Publicación: Desarrollo de un panorama de riesgo de la estación separadora del campo escuela colorado tomando como base las normas api rp 580 y api 581
| dc.contributor.advisor | Uribe Pérez, Iván | |
| dc.contributor.author | Pérez Galán, Olga Lucía | |
| dc.contributor.author | Pérez Zambrano, Astrid | |
| dc.date.accessioned | 2024-03-03T17:01:47Z | |
| dc.date.available | 2008 | |
| dc.date.available | 2024-03-03T17:01:47Z | |
| dc.date.created | 2008 | |
| dc.date.issued | 2008 | |
| dc.description.abstract | El proyecto DESARROLLO DE UN PANORAMA DE RIESGO DE LA ESTACIÓN SEPARADORA DEL CAMPO ESCUELA COLORADO TOMANDO COMO BASE LAS NORMAS API-580 Y API RP-581 tiene como objeto determinar el nivel de riesgo, confiabilidad, criticidad e integridad de los equipos de la estación separadora, mediante la aplicación de la norma API-581(documento recurso base) y API- RP580 ( inspección basada en riesgo), con el apoyo de las normas API- 510(código de inspección de recipientes a presión: mantenimiento, inspección, clasificación, reparación y alteraciones), API- 570 (código de inspección para tubería: inspección, reparación, alteraciones y recalibración de sistema de tubería en servicio) y API- STD653 (inspección, reparación, alteraciones y reconstrucción de tanques) El desarrollo del panorama de riesgo incluye, determinación de los lazos de corrosión presentes en los equipos evaluados, nivel de criticidad que esta directamente relacionado con la probabilidad y la consecuencia de falla, factor de intervalo de confiabilidad, determinación de vida útil remanente, determinación del plan de inspección de acuerdo con los mecanismos de falla propuestos y ejecución de la inspección, donde las técnicas utilizadas son: ultrasonido en la determinación de medición de espesores e inspección visual; cumpliendo con el objetivo principal de la RBI se presentan recomendaciones donde se busca eliminar una serie de no conformidades con el fin de disminuir el nivel de riesgo actual de la estación separadora del campo escuela. | |
| dc.description.abstractenglish | The project DEVELOPMENT OF A RISK OVERVIEW OF THE SEPARATOR STATION SHOOL CAMP COLORADO TAKING AS A BASE THE API-580 AND API RP-581 RULES has like an objective determinate the risk level, reliability, and integrity of critical equipment from the separator station by the application of the API 581(Risk-Based Inspection Base Resource Document) and API-RP580 (Risk-Based Inspection) standard, with the support of the API-510 (Pressure Vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration), API- 570 (Piping Inspection Code: Inspection, repair, alteration and recalibration of piping system in service) and API-STD653(Tank Inspection, Repair, Alteration and Recontruction) rules. The development of the risk overview include, the determination of corrosion loops in the teams evaluated, level of criticality that is directly related to the probability and consequence of failure, Factor interval reliability, determination of the remaining useful life, determination of the inspection plan according to failure mechanism proposed and the inspection execution, where the techniques used are: ultrasound in the determining measurement of the thickness and visual inspection; fulfilling with the main objective of the RBI it presents recommendations which trying to eliminate a number of nonconformities in order to reduce the level of present risks in the separator station shool camp colorado. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Metalúrgico | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/20828 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería Metalúrgica | |
| dc.publisher.school | Escuela de Ingeniería Metalúrgica y Ciencia de Materiales | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | RBI | |
| dc.subject | Inspección | |
| dc.subject | Criticidad | |
| dc.subject | Confiabilidad. | |
| dc.subject.keyword | RBI | |
| dc.subject.keyword | Inspection | |
| dc.subject.keyword | Criticality | |
| dc.subject.keyword | Reliability. | |
| dc.title | Desarrollo de un panorama de riesgo de la estación separadora del campo escuela colorado tomando como base las normas api rp 580 y api 581 | |
| dc.title.english | Development of a risk overview of the separator station shool camp colorado taking as a base the api-580 and api rp-581 rules * | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
