Preparación, seguimiento y control del plan semanal de perforación en la mina de níquel cerro matoso, Montelíbano, Córdoba
dc.contributor.advisor | Cruz Guevara, Luis Enrique | |
dc.contributor.author | Rincon Martínez, Ana Carmela | |
dc.date.accessioned | 2024-03-03T20:37:15Z | |
dc.date.available | 2014 | |
dc.date.available | 2024-03-03T20:37:15Z | |
dc.date.created | 2014 | |
dc.date.issued | 2014 | |
dc.description.abstract | En la unidad de exploración de la empresa Cerro Matos S.A. se desarrollan trabajos que están concentrados en explorar y explotar áreas con alta mineralización que proporcionen los recursos necesarios para seguir con el desarrollo de los proyectos dentro de la unidad. En el marco de la práctica se realizaron actividades enfocadas en apoyar al planner de la unidad de exploración dentro de la preparación semanal del plan de perforaciones el cual está enmarcado en el desarrollo de actividades que implican el trabajo de un equipo multidisciplinario; se hace énfasis en la preparación semanal de información entregable a los geólogos de campo y que está ligada a la descripción de ripios y que posteriormente suministra la información con la cual se procede a la actualización y control de bases de datos que son usadas por los diferentes profesionales de la unidad. A lo largo de la práctica se prepararon 22 entregables para reunión semanal de geólogos de campo, lo que se traduce en el mismo número de reuniones llevadas a cabo con el propósito de contextualizar geológicamente al personal con el entorno en el cual se van a desarrollar las perforaciones y la cual es coordinada por el estudiante en práctica. Se preparó plan de perforación y sus equivalentes en la tabla de muestras especiales para el plan de QA/QC de un alto número de puntos, de los cuales solo 130 fueron perforados; posteriormente les fue asignado número consecutivo de perforación identificándolos dentro del conteo histórico de pozos perforados por la empresa. | |
dc.description.abstractenglish | In the scanning unit of the Cerro Matos SA company, jobs are concentrated in exploring and exploiting areas of high mineralization provide the necessary resources to continue the development of projects within the unit are developed. In the practica, some activities were focused on supporting the planner of the scanning unit in the weekly preparation of drilling plan which is framed in the development of activities that involve the work of a multidisciplinary team is made; it emphasizes the weekly preparation of deliverable information to field geologists and is linked to the description of cuttings and subsequently provides the information with which we proceed to update and control databases that are used by different unit professionals. Throughout practice 22 weekly meeting deliverables for field geologists were prepared , resulting in the same number of meetings held for the purpose of geological context staff with the environment in which they are to develop perforations and which is coordinated by the student in practice. Drilling plan was prepared and their equivalents in the table of special plan samples for QA / QC of a high number of points, of which only 130 were drilled ; they subsequently was assigned consecutive number of identifying them within the historical drilling wells drilled by counting the company. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Geólogo | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/30012 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Geología | |
dc.publisher.school | Escuela de Geología | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Plan De Perforaciones | |
dc.subject | Descripción De Ripios | |
dc.subject | Qa/Qc. | |
dc.subject.keyword | Plan Drilling | |
dc.subject.keyword | Cuttings Description | |
dc.subject.keyword | Qa/Qc. | |
dc.title | Preparación, seguimiento y control del plan semanal de perforación en la mina de níquel cerro matoso, Montelíbano, Córdoba | |
dc.title.english | Preparation, monitoring and control plan weekly drilling in nickel mine cerro matoso, montelibano, cordoba. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 436.25 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 53.08 KB
- Format:
- Adobe Portable Document Format