Metodología para determinar la cuadrilla de trabajo óptima en procesos de muros de mampostería H-12 desde el enfoque Lean Construction
dc.contributor.advisor | Mejía Aguilar, Guillermo | |
dc.contributor.author | Ardila Cubillos, Ray Andrés | |
dc.contributor.evaluator | Meneses Flórez, Jorge Enrique | |
dc.contributor.evaluator | Tijo López, Silvia Juliana | |
dc.date.accessioned | 2023-03-08T20:15:22Z | |
dc.date.available | 2023-03-08T20:15:22Z | |
dc.date.created | 2023-03-06 | |
dc.date.issued | 2023-03-06 | |
dc.description.abstract | La importancia de la industria de la construcción queda manifiesta respecto de la cantidad de empleos directos que genera y su aporte tanto al PIB como a la economía local y global, por otro lado, es evidente el uso masivo del recurso de mano de obra en los proyectos de construcción. El indicador relacionado a dicho recurso es la productividad laboral, que en las últimas décadas ha mostrado bajo incremento a nivel global e incluso desaceleración a nivel local. Esta investigación aporta un marco teórico para el diseño de la cuadrilla de trabajo óptima en procesos constructivos, en relación de la cantidad de integrantes y su capacitación, aplicando el enfoque basado en la producción Lean Construction, respecto del flujo de trabajo y eliminación de pérdidas, bajo las restricciones de demanda de producción y plazo de ejecución, de cara a mejorar la productividad laboral. Se realiza la observación del proceso de mampostería H-12 en un caso de estudio, se identifican las labores y tareas que lo componen, así como el tipo de trabajo y su responsable, adicionalmente, se diseña y aplica una encuesta a 60 empresas locales para indagar sobre los métodos de determinación de cuadrillas de trabajo que emplean. Como resultado se obtiene un modelo de la cuadrilla que realiza el proceso seleccionado, además, se plantean las ecuaciones para la determinación la cuadrilla óptima de acuerdo al número de integrantes y su capacitación, empleando la programación lineal de restricciones para la optimización del sistema. Finalmente se propone una metodología para dicha determinación que tiene en cuenta los parámetros del proyecto y las características de la cuadrilla. Se evidencia informalidad en la determinación de los integrantes de la cuadrilla de trabajo en procesos constructivos en obra, que trae fenómenos subyacentes como la tercerización y la subcontratación laboral. | |
dc.description.abstractenglish | The importance of the construction industry is evident with respect to the number of direct jobs it generates and its contribution to both GDP and the local and global economy, on the other hand, the massive use of labor resources in the construction projects. The indicator related to this resource is labor productivity, which in recent decades has shown low growth at the global level and even deceleration at the local level. This research provides a theoretical framework for the design of the optimal work crew in construction processes, in relation to the number of members and their training, applying the approach based on Lean Construction production, regarding the workflow and elimination of losses, under the restrictions of production demand and execution time, in order to improve labor productivity. The observation of the H-12 masonry process is carried out in a case study, the tasks and tasks that compose it are identified, as well as the type of work and its person in charge, additionally, a survey is designed and applied to 60 local companies to inquire about the methods of determining work crews that they use. As a result, a model of the crew that performs the selected process is obtained, in addition, the equations for determining the optimal crew according to the number of members and their training are proposed, using linear constraint programming for the optimization of the system. Finally, a methodology is proposed for said determination that takes into account the parameters of the project and the characteristics of the crew. Informality is evident in the determination of the members of the work crew in construction processes on site, which brings underlying phenomena such as outsourcing and labor subcontracting. | |
dc.description.degreelevel | Maestría | |
dc.description.degreename | Magíster en Ingeniería Civil | |
dc.description.googlescholar | https://scholar.google.com/citations?user=7oiv0g8AAAAJ | |
dc.description.orcid | https://orcid.org/0009-0003-2521-7265 | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/12457 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Maestría en Ingeniería Civil | |
dc.publisher.school | Escuela de Ingenieria Civil | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Cuadrilla de trabajo | |
dc.subject | Procesos constructivos | |
dc.subject | Mampostería | |
dc.subject | Lean Construction | |
dc.subject | Productividad Laboral | |
dc.subject | Programación Lineal de Restricciones | |
dc.subject | subcontratación | |
dc.subject | BPMN 2.0 | |
dc.subject | Modelo | |
dc.subject.keyword | Work crew | |
dc.subject.keyword | Construction processes | |
dc.subject.keyword | Masonry | |
dc.subject.keyword | Lean Construction | |
dc.subject.keyword | Labor Productivity | |
dc.subject.keyword | Constraint Linear Programming | |
dc.subject.keyword | subcontracting | |
dc.subject.keyword | BPMN 2.0 | |
dc.subject.keyword | Model | |
dc.title | Metodología para determinar la cuadrilla de trabajo óptima en procesos de muros de mampostería H-12 desde el enfoque Lean Construction | |
dc.title.english | Methodology to Determine the Optimal Work Crew in H-12 Masonry Wall Processes from the Lean Construction Approach | |
dc.type.coar | http://purl.org/coar/resource_type/c_bdcc | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Maestría | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 152.7 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 164.07 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: