Análisis de impactos de los tiempos de licenciamiento ambiental respecto al cumplimiento de los compromisos contractuales con la agencia nacional de hidrocarburos para el bloque exploratorio 1 a
dc.contributor.advisor | Buitrago Moreno, Viviana | |
dc.contributor.author | Pedroza Pinzon, Natalia | |
dc.date.accessioned | 2024-03-03T20:41:22Z | |
dc.date.available | 2014 | |
dc.date.available | 2024-03-03T20:41:22Z | |
dc.date.created | 2014 | |
dc.date.issued | 2014 | |
dc.description.abstract | Esta Monografía presenta el análisis de impactos de los tiempos de licenciamiento ambiental respecto al cumplimiento de los compromisos contractuales con la Agencia Nacional de Hidrocarburos (ANH) para el Bloque Exploratorio 1A a partir de los tiempos definidos por la Autoridad Nacional de Licencias Ambientales (ANLA). El subsuelo colombiano en administración de La Agencia Nacional de Hidrocarburos (ANH) asigna las áreas de exploración nacional a través de contratos de Exploración y Producción (E&P) los cuales contemplan un periodo de tiempo para el cumplimiento de la etapa exploratoria de seis (6) años dividido en dos fases cada una de tres (3) años, sin embargo, actualmente el Contrato E&P del Bloque Exploratorio 1A ha estado en riesgo de incumplimiento por los impactos generados durante el periodo de licenciamiento ambiental, debido a los tiempos reales que tomó la Autoridad Nacional de Licencias Ambientales (ANLA), para la expedición de resolución que otorga la Licencia Ambiental. Teniendo en cuenta el tiempo que requirió la ANLA para otorgar la Licencia Ambiental, la operadora opto como estrategia, para dar cumplimiento a los compromisos contractuales: , en primera instancia solicitar a la ANH la restitución de tiempo y posteriormente solicitar la unificación de fases exploratorias, acciones que presentan un riesgo de alto impacto para la operadora, ya que la respuesta por parte de la Agencia, puede darse a favor o en contra de la operadora quedando expuesto el contrato E&P a multas o incluso en el peor de los escenarios deberá hacer entrega del área, generando afectación económica y de imagen corporativa. A partir del planteamiento anteriormente realizado se desarrollará un Análisis de Impactos del iempo real de obtención de Licencia Ambiental en el Contrato de Exploración y Producción para lo cual se realizara una valoración de los riesgos identificados durante este periodo. | |
dc.description.abstractenglish | This monograph presents the impact analysis of the timing of environmental licensing regarding the fulfillment of the contractual commitments with the National Agency of Hydrocarbons (NAH) for the exploratory block 1A from the timing defined by the national authority of environmental licenses. The subsoil of the Colombian administration of the National Agency of Hydrocarbons (NAH) assign areas for national exploration through contracts for exploration and production (E & P), which include a time frame for the fulfillment by six (6) years exploratory stage divided in two phases each one for three (3) years, however, currently E & P contract from the exploratory block 1A has been at risk of non-compliance by the impacts generated during the environmental licensing period, due to actual times that took the national authority of environmental licenses, for the issuance of resolution granted the environmental license. According time requiring the ANLA to give the environmental license, operator decided as a strategy, to comply with the contractual commitments: first ask the ANH for time restitution and subsequently apply for the unification of exploratory phases, actions that have a high impact risk for operator, since the response of the Agency It may be for or against the operator, being exposed contract E & P to fines or even in the worst of scenarios should be delivery of the area, generating economic involvement and corporate image. From the approach previously carried out impacts analysis about real-time to obtain Environmental License, it will take time to place in exploration and production contract for which will be held an assessment of the risks identified during this period. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Hidrocarburos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/30431 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Especialización en Gerencia de Hidrocarburos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Impactos | |
dc.subject | Tiempos | |
dc.subject | Compromisos Contractuales | |
dc.subject.keyword | Mpacts | |
dc.subject.keyword | Timing | |
dc.subject.keyword | Contractual Commitments | |
dc.title | Análisis de impactos de los tiempos de licenciamiento ambiental respecto al cumplimiento de los compromisos contractuales con la agencia nacional de hidrocarburos para el bloque exploratorio 1 a | |
dc.title.english | Impacts analysis of environmental licensing times with respect to the fullfilment of the contractual commitments with the national agency of hydrocarbons for the exploratory block contractuales 1 a. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 247.45 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 280.98 KB
- Format:
- Adobe Portable Document Format