Actualización de las instalaciones eléctricas de una institución hospitalaria de nivel 1 incorporando un sistema de gestión de energía basado en la monitorización de tableros de distribución y cargas de consumo significativo
dc.contributor.advisor | Ortiz Rangel, Manuel Jose | |
dc.contributor.advisor | Ordoñez Plata, Gabriel | |
dc.contributor.author | Paternina Passos, Diego Andrés | |
dc.contributor.author | Suescun Sanabria, Anderson | |
dc.date.accessioned | 2024-03-04T00:40:50Z | |
dc.date.available | 2020 | |
dc.date.available | 2024-03-04T00:40:50Z | |
dc.date.created | 2020 | |
dc.date.issued | 2020 | |
dc.description.abstract | En este proyecto se realizó el diseño de las instalaciones eléctricas para una institución hospitalaria de nivel 1, implementando un sistema de monitorización de cargas significativas para realizar el seguimiento en tiempo real de los consumos energéticos y otras variables eléctricas, adicionalmente se realiza también un estudio para la instalación de un sistema de generación de energía mediante paneles solares que suplen parcialmente la carga del hospital. Se realizó una inspección de las instalaciones eléctricas existentes, y se logró identificar los componentes que no cumplen con la reglamentación vigente (Reglamento Técnico de Instalaciones Eléctricas RETIE), ni con las especificaciones de la Norma Técnica Colombiana NTC 2050 para instituciones médicas, por lo cual se genera un alto potencial de riesgo eléctrico para los usuarios de la institución hospitalarias, el personal médico y el personal administrativo y operativo que labora en la institución. Por este motivo se procede a realizar un diseño de las instalaciones eléctricas de la institución, con el fin de mejorar las condiciones de operativas del sistema eléctrico, dar cumplimiento a lo que dicta el marco normativo y reglamentario, reducir el riesgo por ausencia de electricidad mediante la implementación de una planta de emergencia con capacidad para el suministro de la totalidad de la demanda energética de la institución, la definición de un sistema de transferencia automática que garantiza un tiempo de restablecimiento del flujo de energía menor a 10 segundos posteriores al corte del suministro energético y la implementación de un sistema ininterrumpido de potencia por medio de UPS con el fin de garantizar la continuidad del suministro eléctrico en las zonas críticas de la instrucción hospitalaria. | |
dc.description.abstractenglish | In this project the design of the electrical installations for a level 1 hospital institution was carried out, implementing a monitoring system of significant loads to carry out real-time monitoring of energy consumption and other electrical variables, in addition a study is also carried out to the installation of a power generation system using solar panels that partially supply the hospital load. An inspection of the existing electrical installations was carried out, and it was possible to identify the components that do not comply with the current regulations (Technical Regulations of Electrical Installations RETIE), nor with the specifications of the Colombian Technical Standard NTC 2050 for medical institutions, for which reason a high potential of electrical risk is generated for the users of the hospital institution, the medical staff and the administrative and operative personnel that work in the institution. For this reason, a design of the electrical installations of the institution is carried out, in order to improve the operating conditions of the electrical system, comply with what the regulatory and regulatory framework dictates, reduce the risk of absence of electricity by the implementation of an emergency plant with capacity for the supply of the entire energy demand of the institution, the definition of an automatic transfer system that guarantees a time of restoration of the flow of energy less than 10 seconds after the cut of the supply energy and the implementation of an uninterrupted power system through UPS in order to guarantee the continuity of the electricity supply in the critical areas of hospital instruction. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Electricista | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/39800 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Ingeniería Eléctrica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Baja Tensión | |
dc.subject | Carga Instalada | |
dc.subject | Instalación Eléctrica | |
dc.subject | Monitorización | |
dc.subject | NTC 2050 | |
dc.subject | Retie | |
dc.subject | Sistema de Generación Fotovoltaico. | |
dc.subject.keyword | Low Voltage | |
dc.subject.keyword | Installed Charge | |
dc.subject.keyword | Electrical Installation | |
dc.subject.keyword | Monitoring | |
dc.subject.keyword | Ntc 2050 | |
dc.subject.keyword | Retie | |
dc.subject.keyword | Photovoltaic Generation System. | |
dc.title | Actualización de las instalaciones eléctricas de una institución hospitalaria de nivel 1 incorporando un sistema de gestión de energía basado en la monitorización de tableros de distribución y cargas de consumo significativo | |
dc.title.english | Update of the Electrical Facilities of a Level 1 Hospital Institution Incorporating an Energy Management System Based on the Monitoring of Distribution Boards and Significant Consumption Charges. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 188.12 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 139.39 KB
- Format:
- Adobe Portable Document Format