Viabilidad técnica y económica de la perforación under balance aplicada al campo escuela colorado
dc.contributor.advisor | Calvete González, Fernando Enrique | |
dc.contributor.author | Afanador Pinzón, Carlos Augusto | |
dc.contributor.author | Delgado Gonzalez, Luis Eduardo | |
dc.date.accessioned | 2024-03-03T17:04:57Z | |
dc.date.available | 2008 | |
dc.date.available | 2024-03-03T17:04:57Z | |
dc.date.created | 2008 | |
dc.date.issued | 2008 | |
dc.description.abstract | La producción de hidrocarburos se enfoca actualmente en los campos maduros, ante la no existencia de grandes hallazgos petrolíferos. Determinar los mejores parámetros de explotación, perforación, producción y desarrollo de un campo petrolero requiere un estudio detallado del yacimiento, a fin de lograr el mayor desarrollo de este. La perforación Under Balance (UBD) no es una técnica de metodología reciente, se ha utilizado desde los años 50™s en países como Estados Unidos, Canadá, Turquía, Israel, Holanda, España, Grecia, Arabia Saudita, Italia, Libia. Es utilizada en la actualidad en todo el mundo gracias a los buenos resultados en evitar el daño a la formación, por consiguiente un mayor cuidado al yacimiento y una evidente mejoría en la producción del mismo. Un tipo de UBD es la MPD la cual utiliza un sistema de lodo presurizable y cerrado que permite la rotación de la tubería y viajes a baja presión, este tipo de perforación UBD es el utilizado para desarrollar este proyecto. En el presente trabajo, se propone la viabilidad técnica de diseño de perforación para dos nuevos pozos en la estructura del Campo Colorado, un pozo vertical y uno direccional mediante perforación UBD/MPD con espuma, se menciona su ubicación geográfica, propiedades petrofísicas, arenas e intervalos a cañonear y posible producción de cada unos de los pozos. Por ultimo, se describe una viabilidad económica del mismo, indicando, con base en los costos requeridos, la tasa de producción esperada y el valor del precio del petróleo esperado, se realiza el análisis de rentabilidad económica de este proyecto. | |
dc.description.abstractenglish | The hydrocarbon production is focus nowadays in the fields already developbecause of the lack of new discoveries in the oil business. To determine the bestexploration, drilling, production and development parameters for an oil field, athoughtful study of the reservoir is needed in order to optimize in the best way thedevelopment of this. The Under Balance drilling (UBD) is not a recently develop technique. It is beenused since the late 50’s in countries such as USA, Canada, Israel, Nederland,Spain, Greece, Saudi Arabia, Italy and Libya. This technique is used due to theexcellent results to avoid the well bore damage taking care of the reservoir andimproving the production of the same. One type of UBD is the MPD which uses thepressurized and closed mud system that allows the drill pipe spinning and has theeffect of low pressure trips. This type of UBD is the one we studied in this thesis. In this proyect we are proposing the tecnicall viability of the drilling design for twonew wells in the Colorado field layout.One of those wells is a Vertical design an theother is a directional one using UBD/MPD with foam. We are mentioning theirgeografic position, petrophysical caracteristics, zones of interest and posibleproduction the well will have once it is develop. The economics are also describebased in the required Money input that is needed, the predicted production rateand a predicted barrel of oil price for the same. A utility analisys was made for thewellsin thes proyect too. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero de Petróleos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/21234 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería de Petróleos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Campos Maduros | |
dc.subject | Perforación Under Balance | |
dc.subject | Campo Colorado | |
dc.subject | Viabilidad | |
dc.subject | MPD | |
dc.subject | espumas. | |
dc.subject.keyword | Develop fields | |
dc.subject.keyword | Under balance drilling | |
dc.subject.keyword | Colorado Field | |
dc.subject.keyword | Viability | |
dc.subject.keyword | MPD | |
dc.subject.keyword | Foam. | |
dc.title | Viabilidad técnica y económica de la perforación under balance aplicada al campo escuela colorado | |
dc.title.english | Tecnical viability and economics for the underbalance drilling aplied to the faculty field ficolorado.* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |