Estudio técnico y financiero de la implementación del sistema de levantamiento plunger lift en pozos de los campos Tibú y sardinata de Ecopetrol S.A.

dc.contributor.advisorPineda Gómez, Cesar Augusto
dc.contributor.advisorJiménez Ríos, Jose Luis
dc.contributor.authorBarreto Pardo, Adriana Carolina
dc.date.accessioned2024-03-03T19:59:31Z
dc.date.available2013
dc.date.available2024-03-03T19:59:31Z
dc.date.created2013
dc.date.issued2013
dc.description.abstractEl campo Tibú y campo Sardinata, se encuentran ubicados en el departamento de Norte de Santander, Colombia. Hacen parte de la cuenca del Catatumbo y son operados por la Superintendencia de Operaciones Catatumbo Orinoquia de Ecopetrol S.A; estos dos campos se consideran campos maduros por tener más de 70 años de producción, los pozos del Cretáceo pertenecientes a estos dos campos se caracterizan por tener altas relaciones Gas-Líquido (GLR), por lo cual son afectados por la carga de líquidos siendo esto un obstáculo para la producción de gas. Este proyecto presenta un estudio técnico y financiero de la implementación del sistema de levantamiento Plunger Lift a 4 pozos de campo Tibú y 1 pozo de campo Sardinata, en donde ya se ha venido trabajando este sistema de levantamiento para ayudar a estos pozos a producir la carga de líquido y el gas de fondo a superficie. Con base en el estudio mostrado en este libro se evidencia la mejora en la producción de crudo y gas para dichos pozos. Durante el desarrolló del proyecto también se elaboró una metodología, la cual permitió seleccionar pozos candidatos para la instalación del sistema Plunger Lift en campo Tibú, ayudando así al desarrolló de este como predominante para el levantamiento de fluidos en este tipo de pozos. Para ello, se realizó una investigación detallada del funcionamiento, equipos requeridos para la instalación de fondo y superficie, operación y mantenimiento del sistema Plunger Lift. Se desarrolló una metodología que permitió el estudio técnico y financiero, se seleccionaron los pozos candidatos para la instalación del sistema y por último se validó la metodología en 1 pozo de los 10 seleccionados, cumpliendo así con los objetivos de este proyecto.
dc.description.abstractenglishThe Tibú and Sardinata field are located in the department of Norte de Santander, Colombia. They are part of the Catatumbo basin; they are operated by the Superintendencia de Operaciones Catatumbo Orinoquia of Ecopetrol S.A. Both field are considered mature fields due that they have over 70 years of activity, Cretaceous wells belonging to these two fields are characterized by high gas-liquid relations (GLR) and are therefore affected by fluid loading this being an obstacle to the production of gas. This project presents a technical and financial study of the implementation of Plunger Lift as artificial lifting system to 4 wells of Tibú field and 1 well of Sardinata field, where it has been working since the lifting system to help these wells to produce the load of liquid and gas from bottom to surface; based on the study shown in this book demonstrates the improvement in oil and gas production for these wells. During the development of the project also developed a methodology that allowed select candidate wells for the installation of the Plunger Lift system in Tibú field, so helping the development of this system as prevailing for the lifting of fluids in these wells. For that, it was performed a detailed investigation of the operation, equipment required for installation bottom and surface, operation and maintenance of the Plunger Lift System. A methodology was developed that allowed the technical and financial evaluation, and finally we selected candidate wells for the installation of the system and the methodology was validated in 1 of the 10 selected wells, fulfilling so the objectives of this project.
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero de Petróleos
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/28262
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicoquímicas
dc.publisher.programIngeniería de Petróleos
dc.publisher.schoolEscuela de Ingeniería de Petróleos
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectSistema Plunger Lift
dc.subjectHistoria De Producción
dc.subjectEstados Mecánicos
dc.subjectCurvas De Declinación
dc.subjectOptimización
dc.subjectValor Presente Neto
dc.subjectTasa Interna De Retorno
dc.subjectRelación Beneficio-Costo.
dc.subject.keywordPlunger Lift System
dc.subject.keywordProduction History
dc.subject.keywordMechanical States
dc.subject.keywordDecline Curve
dc.subject.keywordOptimization
dc.subject.keywordNet Present Value
dc.subject.keywordInternal Rate Of Return
dc.subject.keywordBenefit Cost Ratio.
dc.titleEstudio técnico y financiero de la implementación del sistema de levantamiento plunger lift en pozos de los campos Tibú y sardinata de Ecopetrol S.A.
dc.title.englishTechnical and financial study of the implementation of plunger lift as artificial lift system in wells of the Tibú and sardinata fields.
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 2 of 2
No Thumbnail Available
Name:
Documento.pdf
Size:
4.97 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
233.15 KB
Format:
Adobe Portable Document Format