Diseño de un plan de mantenimiento preventivo/predictivo para los precipitadores electrostáticos de la central Termoguajira Gecelca S.A. E.S.P
dc.contributor.advisor | Leal García, Tarcisio | |
dc.contributor.advisor | Blanco Solano, Jairo | |
dc.contributor.author | Cardenas Torres, Norvellys | |
dc.contributor.evaluator | Quiroga Quiroga, Oscar Arnulfo | |
dc.contributor.evaluator | Ortíz Rangel, Manuel José | |
dc.date.accessioned | 2023-03-13T15:02:40Z | |
dc.date.available | 2023-03-13T15:02:40Z | |
dc.date.created | 2023-03-12 | |
dc.date.issued | 2023-03-12 | |
dc.description.abstract | El presente trabajo de grado tiene como propósito diseñar un plan de mantenimiento preventivo y predictivo para los precipitadores electrostáticos instalados en la central termoeléctrica Termoguajira, con el objeto de disminuir los mantenimientos correctivos y prolongar el óptimo funcionamiento del activo. En primera instancia se presenta la revisión de diversos estudios, donde se exponen distintos métodos estadísticos y técnicas de mantenimiento para mejorar la confiabilidad de los activos en la industria con miras en seleccionar un método a implementar en el desarrollo de este trabajo de grado. Se inicia con la obtención de información de las fallas reportadas en el historial de mantenimiento de los precipitadores electrostáticos contenido en un software de mantenimiento asistido por computadora (CMMS) de Termoguajira llamado Mainsaver, para luego ser filtrada y ordenada. Posteriormente se emplea el método de Duane a los datos para establecer un panorama del mantenimiento actual mediante la interpretación del resultado de acuerdo a criterios que estipula el método. Después, se aplican tres distribuciones estadísticas (Normal, Weibull 2P y Log Normal) para describir el comportamiento de los tiempos de reparación de los precipitadores electrostáticos, determinando las funciones de confiabilidad correspondientes a cada distribución y mediante las pruebas de ajuste de bondad (Chi-Cuadrado y K-S) se selecciona el modelo más compatible con los datos estudiados. Por último, se implementa la estrategia de mantenimiento PMO y con los resultados obtenidos se determinan las actividades de mantenimiento preventivo/predictivo y tiempo recomendado de ejecución de las mismas. | |
dc.description.abstractenglish | The purpose of this degree work is to design a preventive/predictive maintenance plan for the electrostatic precipitators installed in the Termoguajira thermoelectric power plant, in order to reduce corrective maintenance and prolong the optimal operation of the asset. In the first instance, a review of several studies is presented, where different statistical methods and maintenance techniques to improve the reliability of the assets in the industry are exposed in order to select a method to be implemented in the development of this degree work. It begins with obtaining information of the failures reported in the maintenance history of the electrostatic precipitators contained in a computer-assisted maintenance software (CMMS) of Termoguajira called Mainsaver, to be then filtered and sorted. Subsequently, Duane's method is applied to the data and an overview of the current maintenance is established by interpreting the result according to already stipulated criteria. Then, three statistical distributions (Normal, Weibull 2P and Log Normal) are applied to describe the behavior of electrostatic precipitator repair times, determining the reliability functions corresponding to each distribution and by means of goodness-of-fit tests (Chi-Square and K-S) the model most compatible with the data studied is selected. Finally, the PMO maintenance strategy is implemented and with the results obtained, the preventive/predictive maintenance activities and their recommended execution time are determined. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Electricista | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/12511 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Eléctrica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.subject | Mantenimiento preventivo/predictivo | |
dc.subject | Confiabilidad | |
dc.subject | Precipitadores electrostáticos | |
dc.subject | PMO | |
dc.subject | Distribuciones de confiabilidad | |
dc.subject.keyword | Preventive/Predictive maintenance | |
dc.subject.keyword | Reliability | |
dc.subject.keyword | Electrostatic precipitators | |
dc.subject.keyword | PMO | |
dc.subject.keyword | Reliability distributions | |
dc.title | Diseño de un plan de mantenimiento preventivo/predictivo para los precipitadores electrostáticos de la central Termoguajira Gecelca S.A. E.S.P | |
dc.title.english | Design of a preventive/predictive maintenance plan for the electrostatic precipitators of the power plant Termoguajira Gecelca S.A. E.S.P | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 1.09 MB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 672.99 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: