Modelo de mantenimiento para la u-2920 de la refinería de Barrancabermeja utilizando metodologia de rcm
dc.contributor.advisor | Carrillo Jaraba, James Andrés | |
dc.contributor.author | González Carrillo, Omar Libardo | |
dc.contributor.author | Hernández Bohórquez, Juan Carlos | |
dc.date.accessioned | 2024-03-03T19:39:44Z | |
dc.date.available | 2012 | |
dc.date.available | 2024-03-03T19:39:44Z | |
dc.date.created | 2012 | |
dc.date.issued | 2012 | |
dc.description.abstract | El mantenimiento de una planta Industrial es un pilar fundamental para garantizar la competitividad de las empresas, la globalización de las empresas requiere que la gestión de mantenimiento garantice la disponibilidad de los equipos a un costo razonable con seguridad y cuidado del medio ambiente. En este sentido, la presente investigación presenta una propuesta para implementación de RCM en la Planta eléctrica de Balance U-2950 de la refinería de Barrancabermeja de Ecopetrol S.A, a partir de la evaluación de la situación actual de mantenimiento. Para tal fin, se evaluó la aplicación de los principales módulos del sistema de información de mantenimiento, teniendo en cuenta que es la base para aplicar los principales tipos de mantenimiento,( preventivo, correctivo, rutas de inspección y lubricación), con la aplicación de las solicitudes y planificación de las ordenes de trabajo se lleva un control de todos los recursos de mano de obra, repuestos, servicios contratados y debe llevar el costo del mantenimiento por cada equipo para comparar el valor de mantener con la decisión de hacer reformas ó la reposición de el equipo. La propuesta de aplicación de RCM en la planta inicia con la evaluación de la criticidad siguiendo un modelo de criticidad de factores ponderados realizado a los equipos de la U-2950. La evaluación fue desarrollada por los facilitadores de mantenimiento eléctrico y mecánico, adicionalmente con la estadística de fallas de mantenimiento se determinó que el equipo más crítico de la planta, son los turbogeneradores y entonces se realizó un modelo de aplicación de RCM. En las conclusiones de la monografía se destaca la relación de la estrategia de la mejora del sistema de información con la implementación de RCM. | |
dc.description.abstractenglish | The maintenance of an industrial plant is a cornerstone for competitive enterprises, the globalization of business requires that maintenance management ensure the availability of equipment at a reasonable cost with safety and environmental care. In this sense, this research suggests a proposal for implementation of RCM at the Balance´s electrical Plant U-2950 of the Barrancabermeja´s refinery of Ecopetrol S.A, from assessment the current state of maintenance. To this end, it evaluated the implementation of key modules of information system of maintenance, since are the basis for implementing the main types of maintenance, ( preventive, corrective, inspection and lubrication routes) with the implementation of applications and planning of work orders is controlling all the resources of labor, parts, services, and must bear the cost of maintenance of each equipment for compares the value of maintenance with the decision make reforms or replacement of the equipment. The proposed application of RCM in the plant begins with the assessment of criticality appling a model of weighted factors made in the machines in the U-2950. The assessment was development by facilitators of electrical and mechanical maintenance, furthermore with the maintenance statistical fault was selected the equipment most critical of the plant “ the turbogenerators ” and then was made the model of application of RCM. The conclusions of the Monograph highlights the relationship of the strategy of improving of the information system with the implementation of RCM, while improving the cost of maintenance to perform a proper maintenance plan, on the other hand are strategies that are aligned with the maintenance management system of the Barrancabermeja´refinery. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/27687 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Mantenimiento | |
dc.subject | Turbogeneradores | |
dc.subject | Módulos | |
dc.subject | Indicadores | |
dc.subject | Mantenimiento Centrado En Confiabilidad – Rcm – | |
dc.subject | Ciclo Phva | |
dc.subject | Balanced Score Card | |
dc.subject | Costos. | |
dc.subject.keyword | Maintenance | |
dc.subject.keyword | Turbogenerator | |
dc.subject.keyword | Modules | |
dc.subject.keyword | Indicators | |
dc.subject.keyword | Reliability Centered Maintenance | |
dc.subject.keyword | Rcm | |
dc.subject.keyword | Phva Cycle | |
dc.subject.keyword | Costs. | |
dc.title | Modelo de mantenimiento para la u-2920 de la refinería de Barrancabermeja utilizando metodologia de rcm | |
dc.title.english | Maintenance model for the u-2950 of the barrancabermeja refinery rcm methodology using. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 395.37 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 245.2 KB
- Format:
- Adobe Portable Document Format