Publicación: Monitoreo en tiempo real de operaciones de intervención a pozo: una solución rentable para aumentar la eficiencia operativa y reducir costos.
| dc.contributor.advisor | Zárate Zárate, Germán | |
| dc.contributor.author | Velasco Escudero, Alexander | |
| dc.contributor.evaluator | Guerra Tarazona, Alba Rocio | |
| dc.contributor.evaluator | Ariza León, Emiliano | |
| dc.date.accessioned | 2026-09-03T17:41:30Z | |
| dc.date.created | 2026-09-02 | |
| dc.date.embargoEnd | 2026-09-02 | |
| dc.date.issued | 2026-09-02 | |
| dc.description.abstract | TÍTULO: MONITOREO EN TIEMPO REAL DE OPERACIONES DE INTERVENCIÓN A POZO: UNA SOLUCIÓN RENTABLE PARA AUMENTAR LA EFICIENCIA OPERATIVA Y REDUCIR COSTOS. AUTOR: ALEXANDER VELASCO ESCUDERO PALABRAS CLAVE: MONITOREO, TIEMPO, REAL, RTO, WITSML, OPTIMIZACION, OPERACIONES, SUBSUELO DESCRIPCIÓN: Este proyecto implementó un sistema de monitoreo en tiempo real para operaciones de intervención a pozo, demostrando su efectividad en la mejora de la eficiencia operativa y la reducción del tiempo no productivo (NPT). La adquisición continua de datos permitió medir y optimizar los tiempos de conexión STS, logrando reducciones individuales entre 0,07 y 1,12 minutos por conexión, equivalentes a mejoras entre el 4 % y el 42 %, con una reducción promedio del 18 % por intervención. Durante la fase piloto, que incluyó nueve operaciones, se registraron un total de 53 viajes de tubería y 8.419 conexiones, generando un ahorro total de 2.319 minutos (38,7 horas) y una reducción de costos estimada en 23.057 USD Además de los beneficios directos en costos, el proyecto generó valor indirecto reduciendo la producción diferida, con ahorros estimados en 223 barriles. El piloto se ejecutó con costos mínimos, utilizando software gratuito y la infraestructura existente, logrando un Retorno de la Inversión (ROI) del 118 %. Incluso bajo escenarios futuros que contemplan el uso de software propio o comercial, el retorno se mantiene positivo, lo que demuestra la escalabilidad y la sostenibilidad financiera del sistema. Asimismo, el monitoreo en tiempo real fortaleció la toma de decisiones operativas al permitir la detección temprana de incrementos en los tiempos STS, anomalías de presión, variaciones en la velocidad de viaje y patrones atípicos en los datos, facilitando la implementación de acciones correctivas oportunas y superando el enfoque tradicional basado en reportes diarios. Finalmente, el piloto estableció las bases para expandir el análisis hacia nuevos indicadores clave de desempeño (KPI), incluyendo velocidad de viaje, reducción de ILT, NPT, tiempos planos y optimización de parámetros, incrementando el valor del monitoreo en tiempo real como una herramienta confiable para la toma de decisiones estratégicas. Trabajo de grado Facultad de Ingenierías Fisicoquímicas. Escuela de Ingeniería de Petróleos. Maestría en Ingeniería de Petróleos y Gas, Énfasis en Gerencia y Economía de los Hidrocarburos Director: Germán Zárate Zárate. Magister en Administración de Negocios MBA. | |
| dc.description.abstractenglish | TITLE: REAL-TIME MONITORING OF WELL INTERVENTION OPERATIONS: A COST-EFFECTIVE SOLUTION TO INCREASE OPERATIONAL EFFICIENCY AND REDUCE COSTS AUTHOR: ALEXANDER VELASCO ESCUDERO KEY WORDS: MONITORING, REAL-TIME, RTO, WITSML, OPTIMIZATION, OPERATIONS, SUBSURFACE DESCRIPTION: This project implemented a real-time monitoring system for well interventions operations, demonstrating its effectiveness in improving operational efficiency and reducing non-productive time (NPT). Continuous data acquisition enabled the measurement and optimization of STS connection times, achieving individual reductions ranging from 0.07 to 1.12 min per connection, corresponding to performance improvements between 4% y 42%, with an average reduction of 18% per intervention. During the pilot phase, which included nine operations, 53 tubing runs and 8,419 connections were recorded, resulting in a total saving of 2,319 minutes (38.7 hours) and an estimated cost reduction of USD 23,057. In addition to direct cost benefits, the project generated indirect value by reducing deferred production, with estimated savings equivalent to approximately 223 barrels. The pilot was executed at minimal cost using free software and existing infrastructure, achieving a Return on Investment (ROI) of 118%. Even under future scenarios involving proprietary or commercial software, the return remains positive, demonstrating the scalability and financial sustainability of the system. Furthermore, real-time monitoring enhanced operational decision-making by enabling immediate detection of STS time increases, pressure anomalies, variations in travel speed, and atypical data patterns, facilitating timely corrective actions and surpassing the traditional approach based solely on daily reports. Finally, the pilot laid the groundwork to expand the analysis to additional operational KPIs, including travel speed, ILT reduction, NPT, flat times, and parameter optimization, increasing the potential value of real-time monitoring and providing a reliable tool for strategic decision-making. Master Thesis Faculty of Physical-Chemical Engineering, School of Petroleum Engineering. Master’s in Petroleum and Gas Engineering, Emphasis in Hydrocarbon Management and Economics. Director: Germán Zárate Zárate, MBA. | |
| dc.description.degreelevel | Maestría | |
| dc.description.degreename | Magíster en Ingeniería de Petróleos y Gas | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/48379 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Maestría en Ingeniería de Petróleos y Gas | |
| dc.publisher.program | Maestría en Ingeniería de Petróleos y Gas | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | https://creativecommons.org/licenses/by-nd/4.0/ | |
| dc.subject | MONITOREO | |
| dc.subject | TIEMPO | |
| dc.subject | REAL | |
| dc.subject | RTO | |
| dc.subject | WITSML | |
| dc.subject | OPTIMIZACION | |
| dc.subject | OPERACIONES | |
| dc.subject | SUBSUELO | |
| dc.subject.keyword | MONITORING | |
| dc.subject.keyword | REAL-TIME | |
| dc.subject.keyword | RTO | |
| dc.subject.keyword | WITSML | |
| dc.subject.keyword | OPTIMIZATION | |
| dc.subject.keyword | OPERATIONS | |
| dc.subject.keyword | SUBSURFACE | |
| dc.title | Monitoreo en tiempo real de operaciones de intervención a pozo: una solución rentable para aumentar la eficiencia operativa y reducir costos. | |
| dc.title.english | Real-time monitoring of well intervention operations: a cost-effective solution to increase operational efficiency and reduce costs | |
| dc.type.coar | http://purl.org/coar/resource_type/c_bdcc | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Maestría | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorizacion.pdf
- Tamaño:
- 200.8 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota del proyecto.pdf
- Tamaño:
- 100.58 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.17 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción:
