Plan de acción para las tuberías de los oleoductos de los departamentos de Putumayo y Nariño de Ecopetrol S.A. basado en el desarrollo de la técnica rbi (risk based inspection)
dc.contributor.advisor | Mora Gutiérrez, Alberto | |
dc.contributor.author | Arévalo Pinto, Oscar Mauricio | |
dc.contributor.author | Ramos Bettin, Robinson Rafael | |
dc.date.accessioned | 2024-03-03T19:39:48Z | |
dc.date.available | 2012 | |
dc.date.available | 2024-03-03T19:39:48Z | |
dc.date.created | 2012 | |
dc.date.issued | 2012 | |
dc.description.abstract | La aplicación real de la metodología conocida como RBI (Risk Based Inspection) o Inspección Basada en Riesgo normalizada por el American Petroleum Institute (API) en su documento API 580 es la base fundamental de este trabajo. Cuando la gestión de mantenimiento, en este caso la del equipo estático, obedece a metodologías organizadas y normalizadas internacionalmente se obtienen resultados mucho más satisfactorios que cuando se actúa de acuerdo a las necesidades del día a día, de hecho, por esto es que en la gestión de mantenimiento de las empresas se comienza a hablar de confiabilidad y de metodologías de análisis. En el caso del Departamento de Operaciones Sur (PMS) de la Vicepresidencia de Transporte de Ecopetrol S.A. la gestión de mantenimiento de las tuberías que componen los Oleoductos Transandino (OTA), San Miguel Orito (OSO), Mansoyá Orito (OMO) y Churuyaco Orito (OCHO) se limitaba a las acciones mínimas y reactivas para operar acarreando un alto costo en dicha gestión. Haciendo los talleres RBI con el compromiso de la alta gerencia de la compañía, en cabeza del Departamento de Integridad la gestión de mantenimiento de PMS puede vislumbrar una planeación en la ejecución de las actividades que, en muchos casos, es aplicable para todos los oleoductos permitiendo así la optimización de sus costos. El producto de la aplicación de la metodología descrita en el API 580, que entre otras cosas es política corporativa de Ecopetrol S.A., es la elaboración de un plan de acción a mediano y largo plazo que garantice varias cosas: el aseguramiento del presupuesto para la ejecución de las actividades; la correcta planeación de dichas actividades salvaguardando siempre la vida de las personas, el medio ambiente y la infraestructura; la disponibilidad, confiabilidad y mantenibilidad del sistema de transporte y en general una mejor gestión de activos. | |
dc.description.abstractenglish | The actual application of the methodology known as RBI (Risk Based Inspection) and Risk Based Inspection standardized by the American Petroleum Institute (API) in its document API 580 is the basis of this work. When maintenance management, in this case the static team, follows internationally standardized methodologies organized and the results are much more satisfactory than when we act according to the needs of everyday life, in fact, that is why in the maintenance management companies start talking about reliability and analysis methodologies. In the case of South Operations Department (PMS) of the Vice President of Ecopetrol S.A. Transport maintenance management of the pipes making up the Pipeline Trans (OTA), San Miguel - Orito (OSO), Mansoyá - Orito (OMO) and Churuyaco - Orito (OCHO) was limited to the minimum and reactive actions to operate carrying a high cost in such management. RBI doing workshops with the commitment of the top management of the company, headed by INT maintenance management of PMS can glimpse a planning in the implementation of activities that in many cases, is applicable to all pipelines allowing and optimizing costs. The result of the application of the methodology described in API 580, which among other things is Ecopetrol S.A. corporate policy is the development of an action plan in the medium and long term to ensure several things: ensuring the implementation of the budget for activities, the proper planning of such activities and respected the lives of people, the environment and infrastructure, availability, reliability and maintainability of the transportation system and overall better management of assets. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/27710 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Mantenimiento basado en riesgo | |
dc.subject | Riesgo | |
dc.subject | Mantenimiento | |
dc.subject | Oleoductos | |
dc.subject | Ecopetrol | |
dc.subject | RBI. | |
dc.subject.keyword | Maintenance based on risk | |
dc.subject.keyword | Risk | |
dc.subject.keyword | Maintenance | |
dc.subject.keyword | Pipelines | |
dc.subject.keyword | Ecopetrol | |
dc.subject.keyword | RBI. | |
dc.title | Plan de acción para las tuberías de los oleoductos de los departamentos de Putumayo y Nariño de Ecopetrol S.A. basado en el desarrollo de la técnica rbi (risk based inspection) | |
dc.title.english | Action plan for pipelines pipelines departments of putumayo and nariño ecopetrol sa based on the technical development rbi (risk based inspection). | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 510.82 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 539.99 KB
- Format:
- Adobe Portable Document Format