Programa de mantenimiento preventivo del sistema de automatización de la sede principal y facultad de salud de la Universidad Industrial de Santander
dc.contributor.advisor | Ortiz Rangel, Manuel Jose | |
dc.contributor.advisor | Ordoñez Plata, Gabriel | |
dc.contributor.author | García Rodriguez, Maria Teresa | |
dc.contributor.author | Hernández Osorio, David Andrés | |
dc.date.accessioned | 2024-03-03T20:42:17Z | |
dc.date.available | 2014 | |
dc.date.available | 2024-03-03T20:42:17Z | |
dc.date.created | 2014 | |
dc.date.issued | 2014 | |
dc.description.abstract | El objetivo principal de este trabajo de grado es realizar el programa de mantenimiento preventivo del SISTEMA BAS DE CONTROL DE ACCESO PEATONAL Y VEHICULAR DE LA SEDE PRINCIPAL Y FACULTAD DE SALUD DE LA UNIVERSIDAD INDUSTRIAL DE SANTANDER. El desarrollo de este proyecto se divide en varias etapas que se presentan a lo largo del proyecto de la siguiente manera: La primera comprende la identificación y organización de las entradas y salidas de la institución; la segunda etapa incluye el reconocimiento, inventario, codificación y elaboración de fichas técnicas de los equipos que hacen parte del sistema junto con el respectivo análisis de criticidad; la tercera, por su parte, contiene el análisis de las diferentes estrategias para implementar el plan de mantenimiento, así como la selección y aplicación de la estrategia más adecuada; la cuarte y última etapa comprende el estudio de diferentes software o herramientas de gestión documental, selección del más adecuado e implementación del mismo incluyendo toda la información necesaria e importante a la hora de realizar el mantenimiento preventivo de forma correcta. De esta forma se planteó un plan de mantenimiento capaz de involucrar al personal de trabajo de forma definitiva con la tarea de prevenir fallas en los equipos y el mejoramiento por parte de los mismos facilitando los procesos de gestión implementando un software de gestión documental. | |
dc.description.abstractenglish | The main objective of this thesis is to create the preventive maintenance program for THE BAS CONTROL SYSTEM OF PEDESTRIAN AND VEHICULAR ACCESS TO THE MAIN CAMPUS AND FACULTY OF HEALTH OF THE INDUSTRIAL UNIVERSITY OF Santander. The development of this project is divided into several stages that are presented along the project in the following way: The first involves the identification and organization of the entrances and exits of the institution; The second stage includes the recognition, inventory, codification and development of technical specifications of the equipment which are part of the system with the respective criticality analysis; the third, contains the analysis of different strategies to implement the maintenance plan and the selection and application of the most appropriate strategy; The fourth and final step involves the study of different software and document management tools, and selection of the correct implementation of it including all the necessary and important information to perform preventive maintenance in the right way. This maintenance plan was formulated in a way, that it involves all the staff with the task of preventing equipment failures and improving their performance. Therefore, it will make easier to manage documents thanks to the implementation of a document management software. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Electrónico | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/30542 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Ingeniería Electrónica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Sistemas De Automatización En Edificaciones | |
dc.subject | Mantenimiento Preventivo | |
dc.subject | Criticidad De Equipos | |
dc.subject | Programa De Mantenimiento Preventivo. | |
dc.subject.keyword | Building Automation Systems | |
dc.subject.keyword | Preventive Maintenance | |
dc.subject.keyword | Equipment Criticality | |
dc.subject.keyword | Preventive Maintenance Program. | |
dc.title | Programa de mantenimiento preventivo del sistema de automatización de la sede principal y facultad de salud de la Universidad Industrial de Santander | |
dc.title.english | Preventive maintenance program for the bas control system of pedestrian and vehicular access to the main office and faculty of health from the industrial university of Santander. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 772.53 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 856.88 KB
- Format:
- Adobe Portable Document Format