Publicación: Medición de tiempos y procesos para valoración de operaciones de subsuelo de un campo productor tipo
| dc.contributor.advisor | Calvete González, Fernando Enrique | |
| dc.contributor.advisor | Quiroga Cruz, Hugo | |
| dc.contributor.author | Duran Torres, Carlos Alberto | |
| dc.date.accessioned | 2024-03-03T19:26:00Z | |
| dc.date.available | 2012 | |
| dc.date.available | 2024-03-03T19:26:00Z | |
| dc.date.created | 2012 | |
| dc.date.issued | 2012 | |
| dc.description.abstract | El principal objetivo de este trabajo es el de valorar las operaciones de subsuelo de un campo productor tipo, denominado por razones de confidencialinvertido en la ejecución de las operaciones, el tiempo que se planea para las mismas y el impacto económico que tienen los tiempos muertos sobre los interese del campo. En este trabajo se comparan los tiempos operativos con los tiempos planeados, encontrando una diferencia del 65%. Lo cual permite concluir, que no existe una buena planeación en los Well planing. En vista de lo anterior las mediciones se compararan con respecto al factor de servicio. De esta manera se presentan las principales causas de las pérdidas de tiempo en los equipos que estuvieron operando durante el año 2011, causantes del factor de servicio de 87% mostrado durante el mismo año, determinando cuales impactaban mas las operaciones y categorizándolas con el fin de encontrar de manera mas puntual de manera se estaba perdiendo tiempo. Con los resultados obtenidos de la medición y categorización se redefinieron las causas de pérdidas de tiempo, logrando encontrar las responsabilidades operativas de las mismas. Con las nuevas definiciones se calculó el impacto económico asociándolo con las tarifas que son pagadas a los taladros, que están directamente relacionadas a los tiempos activos y muertos de las operaciones. Finalmente, de acuerdo a los resultados obtenidos, se proponen unas variables de medición de desempeño (KPI), con el fin de llevar un control operativo de las operaciones. Este proyecto se desarrollo durante el segundo semestre de 2011 como parte de la labor principal desarrollada en la práctica empresarial con Ecopetrol S.A, midiendo las operaciones de todo el año 2011, ejecutadas por un promedio de 13,2 equipos por mes entre Workover y wellservice. | |
| dc.description.abstractenglish | The main objective of this work is to evaluate the subsurface operations of a producing field type, for confidentiality reasons called "Field PT" in terms of time spent in the execution of operations, the planned time for them and the economic impact downtime over the interests of the field. In this work the operating times were compared with the planned times, finding a difference of 65%. This leads to the conclusion that there is no good planning in the Wellplaning. In view of the above, the measurements were compared with respect to the service factor. Thus, the main causes of wasted time on rigs that were operating during 2011, causing the duty cycle of 87% shown in the same year, were determinates, calculating how they impacted on operations and categorizing them in order to find where time was being lost. With the results obtained from the measurement and categorization were redefined causes loss of time, achieving operational responsibilities find them. With the new definitions we calculated the economic impact by associating it with the tariffs are paid to the drills, which are directly related to active and dead times operations. Finally, according to the results, some variables (KPI) were proposed to take operational control of operations. This project was developed during the second half of 2011 as part of the main work developed in business practice with Ecopetrol SA, measuring operations around the year 2011, executed by an average of 13.2 rigs per month between Workover and wellservice. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/26464 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Workover | |
| dc.subject | Wellservice | |
| dc.subject | Factor de servicio | |
| dc.subject | Pérdidas de tiempo | |
| dc.subject | Variables KPI | |
| dc.subject | Wellplaning. | |
| dc.subject.keyword | Workover | |
| dc.subject.keyword | Wellservice | |
| dc.subject.keyword | Service factor | |
| dc.subject.keyword | Loss of time | |
| dc.subject.keyword | KPI variables | |
| dc.subject.keyword | wellplaning. | |
| dc.title | Medición de tiempos y procesos para valoración de operaciones de subsuelo de un campo productor tipo | |
| dc.title.english | Measurement of time and process for subsurface operations valouation of a productor field. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 297.35 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 339.79 KB
- Formato:
- Adobe Portable Document Format