Equipos de control de presión en unidades de intervención de pozo sin taladro
dc.contributor.advisor | Calvete González, Fernando Enrique | |
dc.contributor.advisor | Londono, Diego | |
dc.contributor.author | Marín Sepulveda, Walter Jose | |
dc.contributor.author | Olmos Gelvez, Diego Fernando | |
dc.date.accessioned | 2024-03-03T19:26:01Z | |
dc.date.available | 2012 | |
dc.date.available | 2024-03-03T19:26:01Z | |
dc.date.created | 2012 | |
dc.date.issued | 2012 | |
dc.description.abstract | Con el objetivo de maximizar la rentabilidad, las operaciones de intervención, estimulación de yacimientos, toma de registros, recuperación de herramientas y re-terminación de pozos a menudo deben ejecutarse sin equipos de perforación rotativos o equipos de reparación de pozo convencionales. La utilización de unidades como Coiled Tubing y Wireline Permiten que se lleven a cabo operaciones de remediación de pozos presurizados o activos. Posteriormente al completamiento de un pozo, empieza una etapa muy importante que son las intervenciones de pozo las cuales buscan mantener la producción, realizar inspección y/o mantenimiento del estado mecánico, monitorear las condiciones actuales del yacimiento (PLT, ILT, PBU, PFO……), aumentar el recobro entre otras. Es importante resaltar que cada operación tendrá un impacto de producción asociado el cual se debe minimizar, entonces a partir de este requerimiento juegan un papel importante las unidades de Tubería flexible (Coiledtubing), Cable eléctrico (Electric Line), alambre y cable (Slick / Braided line) que permiten intervenir el pozo mientras este produce, esto se debe a que cada unidad tiene equipos de control de presión c uya función es contener en superficie el fluido del pozo y garantizar un sello absoluto, así la presión del pozo no escapa al medio ambiente. En este manual se ilustran los equipos de superficie y control de presión necesarios para la realización de una intervención de pozo sin taladro permitiendo entender su funcionamiento, además de una serie de contingencias que regularmente se encuentran en la vida de campo. | |
dc.description.abstractenglish | In order to maximize profitability, intervention operations, reservoir simulation, well logs, recovery of tools and re-completing wells often must run without rotary drilling equipment or equipment of repairing conventional wells. The use of coiled tubing and Wireline units allow to be carried out remediation operations or pressurized wells. Following the completion of a well, a very important stage starts that are well intervention which seek to maintain production, perform inspection and / or maintenance of mechanical condition, monitor the current conditions of the reservoir (PLT, ILT, PBU, PFO ... ...), and increase the recovery among others. It is important to stress that each operation will impact associated production which must be minimized, then from this requirement the coiled tubing, Electric Line, Wireline (Slick / Braided line) units play a role to allow the well intervention while this is on production, this is because each unit has control devices whose function is to contain the well fluid in the surface and ensure a complete seal, so the wellbore pressure does not escape to the environment atmosphere. This manual illustrates the surface equipment and pressure control equipment needed to perform well intervention without rotator drill allowing understand its operation, plus a number of contingencies that are regularly found at well life. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero de Petróleos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/26468 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería de Petróleos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Equipos control presión intervenciones | |
dc.subject.keyword | Equipment control pressure intervention | |
dc.title | Equipos de control de presión en unidades de intervención de pozo sin taladro | |
dc.title.english | Pressure control equipment on well intervention units without drill rig. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 117.97 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 1.07 MB
- Format:
- Adobe Portable Document Format