Publicación: Evaluación de prácticas operacionales para reducir las fallas en tubería de producción por efecto de la inyección de agua en el Campo Casabe
| dc.contributor.advisor | Sáchica Ávila, Jorge Andrés | |
| dc.contributor.author | Mayorga Huérfano, Diana Lorena | |
| dc.date.accessioned | 2024-03-03T18:37:37Z | |
| dc.date.available | 2011 | |
| dc.date.available | 2024-03-03T18:37:37Z | |
| dc.date.created | 2011 | |
| dc.date.issued | 2011 | |
| dc.description.abstract | En el presente estudio se identifica y evalúan las diferentes técnicas existentes para el control de un problema operacional que se presenta con relativa regularidad en la operación del Campo Casabe denominado Jeteo, dicha falla es ocasionada por el desgaste acelerado y/o ruptura en la tubería de producción generada por efecto de presiones de inyección superiores a las características de resistencia del material o a las condiciones para las cuales se diseñó el completamiento del sistema. Aunque continuamente se han implementado acciones para disminuir el daño asociado a este factor, se busca evaluar con suficiente detenimiento las alternativas usadas, con el propósito de establecer el mejor escenario para cada eventualidad y de esta manera aumentar el run life de los pozos con evidencia de Jeteo. Este análisis implica entre otros aspectos, examinar la información histórica de los pozos del campo asociados específicamente a la problemática objeto de estudio de este proyecto, la identificación de problemas operacionales, su regularidad, el análisis específico de las variables del problema (posicionamiento del pozo, zonas productoras, densidades cañoneadas, modelos de inyección, caudales inyectados, presiones, periodicidad del daño, tipo de mantenimiento o intervenciones aplicadas), así como el estudio, comprensión y análisis de diferentes alternativas técnicas y operacionales para el control de este problema; su respectiva valoración técnica en los casos de estudio. Por lo anterior, este trabajo propone evaluar técnicamente el efecto de los factores asociados al proceso de producción respecto a alternativas conocidas y disponibles para implementar en el corto y mediano plazo, como lo son: el uso de Blast Joint (sección de tubería más pesada y resistente a la convencional que se coloca sobre el intervalo perforado y que da paso a la tubería de producción, además de ser más resistente que los componentes de la finalización normal, su pared es empleada para resistir la acción a chorro que se puede dar en locaciones próximas a las perforaciones), y/o la ubicación de la bomba de subsuelo en niveles superiores a las perforaciones. | |
| dc.description.abstractenglish | The present study identifies and values the different techniques employed to control an operational problem that occurs regularly on the operation of the Casabe Field also known as Jeteo. Such failure is caused by accelerated wear and / or break in the tubing; produced by the effect of an injection pressures superior to the strength characteristics of material. While continuous actions have been implemented to reduce the harm associated with this factor, depth evaluation of the used alternatives is necessary in order to establish the best scenario for every eventuality and thereby increase the run life of the wells with evidence Jeteo. This analysis implies among other things, examining the historical data from wells in the field specifically related to the issue under consideration in this project, identification of operational problems, regularity, specific analysis of the problem variables (position of the well, producing areas, densities guns, injection models, injected flow, pressure, frequency of damage, maintenance or interventions used), and the study, understanding and analysis of technical and operational alternatives for controlling this problem; i.e. the appropriate technical assessment in the case studies. Therefore, this paper proposes to technically evaluate the effect of factors associated with the production process for known and available alternatives to be implement in the short and medium term, such as: the use of Blast Joint (pipe section heavier and resistant to conventional placed over the perforated interval, which leads to the production tubing, and is more resistant than the normal end components, its wall is used to resist the jet that can occur in locations around the holes) and / or location of the underground pump at levels above the perforations. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero de Petróleos | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/25060 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
| dc.publisher.program | Ingeniería de Petróleos | |
| dc.publisher.school | Escuela de Ingeniería de Petróleos | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Jeteo | |
| dc.subject | Run life | |
| dc.subject | Blast Joint. | |
| dc.subject.keyword | Jeteo | |
| dc.subject.keyword | Run life | |
| dc.subject.keyword | Blast Joint. | |
| dc.title | Evaluación de prácticas operacionales para reducir las fallas en tubería de producción por efecto de la inyección de agua en el Campo Casabe | |
| dc.title.english | Operational evaluation of practices to reduce the failure of pipe production by the effect of water injection in the field | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 285.2 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 399.89 KB
- Formato:
- Adobe Portable Document Format