Estrategias para disminuir la producción de arenas en la etapa de recobro secundario del campo la cira infantas
dc.contributor.advisor | Hernandez Trejos, Edelberto | |
dc.contributor.author | Dueñas Criado, Danuil Elías | |
dc.date.accessioned | 2024-03-03T17:05:01Z | |
dc.date.available | 2008 | |
dc.date.available | 2024-03-03T17:05:01Z | |
dc.date.created | 2008 | |
dc.date.issued | 2008 | |
dc.description.abstract | La producción de arena es un problema muy típico en los campos de aceite alrededor del mundo, y constituye un desafío para los ingenieros de completamiento establecer una estrategia de control sin comprometer los caudales de aceite. Durante la explotación del campo La Cira Infantas (LCI) el problema del arenamiento se ha visto reflejado en la reducción de las tasas de producción de crudo y en el aumento de intervenciones. Debido a la inyección de agua implementada en el campo, la frecuencia y severidad de la producción de arena ha aumentado, lo cual exalta la necesidad de un manejo óptimo de la arena. Este proyecto envolvió el análisis de las causas de la producción de arena en el campo LCI, mediante la caracterización de las arenas de las formaciones de interés; y la evaluación del impacto, mediante la revisión de las intervenciones de pozo llevadas a cabo durante el proyecto de colaboración empresarial entre Occidental Andina y Ecopetrol, encontrándose como principal causa: la inyección de agua. Se realizó la evaluación de la campaña de empaquetamiento llevada a cabo como método de control, observándose la gran posibilidad de implementarse como estrategia de completamiento en la actualidad. Con base en el análisis histórico del problema de arenamiento en el campo LCI y del método de control aplicado se definió la estrategia para minimizar la producción de arena, la cual consiste de tres fases, así: la primera fase envuelve el empaquetamiento convencional con grava de pozos pilotos, en la segunda fase mediante la evaluación de los resultados se analiza si realizar más empaquetamientos convencionales o se estudia la posibilidad de emplear otros métodos de control, y en la tercera y última fase se evalúan los resultados generales y se realiza la implementación al campo. | |
dc.description.abstractenglish | Sand production is a common problem in the oil fields around the world and constitutes a challenge for completion engineers establish a control strategy without compromising the oil rates. During the exploitation of the field La Cira Infantas (LCI), the impact of sanding has been reflected in reduced rates of oil production and increasing interventions. Due to the water injection implemented in the field, the frequency and severity of sand production has increased, which exalts the need for an optimal management of the sand. This project involved the analysis of the causes of the sand production in the field LCI, through the characterization of the sand formations of interest and impact assessment, by reviewing the wells maintenances carried out during the project for business collaboration between Occidental Andina and Ecopetrol, found as the main cause: the injection of water. It was performed the evaluation of the campaign packaging conducted as a method of control, with the strong possibility of completion strategy implemented as at present. Based on historical analysis of the problem of sanding in the field LCI and control method applied is defined strategy to minimize the production of sand, which consists of three phases, as follows: The first phase involves packaging with conventional gravel pilots wells, in the second phase by evaluating the results is discussed whether to conduct more conventional packaged or considering using other methods of control, and in the third and final phase will evaluate the overall results and is implementing the field | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero de Petróleos | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/21261 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería de Petróleos | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Producción de Arena | |
dc.subject | Métodos de Control | |
dc.subject | Naturaleza del Arenamiento | |
dc.subject | Intervenciones de pozos | |
dc.subject | Campo La Cira Infantas | |
dc.subject | Empaquetamiento con grava. | |
dc.subject.keyword | Sand production | |
dc.subject.keyword | Sand Control | |
dc.subject.keyword | Nature of Sanding | |
dc.subject.keyword | Wells maintenance | |
dc.subject.keyword | Field La Cira-Infantas | |
dc.subject.keyword | Gravel Pack. | |
dc.title | Estrategias para disminuir la producción de arenas en la etapa de recobro secundario del campo la cira infantas | |
dc.title.english | Strategy to reduce sand production at stage secondary recovery in field la cira infantas* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |