Publicación: Evaluación integral de procesos operativos para la planta de gas Campo Mágico: Estrategias de adaptación a nuevos retos operacionales en Pueblo Nuevo, Córdoba
| dc.contributor.advisor | Roa Duarte, Carlos Efraín | |
| dc.contributor.author | Barrios Mejía, Iván Javier | |
| dc.contributor.evaluator | Cabarcas Simancas, Manuel Enrique | |
| dc.date.accessioned | 2025-12-04T20:56:28Z | |
| dc.date.available | 2025-12-04T20:56:28Z | |
| dc.date.created | 2024-09-05 | |
| dc.date.issued | 2024-09-05 | |
| dc.description.abstract | La planta de procesos de gas ubicada en el corregimiento El Congo del municipio de Pueblo Nuevo Córdoba, inició operaciones el 2 de noviembre de 2024 con una capacidad de tratamiento de 20 MMSCFD, producción proveniente de los Pozos Brujo 1x y Mágico 1X, cuyo gas esta caracterizado como un gas seco con un porcentaje de Metano de 99.13 %. Desde que se inició operaciones la variable de calidad Hc Dew Point para la venta del gas ha venido presentando valores por fuera de especificaciones Rut, lo cual ha generado que se rechace el gas por parte de la empresa dueña del gasoducto, que es la que tiene el contrato de transporte y venta del gas proveniente del campo Mágico. Esta serie de dificultades se presentan rutinariamente y cada vez con más frecuencia debido a las condiciones operacionales establecidas en el diseño original de la planta y la capacidad productiva cambiante de sus pozos, por lo que fue necesario parar operaciones en diciembre de 2024. Por otra parte, para el transcurso del año 2025 la empresa NG Energy espera terminar de construir todas las facilidades de la planta de proceso para tener una capacidad total de tratamiento de 50 MMSCFD, ya que se tiene proyectado un aumento de producción con la perforación de nuevos pozos productivos. Con el propósito de plantear una solución para que el gas de ventas cumpla con las condiciones de calidad establecidas en el Rut, mediante el desarrollo de este trabajo se realizará una evaluación de los procesos y tecnologías con la que cuenta la planta de tratamiento de gas Campo Mágico y las condiciones operacionales que influyen en su funcionamiento. Además, se realizará un análisis técnico y económico de las diferentes alternativas que se pueden implementar y dar solución a las condiciones que están afectando el proceso y seguido a esto, hacer un estudio y preselección de la mejor alternativa con el fin de encontrar la que más se ajuste a la capacidad y condiciones de la planta. | |
| dc.description.abstractenglish | The Gas Processing Plant located in the "corregimiento" (district) of El Congo in the municipality of Pueblo Nuevo, Córdoba, began operations on November 2, 2024, with a treatment capacity of 20 MMSCFD, production sourced from the Brujo 1x and Mágico 1X wells. This gas is characterized as a dry gas with a Methane percentage of 99.13%. Since operations began, the sales gas quality variable, Hc Dew Point, has been consistently showing values outside the RUT specifications, which has led to the gas being rejected by the company that owns the pipeline, which holds the contract for the transportation and sale of the gas from the Campo Mágico field. This series of difficulties occur routinely and with increasing frequency due to the operational conditions established in the plant's original design and the changing productive capacity of its wells, necessitating a halt in operations in December 2024. Furthermore, during the course of 2025, the company NG Energy expects to finish constructing all the process plant facilities to achieve a total treatment capacity of 50 MMSCFD, as an increase in production is projected with the drilling of new productive wells. With the purpose of proposing a solution so that the sales gas meets the quality conditions established in the RUT, this work will develop an evaluation of the processes and technologies available at the Campo Mágico gas treatment plant and the operational conditions that influence its performance. Additionally, a technical and economic analysis of the different alternatives that can be implemented to solve the conditions affecting the process will be carried out, followed by a study and preselection of the best alternative in order to find the one that best suits the plant's capacity and conditions. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Ingeniería del Gas | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Escuela de Ingeniería de Petróleos | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/46821 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingeníerias Fisicoquímicas | |
| dc.publisher.program | Especialización en Ingeniería del Gas | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
| dc.subject | Hc Dew Point | |
| dc.subject | Recuperación de LGN | |
| dc.subject | Válvula Joule Thomson | |
| dc.subject | Refrigeración Mecánica | |
| dc.subject.keyword | HC Dew Point | |
| dc.subject.keyword | NGL Recovery | |
| dc.subject.keyword | Joule-Thomson Valve | |
| dc.subject.keyword | Mechanical Refrigeration | |
| dc.title | Evaluación integral de procesos operativos para la planta de gas Campo Mágico: Estrategias de adaptación a nuevos retos operacionales en Pueblo Nuevo, Córdoba | |
| dc.title.english | Comprehensive Evaluation Of Operational Processes For The Campo Mágico Gas Plant: Adaptation Strategies To New Operational Challenges In Pueblo Nuevo, Córdoba | |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Especialización | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 201.98 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 331.9 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.18 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción: