Practica empresarial instalación, mantenimiento y verificación de puntos del sistema integrado de monitoreo de corrosión (icms3) en las plantas u-2000, u-250 y u-150 del complejo petrolero de Barrancabermeja
dc.contributor.advisor | Silva Gutierrez, Emiliano | |
dc.contributor.author | Prada Quintero, Juan Carlos | |
dc.date.accessioned | 2024-03-03T17:01:47Z | |
dc.date.available | 2008 | |
dc.date.available | 2024-03-03T17:01:47Z | |
dc.date.created | 2008 | |
dc.date.issued | 2008 | |
dc.description.abstract | El proyecto, fiINSTALACION, MANTENIMIENTO Y VERIFICACION DE PUNTOS DEL SISTEMA INTEGRADO DE MONITOREO DE CORROSION (ICMS3) EN LAS PLANTAS U2000, U-250 Y U-150 DEL COMPLEJO PETROLERO DE BARRANCABERMEJA tenia como objetivo reparar el sistema de monitoreo de corrosión en las plantas U-2000, U-250 y U-150 del Complejo Petrolero de Barrancabermeja. El ICMS3 es un sistema de monitoreo de corrosión en línea, el cual permite la obtención de datos de pérdida de peso o velocidad de corrosión cada cinco minutos, esto se logra gracias a sensores electrónicos, llamados probetas que por medio de técnicas de monitoreo de corrosión como: resistencia eléctrica (ER) o resistencia a la polarizaciòn lineal (LRP); envían los datos a un computador, el cual por medio del software AMULET, muestra los datos en forma de graficas, histogramas, reportes y permite la manipulación de estos. Para comprobar el funcionamiento del sistema de monitoreo de corrosión reparado, se realizaron pruebas de aceptación en campo (SAT), la primera fue la prueba SAT con probeta de prueba, la cual se realiza con patrones definidos con un valor de chequeo, que no tienen un significado físico y solo es para comprobar el funcionamiento; la segunda prueba SAT fue realizada a partir de la comparación de los resultados obtenidos entre el ICMS3 y el equipo CORRDATA MATE II, el cual es un equipo portátil que utiliza la técnica de resistencia eléctrica; La tercera prueba SAT se realizó con probetas CORROSOMETER, que fue la instalación de la probetas al sistema y comprobación de sus resultados. | |
dc.description.abstractenglish | The project, fiINSTALLATION, MAINTENANCE AND VERIFICATION OF POINTS OF INTEGRATED CORROSION MONITORING SYSTEM IN THE LAYOUT U-2000, U-250 AND U-150 OR TANKERS COMPLEX OF BARRANCABERMAJA had as a goal repair the monitoring system of corrosion in the layout U-2000, U-250 and U-150 of tankers complex of Barrancabermeja. The ICMS3 is a monitoring corrosion system online, which allows data to weight loss and rate corrosion each five minutes, this is achieved through electronic sensors, kown probets that through monitoring techniques corrosion as electrical resistance (ER) or resistance to polarizaciòn linear (LRP); sending data to a computer, which using the software amulets, shows the data in the form of diagrams, histograms, reports and allows the manipulation of these. To check the functioning of the monitoring system corrosion repaired, acceptance tests were conducted in field (SAT), the first test was the SAT with test probe, which is done with patterns defined with a value of checkup, which have not a physical meaning and is only to verify operation, the second SAT test was conducted from the comparison of results between ICMS3 and equipment CORRDATA MATE II, which is a laptop that uses the technique of electrical resistance; The third test was conducted SAT CORROSOMETER probe, which was installing the system and test probe to check their results. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Metalúrgico | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/20835 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicoquímicas | |
dc.publisher.program | Ingeniería Metalúrgica | |
dc.publisher.school | Escuela de Ingeniería Metalúrgica y Ciencia de Materiales | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | ICMS3 | |
dc.subject | AMULET | |
dc.subject | Resistencia eléctrica | |
dc.subject | Resistencia a la polarizaciòn lineal. | |
dc.subject.keyword | ICMS3 | |
dc.subject.keyword | AMULET | |
dc.subject.keyword | Electrical resistance | |
dc.subject.keyword | Lineal resistance polarization. | |
dc.title | Practica empresarial instalación, mantenimiento y verificación de puntos del sistema integrado de monitoreo de corrosión (icms3) en las plantas u-2000, u-250 y u-150 del complejo petrolero de Barrancabermeja | |
dc.title.english | Installation, maintenance and verification of points of integrated corrosion monitoring system (icms3) in the layout u-2000, u250 and u-150 of tankers complex of barrancabermeja. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |