Publicación: Estudio de la viabilidad del uso de potencia hidráulica del sistema de inyección, como insumo para sistemas de levantamiento artificial, en el bloque Caracara
| dc.contributor.advisor | Lopez Uribe, Juan Enrique | |
| dc.contributor.author | Nieto Velasquez, Alex Fabian | |
| dc.date.accessioned | 2024-03-04T00:04:08Z | |
| dc.date.available | 2018 | |
| dc.date.available | 2024-03-04T00:04:08Z | |
| dc.date.created | 2018 | |
| dc.date.issued | 2018 | |
| dc.description.abstract | Este proyecto es desarrollado en el Bloque Caracara. Inicialmente se realizó una descripción de las generalidades del campo para mostrar su historia, localización y producción. El desarrollo corresponde a la descripción del funcionamiento de la operación de extracción y tratamiento empleada en el Campo, se describió y simulo la red de inyección de agua a manera de disposición, se realizaron corridas de simulaciones a condiciones dinámicas de flujo con el sistema de levantamiento actual ESP para corroborar el consumo energético, se diseñó un sistema de levantamiento de Bombeo hidráulico para las condiciones operativas, con esto se modelaron sus condiciones dinámicas de flujo y se obtuvieron los requerimientos de cargas de potencia, para así realizar la comparación entre los sistemas de levantamiento actual y Jet obteniendo así indicadores de desempeño. Los diseños Jet fueron basados en la presión manejada por la red de inyección actual, la cual será el suministro energético para el sistema de levantamiento de Bombeo hidráulico. Los simuladores aplicados son IPM-PROSPER, IPM-GAP y SYAL. Primero se simularon las condiciones límites de la red de inyección para definir la disponibilidad de Energía en cada cluster por parte del agua de inyección, con esto mediante una matriz se descartaron los sistemas que no empleaban fuentes hidráulicas como empuje y se seleccionó aquel sistema que pudiera tomar dicha energía, con las simulaciones del nuevo sistema de levantamiento se establecieron los consumos energéticos de acuerdo al sistema de inyección por requerir elevar presión, con esto se definieron los KPI para comparar ambos sistemas y ver alcances técnicos, una vez cumplieron la fase técnica, se realizó una evaluación financiera en dos etapas para determinar la factibilidad de la implementación de la técnica que permite re usar la energía del sistema de inyección como fuente de alimentación a un sistema de levantamiento artificial. | |
| dc.description.abstractenglish | This project is developed in the Caracara Block. Initially a description of the generalities of the field was made to show its history, location and production. The development of the content corresponds to the description of the operation of the operation of extraction and treatment used in the Field, the water injection network was described and simulated as an arrangement, runs of simulations were carried out to dynamic conditions of flow with the system of current lifting ESP to corroborate the energy consumption, a hydraulic pumping system was designed for the operating conditions, with this the dynamic flow conditions were modeled and the power load requirements were obtained, in order to make the comparison between the current lifting systems and Jet obtaining performance indicators. The Jet designs were based on the pressure handled by the current injection network, which will be the energy supply for the hydraulic pumping system. The applied simulators are IPM-PROSPER, IPM-GAP and SYAL. First, the boundary conditions of the injection network were simulated to define the availability of Energy in each cluster by the injection water. With this matrix, systems that did not use hydraulic sources such as thrust were discarded and that system that could be used was selected. take this energy, with the simulations of the new lifting system, the energy consumptions were established according to the injection system due to the need to raise pressure, with this the KPIs were defined to compare both systems and see technical scope, once the technical phase was completed, a financial evaluation was carried out in two stages to determine the feasibility of the implementation of the technique that allows to reuse the energy of the injection system as a source of power to an artificial lift system. | |
| dc.description.degreelevel | Maestría | |
| dc.description.degreename | Magíster en Ingeniería de Petróleos y Gas | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/38541 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Maestría en Ingeniería de Petróleos y Gas | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Sistema Levantamiento Artificial | |
| dc.subject | Bombeo Hidráulico | |
| dc.subject | Bombeo Electro Sumergible | |
| dc.subject | Optimización Energética | |
| dc.subject | Técnicas No Convencionales | |
| dc.subject | Reducción Costos Operativos. | |
| dc.subject.keyword | Artificial Lift System | |
| dc.subject.keyword | Hydraulic Pump | |
| dc.subject.keyword | Electric Submersible Pump | |
| dc.subject.keyword | Energy Optimization | |
| dc.subject.keyword | No Conventional Techniques | |
| dc.subject.keyword | Reduction Of Operating Costs | |
| dc.title | Estudio de la viabilidad del uso de potencia hidráulica del sistema de inyección, como insumo para sistemas de levantamiento artificial, en el bloque Caracara | |
| dc.title.english | Study of viability of use to hydraulic power of injection system, as a supply for artificial lifting systems, in caracara block. 3 | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_bdcc | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Maestria | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 185.01 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 165.09 KB
- Formato:
- Adobe Portable Document Format