Publicación: Programación de la operación de un sistema eléctrico industrial de media tensión con generación distribuida conectado a red para atender criterios de confiabilidad ante contingencias
| dc.contributor.advisor | Quiroga Quiroga, Oscar Arnulfo | |
| dc.contributor.advisor | Duarte Gualdron, Cesar Antonio | |
| dc.contributor.author | Arbelaez Torres, Jonas | |
| dc.contributor.author | Fernandez Solano, Paula Camila | |
| dc.date.accessioned | 2024-03-03T23:22:51Z | |
| dc.date.available | 2017 | |
| dc.date.available | 2024-03-03T23:22:51Z | |
| dc.date.created | 2017 | |
| dc.date.issued | 2017 | |
| dc.description.abstract | El objetivo de este proyecto es evaluar distintas alternativas para la operación de un sistema industrial de 34,5 kV conectado a la red y que cuente con generación distribuida, considerando escenarios normales y de contingencia, tomando un caso de estudio. Para lograr este acometido, es necesario realizar un análisis de confiabilidad que permita determinar los elementos que están más propensos a fallar en un periodo de tiempo, lo que permite determinar el impacto que estas fallas producen en los puntos de carga teniendo en consideración las restricciones que impone el sistema como son: límites térmicos de las líneas, variación de la tensión en los barrajes y cargabilidad de los transformadores. Dado que los sistemas eléctricos son una pieza fundamental en la industria, se demanda que estos operen de forma eficiente, confiable y segura para mantener la continuidad en los procesos productivos. Por consiguiente, se hace necesario generar protocolos de operación que permitan responder de forma oportuna ante un número determinado contingencias de tipo (n-1) y (n-2) que se puedan presentar, garantizando la seguridad de las instalaciones y de los usuarios. El proyecto comprende las siguientes fases: la primera de ellas es el análisis de confiabilidad; la segunda es el análisis de flujos de carga que va de la mano con la tercera etapa que comprende el análisis de contingencias y por último se procede con la cuarta etapa que es realizar el procedimiento de operación ante fallas. | |
| dc.description.abstractenglish | This project aims to evaluate different alternatives for the operation of a 34.5 kV industrial system connected to the grid and with distributed generation, considering normal and contingency scenarios, taking a case study. In order to achieve this, it is necessary to perform a reliability analysis that allows to determine the elements that are most likely to fail in a period of time, which allows to determine the impact that these failures produce in the load points taking into account the restrictions that Imposes the system as: thermal limits of the lines, variation of the voltage in the barrages and loadability of the transformers. Since electrical systems are a fundamental part of the industry, they are required to operate efficiently, reliably and safely to maintain continuity in production processes. Consequently, it is necessary to generate operating protocols that allow responding in a timely manner to a number of contingencies of type (n-1) and (n-2) that can be presented, guaranteeing the safety of facilities and users. The project comprises the following phases: the first one is the reliability analysis; The second is the analysis of load flows that go hand in hand with the third stage that includes contingency analysis and finally proceed with the fourth stage that is to perform the procedure of operation in the event of failures. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Electricista | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/36684 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Eléctrica | |
| dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Confiabilidad | |
| dc.subject | Contingencias | |
| dc.subject | Generación Distribuida | |
| dc.subject | Operación Sistema Eléctrico | |
| dc.subject.keyword | Reliability | |
| dc.subject.keyword | Contingencies | |
| dc.subject.keyword | Distributed Generation | |
| dc.subject.keyword | Electrical System Operation | |
| dc.title | Programación de la operación de un sistema eléctrico industrial de media tensión con generación distribuida conectado a red para atender criterios de confiabilidad ante contingencias | |
| dc.title.english | Programming of the operation of the industrial power system of medium voltage with distributed generation connected to grid for attend reliability criteria in the event of contingencies | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 209.65 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 114.57 KB
- Formato:
- Adobe Portable Document Format