Publicación: Rediseño de la red regulada del edificio de investigaciones (edi) del parque tecnológico guatiguara (pig) de la sede Piedecuesta de la UIS
| dc.contributor.advisor | Ortiz Rangel, Manuel Jose | |
| dc.contributor.advisor | Ordoñez Plata, Gabriel | |
| dc.contributor.author | Aristizabal Penaloza, Cesar Mauricio | |
| dc.contributor.author | Duarte Aparicio, Cristhian Raul | |
| dc.date.accessioned | 2024-03-03T20:40:51Z | |
| dc.date.available | 2014 | |
| dc.date.available | 2024-03-03T20:40:51Z | |
| dc.date.created | 2014 | |
| dc.date.issued | 2014 | |
| dc.description.abstract | El presente proyecto plantea el rediseño de las instalaciones eléctricas reguladas del Edificio de investigaciones (EDI) del Parque tecnológico Guatiguará (PTG) de la sede Piedecuesta de la Universidad Industrial de Santander (UIS). El EDI actualmente es el centro de investigación y desarrollo tecnológico más grande y diverso de la UIS. El rediseño consiste en la instalación de un sistema de respaldo energético centralizado por ducto técnico mediante cuatro (4) UPS, que respaldan energéticamente las áreas administrativas, áreas de proceso de cada uno de los laboratorios y las salas de cómputo del EDI, ubicadas en el sótano S-01 del edificio. Estas unidades se instalaran en un área climatizada, protegida de la humedad y el polvo para el correcto funcionamiento de estos equipos. El sistema centralizado ofrece un mayor factor de confiabilidad ya que puede enfrentar perturbaciones eléctricas de mayor intensidad y duración, menor costo de operación y de mantenimiento. Las UPS utilizadas presentan una tecnología online que garantiza una máxima respuesta en tiempo ante un evento de falla en la red, pues provee alimentación constante desde su batería y no de forma directa. Este rediseño plantea la reutilización de un conductor existente entre las acometidas del tablero de baja tensión (TGBT) y los tableros de medida (TM), además de: la instalación de la protección del TGBT, la instalación de las UPS´s, instalación del tablero principal para UPS y nuevas acometidas reguladas. Este proyecto se basa en la normativa eléctrica colombiana, cumpliendo con las exigencias establecidas por la NORMA ESSA, RETIE y NTC 2050. Esto garantiza que el EDI, siga contando con estándares de alta calidad, confiabilidad y eficiencia en su infraestructura física y eléctrica. | |
| dc.description.abstractenglish | The present project outlines the redesign of the regulated electrical installations of the Investigation Building (EDI), the Guatiguara Technological Park (PTG), Universidad Industrial de Santander (UIS). Currently the EDI is the largest and most diverse of the investigation and technological development centers at UIS. The redesign consist in the setting-up of a backup centralized power system through service duct by means of four (4) UPS, which energetically support the administrative area, processing areas in each laboratory and the EDI computation rooms, located in the S-01 basement of the building. These units will be installed in an air-conditioned area, protected from humidity and dust to ensure the correct operation of these equipments. The centralized system offers a greater reliability factor because it can deal with electrical perturbations of higher intensity and longer duration, lower operation and maintenance costs. The UPS used presents an online technology which guarantees a maximum response of time in case of a failure in the grid since it provides a constant source from its battery and not in a direct way. This redesign propose the reutilization of an existing conductor between the low tension general board (TGBT) connection and the measurement board (TM), in addition to the installation of the TGBT protections, the installa This project is based on the Colombian electrical regulations, complying with the demands established by the NORMA ESSA, RETIE and NTC 2050. This to guarantee that the EDI will keep high quality standards, reliability, and efficiency in its physical and electrical infrastructure. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Electricista | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/30386 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Eléctrica | |
| dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Instalaciones Eléctricas | |
| dc.subject | Ups | |
| dc.subject | Edificio De Investigaciones | |
| dc.subject | Rediseño. | |
| dc.subject.keyword | Electrical Installations | |
| dc.subject.keyword | Ups | |
| dc.subject.keyword | The Investigation Building | |
| dc.subject.keyword | Redesign. | |
| dc.title | Rediseño de la red regulada del edificio de investigaciones (edi) del parque tecnológico guatiguara (pig) de la sede Piedecuesta de la UIS | |
| dc.title.english | Redesign of regulated network of the investigation building (edi), the guatiguara technological park (ptg), UIS . | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 101.29 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 435.72 KB
- Formato:
- Adobe Portable Document Format