Metodologia para la determinacion de las condiciones limite de operacion rentable de un pozo en produccion con sistema de bombeo electrosumergible para los campos adjudicados a la empresa new granada energy corp
dc.contributor.advisor | Montes Páez, Erik Giovany | |
dc.contributor.author | Daza Almonacid, Denis Danilo | |
dc.date.accessioned | 2023-04-05T11:56:38Z | |
dc.date.available | 2023 | |
dc.date.available | 2023-04-05T11:56:38Z | |
dc.date.created | 2019 | |
dc.date.issued | 2019 | |
dc.description.abstract | La necesidad de implementar procesos integrales para evaluar técnica y económicamente las operaciones de producción de pozos, ha sido el insumo inicial de esta metodología. La cual compone 4 secciones que describen progresivamente el proceso necesario para establecer las condiciones límite de operación rentable de un pozo en producción con sistema de bombeo Electrosumergible. Inicialmente son revisadas las especificaciones técnicas de los equipos principales que componen el sistema de levantamiento artificial Bombeo Electrosumergible como son la fuente de generación, motor de fondo, bomba y variador. Posteriormente son abordados los conceptos básicos financieros; y establecidos los indicadores principales para evaluar financieramente la operación de pozos en producción. Una vez definidos los criterios técnicos y financieros, son establecidos los rangos de operación de los equipos y los índices financieros requeridos para la metodología. Finalmente es realizada una descripción detallada para la implementación de la metodología propuesta, donde es posible establecer las condiciones límite de carácter técnico y financiero para evaluar la rentabilidad de un pozo en producción, con sistema de levantamiento Bombeo Electrosumergible El desarrollo de este estudio es una herramienta útil para identificar el estado técnico y financiero de un pozo productor completado con sistema BES; y a su vez para evaluar la rentabilidad del mismo. La metodología propuesta puede ser evaluada para ser implementada en la evaluación de costos fijos y/o variables de locaciones (clusters) y campos de producción con el fin de ampliar su influencia de aplicación y utilidad. | |
dc.description.abstractenglish | The need to implement integral processes to evaluate technically and economically well production operations, has been the initial input of this methodology. This consists of 4 sections that progressively describe the process necessary to establish limit conditions for the profitable operation of a well in production with Electrosumergible pumping system. Initially, technical specifications of the main equipments that make up the artificial lift system, such as the generation source, bottom motor, pump and inverter, are reviewed. Subsequently, basic financial concepts are addressed; and established the main indicators to evaluate financially operation of wells in production. Once the technical and financial criteria have been defined, operating ranges of the equipments and financial indexes required for the methodology are established Finally a detailed description is made for the implementation of proposed methodology, in such a way it is possible to establish technical and financial limit conditions to evaluate profitability of a well in production, with lifting system Electrosumergible Pumping The development of this study is a useful tool to identify the technical and financial state of a producer well completed with BES system; and as also for evaluate the profitability of it. The proposed methodology can be evaluated to be implemented in the evaluation of fixed costs and / or variables of locations (clusters) and production fields in order to broaden its influence of application and utility. * | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Hidrocarburos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/12836 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Especialización en Gerencia de Hidrocarburos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Indicadores | |
dc.subject | Especificaciones Tecnicas | |
dc.subject | Rentabilidad | |
dc.subject | Evaluacion Financier | |
dc.subject.keyword | Indicators | |
dc.subject.keyword | Technical Specifications | |
dc.subject.keyword | Profitability | |
dc.subject.keyword | Financial Evaluation. | |
dc.title | Metodologia para la determinacion de las condiciones limite de operacion rentable de un pozo en produccion con sistema de bombeo electrosumergible para los campos adjudicados a la empresa new granada energy corp | |
dc.title.english | Methodology for the determination conditions limit of profitable operation of a well in production with electrosumergible pumping system for the fields awarded to new granada energy corp. company* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
dspace.entity.type |