Publicación: Mejoramiento de procesos de manufactura mediante la implementación de la metodología Lean Manufacturing en la planta Coca-Cola FEMSA – Bucaramanga.
| dc.contributor.advisor | Ortiz Pimiento, Néstor Raúl | |
| dc.contributor.author | Castellanos Castellanos, Leidy | |
| dc.contributor.evaluator | Lamos Diaz, Henry | |
| dc.contributor.evaluator | Sanabria Ruiz, Victor Alfonso | |
| dc.date.accessioned | 2024-02-29T20:42:46Z | |
| dc.date.available | 2024-02-29T20:42:46Z | |
| dc.date.created | 2024-02-07 | |
| dc.date.embargoEnd | 2024-02-07 | |
| dc.date.issued | 2024-02-07 | |
| dc.description.abstract | La presente entrega documental, contiene la descripción del proceso de análisis, diseño, implementación, resultados obtenidos y las subsecuentes recomendaciones que, en el ámbito de la Ingeniería Industrial, se elaboran en torno de los conceptos y técnicas fundamentales de la Metodología Lean Manufacturing, en la empresa Coca-Cola FEMSA; de manera específica, en la planta que se ubica en la ciudad de Bucaramanga, Santander, Colombia. Así las cosas, en el mencionado espacio de producción industrial, se realizó un análisis diagnóstico sobre el proceso de manufactura actual, encontrando oportunidades de mejora y aspectos críticos. Del mismo modo, se plantearon las mejoras mediante las herramientas de la Metodología, en cada una de las áreas críticas encontradas en el diagnóstico; principalmente en las líneas de embotellado. Posteriormente se implementó de manera exitosa, logrando una mejora evidente en el porcentaje de productividad de la planta, disminución de los tiempos de cambios de formato y mayor producción de cajas mensuales. Adicionalmente, se capacitó y acompañó al personal de la planta, por medio de campañas de sensibilización con miras de lograr cumplimiento del programa y mayor compromiso al realizar sus labores. Del mismo modo, se elaboraron las subsecuentes recomendaciones en torno de la importancia de la práctica habitual y cotidiana de la Metodología expuesta. Es así como el presente proyecto, introduce la Metodología Lean Manufacturing en la mayor parte de las actividades productivas de la Planta, con ello, formula y ejecuta un plan de mejora que permite la aplicación sostenida en el tiempo, principalmente de la Herramientas 5S y SMED, en las tareas de cambio de formatos, mantenimiento y producción de las máquinas intervinientes en los procesos de manufactura de la empresa Coca-Cola FEMSA - Bucaramanga, repercutiendo directamente en la eficiencia de todos los procesos de manufactura implicados. | |
| dc.description.abstractenglish | This documentary delivery contains the description of the process of analysis, design, implementation, results obtained and the subsequent recommendations that, in the field of Industrial Engineering, are developed around the fundamental concepts and techniques of the Lean Manufacturing Methodology, in the Coca-Cola FEMSA company; specifically, in the plant located in the city of Bucaramanga, Santander, Colombia. Thus, in the aforementioned industrial production space, a diagnostic analysis was carried out on the current manufacturing process, finding opportunities for improvement and critical aspects. Likewise, improvements were proposed using the Methodology tools, in each of the critical areas found in the diagnosis; mainly in bottling lines. It was subsequently implemented successfully, achieving an evident improvement in the plant's productivity percentage, reduction in format change times and greater production of monthly boxes. In addition, plant personnel were trained and supported through awareness campaigns with a view to achieving compliance with the program and greater commitment when carrying out their work. In the same way, subsequent recommendations were prepared regarding the importance of the habitual and daily practice of the exposed Methodology. This is how this project introduces the Lean Manufacturing Methodology in most of the productive activities of the Plant, thereby formulating and executing an improvement plan that allows the sustained application over time, mainly of the 5S and SMED Tools. . , in the tasks of changing formats, maintenance and production of the machines involved in the manufacturing processes of the Coca-Cola FEMSA - Bucaramanga company, greatly impacting the efficiency of all the manufacturing processes involved. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Industrial | |
| dc.format.mimetype | application/msword | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/15959 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
| dc.publisher.program | Ingeniería Industrial | |
| dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.subject | Smed | |
| dc.subject | 5´S | |
| dc.subject | Productividad | |
| dc.subject | Mejora de procesos | |
| dc.subject | Estudio de tiempos | |
| dc.subject.keyword | Smed | |
| dc.subject.keyword | 5´s | |
| dc.subject.keyword | Productivity | |
| dc.subject.keyword | Process improvement | |
| dc.subject.keyword | Time study | |
| dc.title | Mejoramiento de procesos de manufactura mediante la implementación de la metodología Lean Manufacturing en la planta Coca-Cola FEMSA – Bucaramanga. | |
| dc.title.english | Improvement of Manufacturing Processes through the implementation of the Lean Manufacturing Methodology at the Coca-Cola FEMSA plant Bucaramanga. | |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 5 de 5
Cargando...
- Nombre:
- Documento .pdf
- Tamaño:
- 6.08 MB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Carta de confidencialidad-.pdf
- Tamaño:
- 108.77 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de Proyecto.pdf
- Tamaño:
- 640.87 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Carta de Autorización.pdf
- Tamaño:
- 82.29 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.18 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción:
