los sistemas de perforación, hidráulico, aire-agua y eléctrico, identificando las fallas más relevantes y priorizando las acciones de control. Como resultado, se ha diseñado un plan de mantenimiento estructurado bajo los lineamientos del RCM, que ha incorporado tareas preventivas, predictivas y de monitoreo de condición, alineadas con normativas internacionales como SAE JA1011, SAE JA1012, IEC 60300-3-11 e ISO 55000. La aplicación de este enfoque ha demostrado beneficios significativos: aumento de la confiabilidad y disponibilidad, mayor seguridad para los trabajadores, reducción de impactos ambientales y optimización de los costos de mantenimiento, con ahorros estimados entre un 27% y un 86% según el sistema analizado. En conclusión, la estrategia RCM ha representado una herramienta viable y efectiva que, aplicada a los equipos de perforación, ha fortalecido la competitividad de la empresa en el sector minero y vial, asegurando operaciones más seguras, sostenibles y eficientes a mediano y largo plazo. | |
| dc.description.abstractenglish | Efficient maintenance management in drilling equipment has been a determining factor in ensuring productivity, safety, and sustainability in mining and tunneling projects. In this monograph, a Reliability-Centered Maintenance (RCM) strategy has been developed and applied to the fleet of Jumbo Epiroc Boomer S1D equipment at ESTYMA S.A., with the purpose of optimizing operational availability and reducing costs associated with unplanned failures. The initial diagnosis has shown that traditional management based mainly on preventive and corrective maintenance has proven insufficient to meet current operational demands. Therefore, a criticality analysis and a Failure Modes and Effects Analysis (FMEA) have been implemented in the drilling, hydraulic, air-water, and electrical systems, identifying the most relevant failures and prioritizing control actions. As a result, a maintenance plan has been designed under the guidelines of RCM, incorporating preventive, predictive, and condition-monitoring tasks, aligned with international standards such as SAE JA1011, SAE JA1012, IEC 60300-3-11, and ISO 55000. The application of this approach has demonstrated significant benefits: increased reliability and availability, improved worker safety, reduced environmental impacts, and optimized maintenance costs, with estimated savings ranging from 27% to 86% depending on the system analyzed. In conclusion, the RCM strategy has represented a viable and effective tool which, when applied to drilling equipment, has strengthened the company’s competitiveness in the mining and tunneling sector, ensuring safer, more sustainable, and more efficient operations in the medium and long term. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/46475 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
| dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
| dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | |
| dc.subject | Confiabilidad | |
| dc.subject | Perforadora | |
| dc.subject | Mantenimiento | |
| dc.subject.keyword | Reliability | |
| dc.subject.keyword | Drill | |
| dc.subject.keyword | Maintenance | |
| dc.title | Desarrollo de una estrategia de mantenimiento centrado en confiabilidad (RCM) para la flota de equipos perforación de túneles mineros y viales tipo Jumbo Epiroc Boomer S1D en la constructora ESTYMA S.A. | |
| dc.title.english | Development of a Reliability-Centered Maintenance (RCM) Strategy for the Fleet of Tunnel Mining and Road Drilling Equipment, Jumbo Epiroc Boomer S1D, at ESTYMA S.A. | |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Especialización | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 4 de 4
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 255.25 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 211.22 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.17 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción:
